+
Fri Jan 27 09:05:41 2012, steve, Update, SUS, OSEM locking plunger
| +
Mon Jan 30 08:17:06 2012, steve, Update, IOO, PMC
| +
Mon Jan 30 16:18:51 2012, steve, Update, PEM, Roscolux colored film transmittance at 1064 nm
| +
Tue Jan 31 08:44:10 2012, steve, Update, IOO, laser shuts down
| +
Tue Jan 31 17:13:49 2012, steve, Update, IOO, only the PSL laser is off
| +
Wed Feb 1 17:00:57 2012, steve, Update, IOO, laser is back ON  
| +
Fri Feb 3 14:47:51 2012, steve, Update, PEM, laser interlock drawing
|
Fri Feb 3 16:13:49 2012, steve, Update, PEM, LED lights for chamber illumination
| +
Fri Feb 3 17:31:09 2012, steve, Update, General, green welding glass
| +
Mon Feb 6 11:07:21 2012, steve, Update, SUS, Oplev QPD Sum Trends are suspicious
| +
Mon Feb 6 17:06:11 2012, steve, Update, SUS, oplev transferfunction of PIT: ETMY & ETMX 
| +
Tue Feb 7 16:30:46 2012, steve, Update, SUS, ALL oplev PIT transfer functions 7x
| +
Wed Feb 8 16:37:02 2012, steve, Update, SUS, ITMX OSEM LL is sick  
| +
Thu Feb 9 16:46:02 2012, steve, Update, SUS, ALL oplev YAW transfer functions 7x
| +
Thu Feb 9 17:11:05 2012, steve, Update, SUS, more OSEM problems   
| +
Fri Feb 10 11:01:31 2012, steve, Update, IOO, crazy ground motion
| +
Fri Feb 10 11:46:44 2012, steve, Update, IOO, seismic noise back to normal  
|
Fri Feb 10 15:46:59 2012, steve, Update, SUS, ruby wire standoff
|
Fri Feb 10 15:54:27 2012, steve, Update, PEM, AC turned back ON
|
Tue Feb 14 08:22:27 2012, steve, Update, SUS, sus damping restored
| +
Tue Feb 14 17:09:05 2012, steve, Update, General, reflectivity of green welding glass 
| +
Wed Feb 15 11:34:01 2012, steve, Update, , under the shouth end optical table 
|
Thu Feb 16 09:59:16 2012, steve, Update, ASC, IP- ANG
|
Tue Feb 21 08:33:16 2012, steve, Update, Green Locking, periscope adapter plate
| +
Thu Feb 23 09:09:33 2012, steve, Update, SAFETY, safety checks
| +
Thu Feb 23 10:53:54 2012, steve, Update, SUS, oplev PIT transfer functions
| +
Fri Feb 24 08:06:52 2012, steve, Update, SUS, sus restored 
| +
Mon Feb 27 10:21:37 2012, steve, Update, SAFETY, safety audit tomorrow morning
| +
Mon Feb 27 14:35:22 2012, steve, Update, SUS, oplev YAW transfer functions
| +
Tue Feb 28 11:20:51 2012, steve, Update, SAFETY, safety audit 2012
| +
Thu Mar 1 09:26:50 2012, steve, Update, SUS, SOS baffle plates are ready
|
Wed Mar 7 11:20:23 2012, steve, Update, SUS, oplev qpd offsets zeroed
|
Fri Mar 9 10:17:06 2012, steve, HowTo, PEM, do not leave tables open
|
Fri Mar 9 10:44:57 2012, steve, Update, RF System, OSA
|
Fri Mar 9 16:00:46 2012, steve, Update, Green Locking, laser emergency shut down switch replaced at the south end
| +
Wed Mar 14 10:06:26 2012, steve, Update, Green Locking, dichroic mirror quotes
|
Tue Mar 20 09:59:01 2012, steve, Update, IOO, Laser tripped off
|
Tue Mar 20 16:53:48 2012, steve, Update, PEM, cranes maintenance & certified inspection of 2012
| +
Wed Mar 21 10:31:28 2012, steve, Update, SAFETY, AC power to ETMY turned off
| +
Wed Mar 21 11:32:47 2012, steve, Update, SAFETY, AC power to ETMX turned off
| +
Wed Mar 21 19:12:27 2012, steve, Update, Computers, AC power back on both ends
| +
Thu Mar 22 08:14:21 2012, steve, Update, Green Locking, dichroic mirror quotes with large wedge
|
Fri Mar 30 08:58:37 2012, steve, Update, SAFETY, Safety glasses checked
| +
Fri Mar 30 09:37:13 2012, steve, Update, SAFETY, safety audit 2012 CORRECTIONS
| +
Fri Mar 30 10:24:14 2012, steve, Update, SUS, new OSEM locking plunger  
| +
Fri Mar 30 17:37:09 2012, steve, Update, General, cutting green welding glass for beam dumps
|
Tue Apr 24 09:58:37 2012, steve, Update, PEM, earthquake 3.9 magnitude
|
Tue Apr 24 11:27:51 2012, steve, Update, PEM, new chairs
| +
Thu Apr 26 09:22:17 2012, steve, Update, , under the east end optical table
| +
Fri Apr 27 08:11:19 2012, steve, Update, CDS, c1ioo condition
|
|