Wed Dec 14 14:40:53 2011, steve, Update, Green Locking, delay line bnc cable specs 
|
Tue Dec 20 15:49:21 2011, steve, Update, PEM, optical table top
|
Wed Jan 4 09:06:50 2012, steve, Update, Computers, possible front-end timing issue
|
Thu Jan 5 09:08:48 2012, steve, Update, General, framebuilder is back
|
Mon Jan 9 08:47:35 2012, steve, Update, SUS, ETMX damping restored
|
Tue Jan 10 09:17:23 2012, steve, Update, Photos, strawman's visiters 
|
Thu Jan 12 07:44:21 2012, steve, Update, SUS, sapphire wire standoff quote
|
Thu Jan 12 10:11:59 2012, steve, Update, PEM, optical table top with 1" wall
|
Wed Jan 18 12:38:44 2012, steve, Update, PEM, Acrylic plexiglass transmittance 
|
Wed Jan 25 17:32:03 2012, steve, Update, Green Locking, geen pointing into y arm is misaligned
|
Thu Jan 26 08:36:38 2012, steve, Update, SAFETY, evacuation drill
|
Thu Jan 26 10:17:01 2012, steve, Update, Green Locking, geen pointing into y arm is realigned
|
Fri Jan 27 09:05:41 2012, steve, Update, SUS, OSEM locking plunger
|
Mon Jan 30 08:17:06 2012, steve, Update, IOO, PMC
|
Mon Jan 30 16:18:51 2012, steve, Update, PEM, Roscolux colored film transmittance at 1064 nm
|
Tue Jan 31 08:44:10 2012, steve, Update, IOO, laser shuts down
|
Tue Jan 31 17:13:49 2012, steve, Update, IOO, only the PSL laser is off
|
Wed Feb 1 17:00:57 2012, steve, Update, IOO, laser is back ON  
|
Fri Feb 3 14:47:51 2012, steve, Update, PEM, laser interlock drawing
|
Fri Feb 3 16:13:49 2012, steve, Update, PEM, LED lights for chamber illumination
|
Fri Feb 3 17:31:09 2012, steve, Update, General, green welding glass
|
Mon Feb 6 11:07:21 2012, steve, Update, SUS, Oplev QPD Sum Trends are suspicious
|
Mon Feb 6 17:06:11 2012, steve, Update, SUS, oplev transferfunction of PIT: ETMY & ETMX 
|
Tue Feb 7 16:30:46 2012, steve, Update, SUS, ALL oplev PIT transfer functions 7x
|
Wed Feb 8 16:37:02 2012, steve, Update, SUS, ITMX OSEM LL is sick  
|
Thu Feb 9 16:46:02 2012, steve, Update, SUS, ALL oplev YAW transfer functions 7x
|
Thu Feb 9 17:11:05 2012, steve, Update, SUS, more OSEM problems   
|
Fri Feb 10 11:01:31 2012, steve, Update, IOO, crazy ground motion
|
Fri Feb 10 11:46:44 2012, steve, Update, IOO, seismic noise back to normal  
|
Fri Feb 10 15:46:59 2012, steve, Update, SUS, ruby wire standoff
|
Fri Feb 10 15:54:27 2012, steve, Update, PEM, AC turned back ON
|
Tue Feb 14 08:22:27 2012, steve, Update, SUS, sus damping restored
|
Tue Feb 14 17:09:05 2012, steve, Update, General, reflectivity of green welding glass 
|
Wed Feb 15 11:34:01 2012, steve, Update, , under the shouth end optical table 
|
Thu Feb 16 09:59:16 2012, steve, Update, ASC, IP- ANG
|
Tue Feb 21 08:33:16 2012, steve, Update, Green Locking, periscope adapter plate
|
Thu Feb 23 09:09:33 2012, steve, Update, SAFETY, safety checks
|
Thu Feb 23 10:53:54 2012, steve, Update, SUS, oplev PIT transfer functions
|
Fri Feb 24 08:06:52 2012, steve, Update, SUS, sus restored 
|
Mon Feb 27 10:21:37 2012, steve, Update, SAFETY, safety audit tomorrow morning
|
Mon Feb 27 14:35:22 2012, steve, Update, SUS, oplev YAW transfer functions
|
Tue Feb 28 11:20:51 2012, steve, Update, SAFETY, safety audit 2012
|
Thu Mar 1 09:26:50 2012, steve, Update, SUS, SOS baffle plates are ready
|
Wed Mar 7 11:20:23 2012, steve, Update, SUS, oplev qpd offsets zeroed
|
Fri Mar 9 10:17:06 2012, steve, HowTo, PEM, do not leave tables open
|
Fri Mar 9 10:44:57 2012, steve, Update, RF System, OSA
|
Fri Mar 9 16:00:46 2012, steve, Update, Green Locking, laser emergency shut down switch replaced at the south end
|
Wed Mar 14 10:06:26 2012, steve, Update, Green Locking, dichroic mirror quotes
|
Tue Mar 20 09:59:01 2012, steve, Update, IOO, Laser tripped off
|
Tue Mar 20 16:53:48 2012, steve, Update, PEM, cranes maintenance & certified inspection of 2012
|
|