  16822   Mon May 2 10:00:34 2022 JordanUpdateVACTP3 Forepump tip seal replacement[JC, Jordan]

Jordan recieved the new tip seal
Friday afternoon and I continued the replacement
  
  16823   Mon May 2 13:30:52 2022 JCUpdateCoil DriversCoil Drivers UpdateThe DCC has been updated, along with the
modified schematic. Links have been attached.

  
  16824   Mon May 2 17:51:30 2022 AnchalUpdateBHDPOX Beam aligned on RFPD, YARM locked[Paco, Anchal]

We found that one of the Y1-1037-45P
marked mirror that we used was actually curved.
  
  16825   Tue May 3 13:18:47 2022 JCUpdateVACRGA Pump DownJordan, Tega, JC

Issue has been resolved. Breaker
on RP1 was tripped so the RP1 button was
  
  16827   Tue May 3 21:05:23 2022 yutaUpdateBHDAS path alignment, removing a lot of green stuff[Tega, Yehonathan, Koji, Yuta]

We tried to align AS path this afternoon.
 7x 
  16828   Tue May 3 21:07:17 2022 YehonathanUpdateBHDBHD Readout simulationI feel like there is an instability in
my thought process on this. Before my tendency
to try to scale and generalize this problem
  
  16829   Wed May 4 13:09:42 2022 AnchalUpdateBHDIMC table balanced again, IMC is locking, YARM is locking[Paco, JC, Anchal]

We balanced the IMC table back
again to point that got us 50% of nominal
  
  16830   Wed May 4 15:08:59 2022 TegaUpdateBHDXARM alignment to get flashing[Yuta, Tega]

We aligned the BS, ITMY, and ETMY
PIT and YAW to get the flashing on X-arm
 IFO_XY_ARMS_Flashing.png 
  16831   Wed May 4 18:52:43 2022 TegaUpdateBHDPOP beam too high at POP SM4 on the ITMX chamber[Yuta, Tega]

We needed to sort out the POXDC
signal so we could work on X-arm alignment.
 snnp_pr2_pr3_itmy_aligment.png 
  16832   Thu May 5 14:46:22 2022 AnchalUpdateBHDPOP beam height lowered, POP_SM4 raised[Anchal, JC]

We first aligned the single arm
cavity resonance for both arms to get maximum
  
  16833   Thu May 5 17:05:31 2022 TegaUpdateBHDIMC & X/Y-arm alignment[Yuta, Tega]

In order to setup POP camera and
RFPD on the ITMX table, we decided to first
 IFO_aligment_Y_locking_on.png 
  16834   Thu May 5 17:50:48 2022 YehonathanUpdateBHDBHD Readout simulationI have made a Simulink diagram to use in
the MICH modeling (attachment) for the homodyne
angle detection scheme. The model will be
 BHD_controls_40m_MICH.pdf 
  16835   Fri May 6 13:48:34 2022 AnchalUpdateBHDWFS loop instability fixed[Yuta, Anchal]

We investigated why WFS loop wasn't
working. It seemed like WFS1 PIT error signal
  
  16837   Mon May 9 18:43:03 2022 AnchalUpdateBHDITMX table layout correctedAs I went to correct the ITMX Oplev mirrors,
I found that both mirrors were placed in
very different positions than the design
  
  16838   Mon May 9 18:49:05 2022 TegaUpdateBHDRelocate green TRX and TRY PDs/cams/optics from PSL table to BS table[Paco, Tega]

Started work on the relocating
the green transmission optics, cameras and
 IMG_20220509_184439943.jpgIMG_20220509_184154722.jpg 
  16839   Mon May 9 22:19:06 2022 KojiUpdateBHDBHD Platform Progress status[Don, Koji]

Don is working on finalizing the
BHD Platform design. All the components on
 Screenshot_2022-05-09_220220.pngScreenshot_2022-05-09_222405.png 
  16840   Mon May 9 23:18:44 2022 KojiUpdateBHDBHD Platform Progress statusI quickly ran the FEA model to check the
resonant freqs of the BHD platform.
The boundary conditions were:
 6x 
  16842   Tue May 10 15:46:38 2022 JCUpdateBHDRelocate green TRX and TRY components from PSL table to BS table[JC, Tega]

Tega and I cleaned up the BS OPLEV
Table and took out a couple of mirrors and
 IMG_0741.jpegIMG_0753.jpeg 
  16843   Tue May 10 16:31:14 2022 TegaUpdateBHDITMX optlev return beam steered to QPDFollowed the steps below to complete the
ITMX optlev installation. The ITMX optlev
return beam now reaches its QPD without being
  
  16844   Tue May 10 18:25:43 2022 PacoUpdateBHDGreen Transmission path[Yuta, Paco]

We installed GRX_SM1,
GRX_SM2, and finished aligning
  
  16845   Wed May 11 15:49:42 2022 JCUpdateOPLEV TablesGreen Beam OPLEV Alignment[Paco, JC]

Paco and I began aligning the Green
Beam in the BS Oplev Table. while aligning
 IMG_0770.jpeg 
  16846   Thu May 12 13:46:59 2022 JcUpdateAlignmentPOP Beam[Tega, JC]

Tega and I went in to adjust the
POP being in the ITMX Table. The beam entered
 IMG_0777.jpeg 
  16847   Thu May 12 17:20:08 2022 PacoUpdateAlignmentPOP Beam on CCD[Paco]

Got POP beam centered on camera
and nominally on the two PDs. Attachment
 PXL_20220513_002047233.jpg 
  16848   Thu May 12 19:55:01 2022 TegaUpdateBHDAS path alignment[Yuta, Tega]

We finally managed to steer the
AS beam from ITMY chamber, through BS and
 AS.JPGOMCchamber.JPG 
  16849   Thu May 12 20:11:18 2022 AnchalUpdateBHDBHDBS Output beams steered out to ITMY tableI successfully steered out the two output
beams from BHD BS to ITMY table today. This
required significant changes on the table,
 signal-2022-05-12-201844.jpeg 
  16850   Thu May 12 20:24:29 2022 yutaUpdateBHDPOX and POY investigation[Anchal, Yuta]

We checked POX and POY RF signal chains
 POY.JPG 
  16851   Fri May 13 14:26:00 2022 JCUpdateAlignmentLO2 Beam[Yehonathan, JC]

Yehonathan and I attempted to align
the LO2 beam today through the BS chamber
  
  16852   Fri May 13 18:42:13 2022 PacoUpdateAlignmentITMX and ITMY sat amp failures[Yuta, Anchal, Paco]

As described briefly by JC, there
were multiple failure modes going during
  
  16853   Sat May 14 08:36:03 2022 ChrisUpdateDAQDAQ troubleshootingI heard a rumor about a DAQ problem at
the 40m.

To investigate, I tried retrieving
  
  16854   Mon May 16 10:49:01 2022 AnchalUpdateDAQDAQ troubleshooting[Anchal, Paco, JC]

Thanks Chris for the fix. We are
able to access the testpoints now but we
  
  16855   Mon May 16 12:59:27 2022 ChrisUpdateDAQDAQ troubleshootingIt looks like the RFM problem started a
little after 2am on Saturday morning (attachment
1). It’s subsequent to what I did,
 timeseries.pngerr.png 
  16856   Mon May 16 13:22:59 2022 yutaUpdateBHDREFL and AS paths aligned at AP tableAfter Xarm and Yarm were aligned by Anchal
et al, I aligned AS and REFL path
in the AP table.
 REFLPOP.JPGPOPAS.JPG 
  16857   Mon May 16 14:46:35 2022 TommyUpdateElectronicsRFSoC MTS WorkWe followed the manual's guide for
setting up MTS to sync on external signal.
In the xrfdc package, we update the RFdc
  
  16858   Mon May 16 16:13:01 2022 YehonathanUpdateBHDInitial BHD modeling: Damped suspension modelI was finally able to set up a stable suspension
model with the help of Yuta and I'm now
ready to start doing some MICH noise
 Damped_SUS.pngETMY_SUSPOS_GOL.pdfSUS_Response.png 
  16859   Mon May 16 19:14:17 2022 AnchalUpdateBHDCamera set on AS path and BHDBS output path[Anchal, Paco, Yuta]


We aligned AS path avoiding
any clipping to the AP table where we setup
  
  16860   Tue May 17 18:43:38 2022 AnchalUpdateBHDPlaced SRM in ITMY Chamber[Anchal, Paco, Yuta]

SRM Placement


SRM
was moved from its parked location to the
  
  16861   Wed May 18 08:30:29 2022 PacoUpdateBHDSRM OpLev[Paco]

The SRM Oplev injection and detection
paths interfere heavily with the POY11. Due
  
  16862   Wed May 18 09:02:52 2022 AnchalUpdateBHDWFS1 PD centeredI centered WFS1 PD so that IMC WFS Servo
does not go out of range.

 
  
  16863   Wed May 18 17:23:15 2022 AnchalUpdateBHDPlaced PRM in BS Chamber[Anchal, Paco, Yuta, JC]

SRM Oplev setup


We
setup SRM oplev path for the aligned position
  
  16864   Thu May 19 08:51:40 2022 PacoUpdateBHDSRM OpLev[Paco, Ian]

After agreement from Yuta/Anchal,
I moved POYM1 yaw to clear the aforementioned
  
  16865   Thu May 19 18:56:08 2022 yutaUpdateBHDCurrent OSEM sensor values with all the suspensions alignedCurrent OSEM sensor values with all the
suspensions aligned are attached.
For 'BS','ITMX','ETMX','ITMY','ETMY','PRM','SRM','LO1','LO2',
 OSEMS.txt 
  16866   Thu May 19 19:05:59 2022 AnchalUpdateBHDBS Chamber all work finished, BHD path setup[Anchal, Paco, Yuta]

BS Oplev Path


The
changed position of PRM (40m/16863)
  
  16867   Fri May 20 12:42:23 2022 TegaUpdateVACDoor installation on the end stations[JC, Tega, Chub]

Today we installed the 200 lbs
doors on the end station chambers.
  
  16868   Fri May 20 20:03:48 2022 PacoUpdateBHDITMY chamber work finished - LO and AS overlapped[Paco, Anchal, Yuta]

Today, in short we:


Recovered alignment of
 Screenshot_2022-05-20_20-38-25.pngOSEMs.txt 
  16869   Mon May 23 13:16:59 2022 PacoUpdateBHDEnd of vent - checks[Paco, Yuta]

Prep for closing and pump down.


Aligned IFO to maximize
 OSEMs20220523.txtScreenshot_2022-05-23_13-24-06_IFOaligned_GTRY_still_clipping_but_less.pngPR3position.JPG 
  16870   Tue May 24 10:37:09 2022 TegaUpdateVACadded FRG channels to slow channel ini file[Vacuum gauge sensors]

Paco informed me that the FRG sensor
EPICS channels are not available on dataviewer,
  
  16871   Tue May 24 11:04:53 2022 JCUpdateVACBeginning Pumpdown[JC, Jordan, Paco, Chub]

We began with the pumpdown this
morning. We started with the annulus volume
 PUMPDOWN-2022-05-24_16-57-59.pngC1VAC_Screenshot_2022-05-24_16-59-27.png 
  16872   Tue May 24 15:21:13 2022 AnchalUpdateBHDFreeswing tests of new SOS startedI modified the script freeSwing.py
to use damping loop output switches to free
the optic instead of watchdog or coil output
  
  16873   Wed May 25 16:38:27 2022 yutaUpdateSUSSuspensions quick health check[JC, Yuta]

We did a quick health check of
suspesions after the pump down.
 Screenshot_2022-05-25_16-46-13.pngOSEMcheck.JPG 
  16876   Thu May 26 15:55:10 2022 TommyUpdateElectronicsRFSoC Power SpectrumFinished building power spectrum analyzer
for the RFSoC. There are two things that
I would like to address down the road. First
 Screen_Shot_2022-06-02_at_2.51.23_PM.png 