  10845   Sun Dec 28 07:29:16 2014 SteveUpdateVACvacuum is normal

    

       
            
 3d.png 
  9749   Tue Mar 25 14:52:57 2014 steveUpdateVACvacuum is recovered Out
gassing plus leak rate   0.15 
 17hrsNoPumping.png 
  9615   Mon Feb 10 09:45:53 2014 SteveUpdateVACvacuum normal is reached 


 pd77m5d.png13daysAtm.png 
  13268   Tue Aug 29 15:35:19 2017 SteveUpdateVACvacuum pump specifications & manualsRP1 and RP3 roughing pump manual of
Leybold D30A oily rotory pump

Fore pump of
 1759489_995814a9-55c1-4fa1-b333-f446d272c1cc.jpg 
  7605   Wed Oct 24 09:15:12 2012 SteveUpdateVACvacuum rack 24V ps was current limited

    

       
            
 currentlimited24V.jpg 
  5590   Fri Sep 30 18:35:42 2011 steve, kiwamuUpdateVACvacuum set for poweroutageWe did the following:
1, closed V1, VM1,  annuloses:
VASE, VASV, VABS, VAEV,  VAEE and VA6
 prepforpoweroutage.png 
  13245   Wed Aug 23 10:11:46 2017 SteveUpdateVACvacuum valve specificationsThe V1
gate valve specs installed at 40m wiki
page. VAT model number 10846-UE44-0007 Our
  
  4059   Wed Dec 15 16:04:49 2010 steveConfigurationVACvacuum valves found in default conditionThis condition is created when we run out
of nitrogen that holds the valves in set
positions. The Maglev and other turbos are
  
  3009   Fri May 28 13:32:01 2010 alberto, kiwamuUpdateVACvacuum workWe started
a vacuum work in this morning. And still
  
  3010   Fri May 28 13:51:51 2010 JenneUpdateVACvacuum work


   
        
            
  
  3011   Fri May 28 14:24:30 2010 JenneUpdateVACvacuum workI just got off the phone with Alberto and
Kiwamu, and I'm going to try to recalculate
things based on their measurements of the
  
  2613   Thu Feb 18 15:39:16 2010 Koji and SteveConfigurationVACvalve condition: ALL OFFAs preparation for the upcoming planned
power outage we turned turbos, RGA off and
closed valves.
  
  5104   Wed Aug 3 09:40:13 2011 steveUpdateVACventThe vacuum system is coming up to atm.
The vent was started with slow N2 flow. The
PSL output is blocked 2 places on the table.
 pzt2011Aug3.png 
  44   Thu Nov 1 09:17:27 2007 steveRoutineVACvent 64Yesterday before vent I could not lock  MC,
therfore I could not measure the 
transmitted power at MC2 
 vent64.jpg 
  10559   Thu Oct 2 09:23:23 2014 SteveUpdateVACvent 77

    

       
            
 vent77SRMmoved.png 
  12237   Fri Jul 1 09:20:44 2016 SteveUpdateVACvent 78  VENT
OBJECTIVES:

1, Fix ETMX sus "jump issue"
 vent78.pngvent78at250T.png 
  12314   Wed Jul 20 11:39:07 2016 SteveUpdateVACvent 78 day 20RGA background scan




 vent78-d20.png 
  12383   Mon Aug 8 10:35:12 2016 SteveUpdatePEMvent 78 day 38 




 Vent38days.pngvent78d40RgaBg.png 
  12250   Wed Jul 6 10:58:07 2016 SteveUpdateVACvent 78 valve configurationVacuum Status: Chamber Open

All chamber annuloses are vented. 
Vac Monitor screen is not communicating with
 CamberOpen.png 
  12238   Fri Jul 1 15:48:10 2016 SteveUpdateVACvent 78 at 710 TorrI just disconnected the 6th instrument
grade air cylinder from the vacuum envelope
at 720 Torr. Now it will reach equilibrium
 pd78at710T.png 
  12559   Thu Oct 13 16:48:34 2016 SteveUpdateVACvent 79 is completedIFO is at atmosphere. The MC can be locked
in air now.

The doors will be coming off tomorrow
 vent_79.png 
  12557   Thu Oct 13 09:30:38 2016 SteveUpdateGeneralvent 79 is happening


 vent79precond.pngventing.png 
  10536   Thu Sep 25 08:21:15 2014 SteveUpdateVACvent day 1

    

       
            
 ventDay1.png 
  10542   Fri Sep 26 09:13:17 2014 SteveUpdateSUSvent day 2 ITMY in vac table needs leveling.  ventDay2.pngITMY.png 
  7594   Tue Oct 23 08:45:00 2012 SteveUpdateVACvent day 3

    

       
            
 ventd4.pngIMG_1743.JPG 
  10547   Mon Sep 29 09:11:25 2014 SteveUpdateVACvent day 5 RGA scan 
 
 v77_bg-mag-d5.png 
  2635   Tue Feb 23 19:00:45 2010 kiwamuConfigurationVACvent finishedThe vent has been
finished.
  
  3259   Wed Jul 21 12:41:31 2010 kiwamuUpdateVACvent finishedThe vent
has been finished successfully in this morning.
  
  3266   Thu Jul 22 08:07:27 2010 steveUpdateVACvent finished

    
        
 30hvent.jpg 
  6889   Thu Jun 28 20:59:28 2012 yutaBureaucracyLockingvent for PRC check, TOMORROW!Koji, Jamie and I talked together and I decided to VENT TOMORROW   
  6890   Thu Jun 28 22:08:57 2012 JenneBureaucracyLockingvent for PRC check, TOMORROW!

    

       
            
  
  6891   Fri Jun 29 01:49:36 2012 yutaBureaucracyLockingvent for PRC check, TOMORROW!

    

       
            
  
  7849   Tue Dec 18 10:43:20 2012 SteveUpdateVACvent has completed The 40m vacuum envelope is at atm   
It took 4.5 hours at ~3 Torr/min speed. Atm1
 
 vent74.pngbvent.pngbefVent.png 
  7582   Fri Oct 19 16:45:39 2012 SteveUpdateVACvent has started

    

       
            
  
  7584   Fri Oct 19 19:26:42 2012 JenneUpdateVACvent has started

    

       
            
  
  5111   Wed Aug 3 16:18:30 2011 steveUpdateVACvent is almost finishedP1 at 750 Torr,  Vent valve VV1 is
left open to atm. It will reach equilibrium
in an hour. The PSL power is not turned down
 vent8h.jpg 
  2636   Tue Feb 23 19:07:43 2010 kiwamu and steveConfigurationVACvent is completed

    
        
 vent2010feb23.jpg 
  10532   Wed Sep 24 13:28:48 2014 SteveUpdateVACvent is completed The vent is completed. ITMX was kicked
up accidentally. Valve configuration: chamber
open, RGA is pumped through VM2  Maglev
 ventiscompleted.pngatAtm.png 
  10533   Wed Sep 24 16:02:58 2014 JenneUpdateVACvent is completed[Steve, EricQ, Jenne]
ITMY and BS heavy doors are off,
light doors are on.  Q is aligning the
  
  5698   Wed Oct 19 14:03:41 2011 kiwamuUpdateGeneralvent prep : dichroic mirrorsStatus update on dichroic mirror:
 I got the specification sheet
of an aLIGO 2" dichroic mirror from
  
  7249   Wed Aug 22 15:47:34 2012 jamieSummaryGeneralvent prepartion for fast-track ventWe are discussing venting first thing next
week, with the goal of
diagnosing what's going on in the
  
  7255   Thu Aug 23 10:38:12 2012 SteveUpdateGeneralvent prepartion for fast-track vent

    

       
            
  
  7558   Tue Oct 16 16:46:20 2012 Vent Czar and CzarinaSummaryGeneralvent stuffWe're discussing the plan for the next
vent.  Now that we have all the tip-tilt
stuff in hand, we should get ready for the
  
  7560   Tue Oct 16 17:13:23 2012 CzarinaSummaryGeneralvent stuff - 4 pathsI see 4+
possible paths for us to take, in terms of
a possible vent in the next few weeks:
  
  66   Tue Nov 6 09:45:22 2007 steveSummarySUSvent sus trend The mc optics dragwippings were done by locking
optics by eq stops and rotating-moving
cages so access were good. This technic worked
 ventsustrend.jpg 
  2631   Tue Feb 23 13:37:04 2010 kiwamu and steveConfigurationVACventing the 40m vac envelopeKiwamu and Steve have started venting
the 40m vacuum envelope.
Preparation:
  
  3616   Tue Sep 28 14:12:14 2010 steveUpdateGeneralvertex crane drive is out of orderThe vertex crane drive is overheating,
it stopped functioning. Service man will
be here tomorrow morning.
  
  9146   Fri Sep 20 16:37:30 2013 SteveUpdateVACvertex crane folding arm is back on

    

       
            
 bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg 
  9139   Wed Sep 18 14:57:12 2013 SteveUpdateVACvertex crane folding arm removed The folding beam removed as shown.
Two man supporting it while I hammering it
out. Pin was dry and it gulled into supporting
 manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg 
  9111   Thu Sep 5 10:47:58 2013 SteveUpdateVACvertex crane folding issue 
 [Fred Goldbar, Mike Gerfen,
Dennis Coyne and Steve]
 5mmLess.jpg 