40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 341 of 344  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Fri Mar 8 08:40:26 2019, Anjali, Configuration, , Frequency stabilization of 1 micron source Homodyne_setup.png
Entry  Tue Jun 11 19:25:58 2019, aaron, Configuration, BHD, Reviving the single OMC BHD design? singleOMC.pdf
Entry  Thu Jun 13 22:21:44 2019, Koji, Configuration, CDS, Paola wireless connected to martian 
    Reply  Fri Jun 21 19:22:40 2019, Koji, Configuration, BHD, Reviving the single OMC BHD design? 
Entry  Mon Jun 24 13:48:36 2019, Kruthi, Configuration, CDS, Giada wireless connection 
Entry  Wed Jul 17 17:56:18 2019, Koji, Configuration, Computers, Gave resolv.conf to giada 
    Reply  Thu Jul 25 14:28:03 2019, gautam, Configuration, Computers, firewalld disabled for EPICS CA donatellaCommissioning.png
Entry  Sun Dec 8 20:48:29 2019, rana, Configuration, Computers, Megatron: starts up grade 
    Reply  Wed Dec 11 22:01:24 2019, rana, Configuration, Computers, Megatron: starts up grade 
Entry  Mon Jan 13 15:47:37 2020, shruti, Configuration, Computer Scripts / Programs, c1psl burt restore 
Entry  Wed Jan 15 14:10:28 2020, Jon, Configuration, PSL, New EPICS database for C1PSL + C1IOO 
    Reply  Wed Jan 22 19:17:20 2020, gautam, Configuration, Computers, Megatron: starts up grade 
    Reply  Thu Jan 23 15:32:42 2020, gautam, Configuration, Computers, Megatron: starts up grade 
Entry  Thu Jan 23 23:07:04 2020, Jon, Configuration, PSL, c1psl breakout board wiring c1psl_feedthrough_wiring.pdf
Entry  Mon Jan 27 14:01:01 2020, Jordan, Configuration, General, Repurposed Sorenson Power Supply  
    Reply  Mon Jan 27 18:16:30 2020, gautam, Configuration, Computers, Sluggish megatron? 
    Reply  Tue Jan 28 15:39:04 2020, gautam, Configuration, Computers, Sluggish megatron? 
    Reply  Tue Jan 28 17:36:45 2020, gautam, Configuration, Computers, Local EPICS7.0 installed on megatron 
Entry  Tue Jan 28 19:12:30 2020, Jon, Configuration, PSL, Spare channels added to c1psl chassis c1psl_feedthrough_wiring_v2.pdf
Entry  Mon Jun 22 10:43:25 2020, Jon, Configuration, VAC, Vac maintenance at 11 am 
    Reply  Mon Jun 22 20:06:06 2020, Jon, Configuration, VAC, Vac maintenance complete Pumpdown-6-22-20.png
    Reply  Tue Jun 23 17:54:56 2020, rana, Configuration, VAC, Vac maintenance complete 
Entry  Wed Jul 1 18:03:04 2020, Jon, Configuration, VAC, UPS replacements 
    Reply  Thu Jul 9 18:00:35 2020, Jon, Configuration, VAC, UPS replacements 
Entry  Sat Aug 8 07:36:52 2020, Sanika Khadkikar, Configuration, Calibration-Repair, BS Seismometer - Multi-channel calibration BS_X-EY_X.pngBS_Y-EY_Y.pngBS_Z-EY_Z.pngtimeseries.png
Entry  Fri Aug 14 10:10:56 2020, Jon, Configuration, VAC, Vacuum repairs today 
    Reply  Sat Aug 15 02:02:13 2020, Jon, Configuration, VAC, Vacuum repairs today 
    Reply  Sat Aug 15 15:12:22 2020, Jon, Configuration, VAC, Overhaul of small turbo pump interlocks small_tp_signal_routing.pngsmall_tp_interlock_signal.pngsmall_tp_signal_routing.pngmedm_screen.png
Entry  Fri Dec 18 22:59:12 2020, Jon, Configuration, CDS, Updated CDS upgrade plan CDS_2020_Dec.pdfCDS_2020_Dec.graffle
    Reply  Mon Dec 21 09:28:50 2020, Jamie, Configuration, CDS, Updated CDS upgrade plan 
    Reply  Wed Dec 23 23:06:45 2020, gautam, Configuration, CDS, Updated CDS upgrade plan 
    Reply  Tue Jan 19 14:05:25 2021, Jon, Configuration, CDS, Updated CDS upgrade plan 40m_CDS_Network_-_Planned.pdf40m_CDS_Network_-_Current.pdf
    Reply  Tue Jan 19 15:43:24 2021, gautam, Configuration, CDS, Updated CDS upgrade plan 
    Reply  Mon Mar 15 20:40:01 2021, rana, Configuration, Computers, installed QTgrace on donatella for dataviewer cutiegrace.png
Entry  Wed Mar 17 09:05:01 2021, Paco, Anchal, Configuration, Computers, 40m Control Room Changes 
    Reply  Wed Apr 14 13:16:20 2021, Anchal, Configuration, Computers, 40m Control Room Changes 
Entry  Wed May 26 11:45:57 2021, Anchal, Paco, Configuration, IMC, MC2 analog camera 
Entry  Thu Aug 26 10:30:14 2021, Jamie, Configuration, CDS, front end time synchronization fixed? 
Entry  Mon Jan 24 12:33:41 2022, rana, Configuration, Wiki, AIC Wiki: txz files allowed 
Entry  Wed May 25 16:56:44 2022, Paco, Configuration, BHD, IFO recovery - IMC alignment 
    Reply  Wed May 25 17:34:47 2022, yuta, Configuration, BHD, IFO recovery - IFO alignment Screenshot_2022-05-25_17-47-57.png
    Reply  Thu May 26 19:55:43 2022, yuta, Configuration, BHD, Oplevs centered, BHD DCPDs are now online elog_1Y2.JPGelog_BHD.JPGelog_box.JPGScreenshot_2022-05-26_17-37-27_IFOaligned_OplevCentered.pngScreenshot_2022-05-26_20-35-02.png
    Reply  Fri May 27 17:45:53 2022, yuta, Configuration, BHD, BHD camera installed, GRY aligned 
    Reply  Thu Jun 2 20:05:37 2022, yuta, Configuration, PSL, IMC input power recovered to 1W, some alignment works Before.JPGAfter.JPG
    Reply  Fri Jun 3 12:13:58 2022, Paco, Configuration, CDS, Fix RFM channels  SoGreen.png
Entry  Mon Jun 6 16:09:23 2022, rana, Configuration, DetChar, Summary Pages: seis BLRMS 
    Reply  Thu Jun 16 18:23:15 2022, Paco, Configuration, BHD, Recovering LO beam in BHD DCPDs Screenshot_2022-06-16_18-29-14_BHDLObeamISBACK.png
    Reply  Tue Jun 21 14:17:50 2022, yuta, Configuration, BHD, BHD DCPDs re-routed to c1sus2 C1X07ADC1.JPGBHDDCPDs.JPG
    Reply  Tue Jul 19 16:00:34 2022, yuta, Configuration, BHD, Fast channels for BHD DCPDs now available in c1lsc but not in c1hpc Screenshot_2022-07-19_14-26-39_c1hpc.pngScreenshot_2022-07-19_14-24-49_c1lsc.pngScreenshot_2022-07-19_15-51-25_GreenGreen.png
    Reply  Thu Jul 21 21:50:47 2022, Tega, Configuration, BHD, c1sus2 IPC update 
ELOG V3.1.3-