40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 341 of 344  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  17086   Wed Aug 17 10:23:05 2022 TegaUpdateGeneralc1vac issues, pressure gauge replacement- Disk full

I updated the configuration file
'/etc/logrotate.d/rsyslog' to set
  
  17087   Wed Aug 17 10:27:49 2022 CiciUpdateGeneralLocking X-arm AUX laserTL;DR: Got the x-arm aux laser locked again
and took more data - my fit on my transfer
functions need improvement and my new method
 rpi_OLG_2022_08_16_17_00_41.pdfrpi_OLG_2022_08_16_17_01_21.pdf 
  17088   Wed Aug 17 11:10:51 2022 ranaUpdateComputersc1teststand rack mounting for CDS upgradewe want to be able to run SimPlant on the
teststand, test our new controls algorithms,
test watchdogs, and any other software upgrades.
  
  17090   Thu Aug 18 16:35:29 2022 CiciUpdateGeneralUGF linked to optical gain!TL;DR: When the laser has good lock, the
OLTF moves up and the UGF moves over!

-----------------------------------------------------------
 rpi_OLG_2022_08_17_18_03_52.pdfrpi_OLG_2022_08_17_18_00_50.pdf 
  17092   Fri Aug 19 14:46:32 2022 AnchalUpdateSUSOpen loop transfer function measurements for local damping loops of BHD optics[Anchal, Tega]

As a first step to characterize
all the local damping loops, we ran an open
  
  17093   Fri Aug 19 15:20:14 2022 KojiUpdateGeneralNotice: SURF SUS test setup blocking the lab wayThe setup was (at least partially) cleared.  PXL_20220819_201318044.jpg 
  17095   Fri Aug 19 15:36:10 2022 KojiUpdateGeneralSR785 C21593 CHA+ BNC brokenWhen Juan and I were working on the suspension
measurement, I found that CHA didn't
settle down well.
 PXL_20220819_195619620.jpgPXL_20220819_195643478.jpg 
  17096   Sat Aug 20 20:26:10 2022 AnchalUpdateSUSOpen loop transfer function measurements for local damping loops of Core opticsI made measurements of old optics OLTF
today. I have reduced the file sizes of the
plots and data now. It is interesting that
 ALL_CORE_SUS_OLTF_2022-08-20-merged.pdf 
  17097   Mon Aug 22 14:36:49 2022 ranaUpdateSUSOpen loop transfer function measurements for local damping loops of Core opticsfor damping and OL loops, we typically
don't measure the TF like this because
it takes forever and we don't need that
  
  17098   Mon Aug 22 19:02:15 2022 TegaUpdateComputersc1teststand rack mounting for CDS upgrade II[Tega, JC]

Moved the rack to the location
of the test stand just behind 1X7 and plan
 IMG_20220822_185437763.jpgIMG_20220822_131340214.jpgc1bhd.jpegc1lsc.jpeg 
  17099   Tue Aug 23 14:59:15 2022 JCUpdateToolsNew Toolbox at Y-EndA new tool box has been placed at the Y-end!
Each drawer has its label so PLEASE
put the tools back in their correct location.
 9AFD3E49-0C5B-4626-889A-0A5C62590AD7.jpeg99EC2EB1-EEA0-4AD8-B6D7-A494431E91E5.jpeg 
  17100   Tue Aug 23 22:30:24 2022 TegaUpdateComputersc1teststand OS upgrade - I[JC, Tega, Chris]

After moving the test stand front-ends,
chiara (name server) and fb1 (boot server)
  
  17101   Wed Aug 24 10:49:43 2022 CiciUpdateGeneralMeasuring DFD output/X-arm laser PZT TF with MokuWe measured the TF of the X-arm laser PZT
using the Moku so we can begin fitting to
that data and hopefully creating a digital
 AUX_PZT_Actuator_nofit.pdf 
  17102   Wed Aug 24 12:02:24 2022 PacoUpdateSUSITMX SUS is sus UL glitches?[Yehonathan, Paco]

This morning, while attempting
to align the IFO to continue with noise-budgeting,
 ITMX_UL_badness_08242022.png 
  17103   Wed Aug 24 16:37:52 2022 CiciUpdateGeneralMore DFD/AUX PZT resonance measurements Some more measurements of the PZT resonances
(now zoomed in!) I'm adjusting parameters
on our model to try and fit to it by hand
 AUX_PZT_Actuator_narrow_fit.pdf 
  17105   Thu Aug 25 16:05:51 2022 YehonathanUpdateSUSTrying to fix some SUSI tried to lock the Y/X arms to take some
noise budget. However, we noticed that TRX/Y
were oscillating coherently together (
 PR2_Step_Response_Test_2022-08-25_16-23.pdfPR3_Step_Response_Test_2022-08-25_18-37.pdf 
  17106   Thu Aug 25 16:39:31 2022 CiciUpdateGeneralI have learned the absolute basics of githubI have now added code/data to my github
repository. (it's the little victories)
  
  17107   Fri Aug 26 12:46:07 2022 CiciUpdateGeneralProgress on fitting PZT resonancesHere is an update of how fitting the resonances
is going - I've been modifying parameters
by hand and seeing the effect on the fit.
 PZT_fit.zipAUX_PZT_Actuator_narrow_fit_1.pdf 
  17108   Fri Aug 26 14:05:09 2022 TegaUpdateComputersrack reshuffle proposal for CDS upgrade[Tega, Jamie]

Here is a proposal for what we
would like to do in terms of reshuffling
 6x 
  17109   Sun Aug 28 23:14:22 2022 JamieUpdateComputersrack reshuffle proposal for CDS upgrade@tega This looks great, thank you for putting
this together.  The rack drawing in
particular is great.  Two notes:
  
  17110   Mon Aug 29 13:33:09 2022 JCUpdateGeneralLab CleanupThe machine shop looked a mess this morning,
so I cleaned it up. All power tools
are now placed in the drawers in the
 EDE63209-D556-41F1-9BF2-89CD78E3D7B7.jpeg 
  17111   Mon Aug 29 15:15:46 2022 TegaUpdateComputers3 FEs from LLO got delivered today[JC, Tega]

We got the 3 front-ends from LLO
today. The contents of each box are:
 IMG_20220829_145533452.jpgIMG_20220829_144801365.jpg 
  17112   Mon Aug 29 18:25:12 2022 CiciUpdateGeneralTaking finer measurements of the actuator transfer functionTook finer measurements of the x-arm aux
laser actuator tranfer function (10 kHz -
1 MHz, 1024 pts/decade) using the Moku.
 PZT_TF_fine.pngPZT_TF_fine_mag_stdev.pngATF_fine.zip 
  17113   Tue Aug 30 15:21:27 2022 TegaUpdateComputers3 FEs from LHO got delivered today[Tega, JC]

We received the remaining 3 front-ends
from LHO today. They each have a timing card
 IMG_20220830_144925325.jpgIMG_20220830_142307495.jpgIMG_20220830_143059443.jpg 
  17114   Wed Aug 31 00:32:00 2022 KojiUpdateGeneralSOS and other stuff in the clean roomSalvage these (and any other things).
Wrap and double-pack nicely. Put the labels.
Store them and record the location. Tell
 6x 
  17115   Wed Aug 31 00:46:56 2022 KojiUpdateGeneralVertex Lab area to be cleanedAs marked up in the photos.

 

Attachment 5: The
 9x 
  17116   Wed Aug 31 01:22:01 2022 KojiUpdateGeneralAlong the X arm part 1 

Attachment 5:
RF delay line was accommodated in 1X3B. (KA)
 9x 
  17117   Wed Aug 31 01:24:48 2022 KojiUpdateGeneralAlong the X arm part 2 

 
 9x 
  17118   Wed Aug 31 01:25:37 2022 KojiUpdateGeneralAlong the X arm part 3 

 
 9x 
  17119   Wed Aug 31 01:30:53 2022 KojiUpdateGeneralAlong the X arm part 4Behind the X arm tube  PXL_20220831_020757504.jpgPXL_20220831_020825338.jpgPXL_20220831_020856676.jpgPXL_20220831_020934968.jpgPXL_20220831_021030215.jpg 
  17120   Wed Aug 31 01:53:39 2022 KojiUpdateGeneralAlong the Y arm part 1 

 
 9x 
  17121   Wed Aug 31 01:54:45 2022 KojiUpdateGeneralAlong the Y arm part 2   8x 
  17122   Wed Aug 31 11:39:48 2022 YehonathanUpdateLSCUpdated XARM noise budget{Radhika, Paco, Yehonathan}

For educational purposes we update
the XARM noise budget and add the POX11 calibrated
 Screenshot_2022-08-31_11-38-46.png 
  17125   Wed Aug 31 16:11:37 2022 KojiUpdateGeneralVertex Lab area to be cleanedThe analog electronics units piled up along
the wall was moved into 1X3B rack which was
basically empty. (Attachments 1/2/4)
 PXL_20220831_224457839.jpgPXL_20220831_224816960.jpgPXL_20220831_225408183.jpgPXL_20220901_021729652.jpg 
  17128   Fri Sep 2 15:26:42 2022 YehonathanUpdateGeneralSOS and other stuff in the clean room{Paco, Yehonathan}

BHD Optics box was put into the
x-arm last clean cabinet. (attachment 5)
 osem_sus.jpegmagnet_gluing.jpeg2-3inch_adapter_parts.jpegTTs.jpegBHD_optics.jpeg 
  17129   Fri Sep 2 15:30:10 2022 AnchalUpdateGeneralAlong the X arm part 1[Anchal, Radhika]

Attachment 2: The custom
cables which were part of the intermediate
  
  17130   Fri Sep 2 15:35:19 2022 AnchalUpdateGeneralAlong the Y arm part 2[Anchal, Radhika]

The cables in USPS open box were
important cables that are part of the new
  
  17133   Tue Sep 6 17:39:40 2022 PacoUpdateSUSLO1 LO2 AS1 AS4 damping loop step responsesI tuned the local damping gains for LO1,
LO2, AS1, and AS4 by looking at step responses
in the DOF basis (i.e. POS, PIT, YAW, and
 LO1_Step_Response_Test_2022-09-06_17-19.pdfLO2_Step_Response_Test_2022-09-06_17-30.pdfAS1_Step_Response_Test_2022-09-06_17-53.pdfAS4_Step_Response_Test_2022-09-06_18-16.pdf 
  17134   Wed Sep 7 14:32:15 2022 AnchalUpdateSUSUpdated SD coil gain to keep all coil actuation signals digitally same magnitudeThe coil driver actuation strength for
face coils was increased by 13 times in LO1,
LO2, SR2, AS1, AS4, PR2, and PR3.
  
  17137   Thu Sep 8 16:03:25 2022 YehonathanUpdateLSCRealignment, arm locking, gains adjustments{Anchal, Yehonathan}

We came this morning and the IMC
was misaligned. The IMC was realigned and
  
  17138   Tue Sep 13 14:12:03 2022 YehonathanUpdateBHDTrying LO phase locking again[Paco, Yehonathan]

Summary: 
We
 Screenshot_2022-09-13_17-41-33.png 
  17139   Wed Sep 14 15:40:51 2022 JCUpdateTreasurePlastic ContainersThere are brand new empty plastic containers
located inside the shed that is outside
in the cage. These can be used for organizing
 B0DD2BEC-E57E-4AA2-8672-2ABB41F44F84.jpeg 
  17141   Thu Sep 15 16:19:33 2022 YehonathanUpdateLSCPOX-POY noise budgetDoing POX-POY noise measurement as a poor
man's FPMI for diagnostic purposes. (Notebook
in /opt/rtcds/caltech/c1/Git/40m/measurements/LSC/POX-POY/Noise_Budget.ipynb)
 XARM_Actuation_Plot.pdfYARM_Actuation_Plot.pdfSensitivity_Plot_1347315385.pdf 
  17142   Thu Sep 15 21:12:53 2022 PacoUpdateBHDLO phase "dc" controlLocked the LO phase with a MICH offset=+91.
The LO is midfringe (locked using the A-B
zero crossing), so it's far from being
 lophase_oltf.pdflophase_noise_spectra.pdf 
  17144   Mon Sep 19 20:21:06 2022 TegaUpdateComputers1X7 and 1X6 work[Tega, Paco, JC]


We moved the GPS network time server
 IMG_20220919_204013819.jpgIMG_20220919_203541114.jpgIMG_20220919_203458952.jpg 
  17146   Tue Sep 20 15:40:07 2022 yehonathanUpdateBHDTrying doing AC lockWe resume the LO phase locking work. MICH
was locked with an offset of 80 cts. LO and
AS beams were aligned to maximize the BHD
 Screenshot_2022-09-20_15-38-44.png 
  17148   Tue Sep 20 23:06:23 2022 TegaUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone[Tega, Radhika, JC]

We wired the front-ends for power,
DAQ and martian network connections. Then
 IMG_20220921_084220465.jpgdolphin_err_init_state.pngdolphin_final_state.png 
  17149   Wed Sep 21 10:10:22 2022 YehonathanUpdateCDSC1SU2 crashed{Yehonathan, Anchal}

Came this morning to find that
all the BHD optics watchdogs tripped. Watchdogs
  
  17150   Wed Sep 21 17:01:59 2022 PacoUpdateBHDBH55 RFPD installed - part I[Radhika, Paco]

Optical path setup

We
realized the DCPD - B beam path was already
 IMG_3760.jpegIMG_3764.jpeg 
  17151   Wed Sep 21 17:16:14 2022 TegaUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone[Tega, JC]

We laid 4 out of 6 fiber cables
today. The remaining 2 cables are for the
  
ELOG V3.1.3-