+
Thu Apr 21 18:18:42 2022, yehonathan, Update, BHD, POX Alignment
| +
Thu Apr 21 18:42:47 2022, Tega, Update, BHD, Part V of BHR upgrade - Align LO and AS beams to BHD BS
| +
Thu Apr 21 20:33:31 2022, Koji, Update, BHD, AS1 UR OSEM problem localized in the chamber
| +
Fri Apr 22 07:01:58 2022, Jc, Update, Coil Drivers, Adding Resistors and Reinstalling 8x
| +
Fri Apr 22 12:03:09 2022, Tega, Update, BHD, AS1 UR OSEM problem localized in the chamber
| +
Fri Apr 22 12:09:51 2022, Anchal, Update, Coil Drivers, Please update DCC pages
| +
Fri Apr 22 12:15:08 2022, Anchal, Update, BHD, Cable post installation
| +
Fri Apr 22 14:14:33 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement 
|
Sun Apr 24 13:17:08 2022, Tommy, Update, Electronics, New RFSoC2x2 Overlay
| +
Mon Apr 25 14:19:51 2022, JC, Update, General, Nitrogen Tank
| +
Mon Apr 25 14:49:02 2022, Koji, Update, General, Nitrogen Tank
| +
Mon Apr 25 16:57:57 2022, Anchal, Update, BHD, Cable post installation
| +
Mon Apr 25 17:24:06 2022, Anchal, Update, CDS, DAQ still down
|
Mon Apr 25 18:00:03 2022, Ian MacMillan, Update, , Cable supports update
|
Tue Apr 26 16:23:22 2022, Tommy, Update, Electronics, RFSoC2x2 MTS
| +
Wed Apr 27 10:05:55 2022, JC, Update, Coil Drivers, Coil Drivers Update
| +
Thu Apr 28 09:12:18 2022, Anchal, Update, BHD, Restoring arm alignment
| +
Thu Apr 28 17:45:53 2022, Anchal, Update, BHD, POX Beam issues
| +
Thu Apr 28 18:07:04 2022, Anchal, Update, BHD, Restoring arm alignment at EOD
| +
Fri Apr 29 08:34:40 2022, JC, Update, VAC, RGA Pump Down
| +
Sat Apr 30 13:29:33 2022, Paco, Update, BHD, POX Beam issues --- fixed, ASL alignment on vertex chamber
| +
Mon May 2 10:00:34 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement
| +
Mon May 2 13:30:52 2022, JC, Update, Coil Drivers, Coil Drivers Update
| +
Mon May 2 17:51:30 2022, Anchal, Update, BHD, POX Beam aligned on RFPD, YARM locked
| +
Tue May 3 13:18:47 2022, JC, Update, VAC, RGA Pump Down
| +
Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
| +
Tue May 3 21:07:17 2022, Yehonathan, Update, BHD, BHD Readout simulation
| +
Wed May 4 13:09:42 2022, Anchal, Update, BHD, IMC table balanced again, IMC is locking, YARM is locking
| +
Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing
| +
Wed May 4 18:52:43 2022, Tega, Update, BHD, POP beam too high at POP SM4 on the ITMX chamber
| +
Thu May 5 14:46:22 2022, Anchal, Update, BHD, POP beam height lowered, POP_SM4 raised
| +
Thu May 5 17:05:31 2022, Tega, Update, BHD, IMC & X/Y-arm alignment
| +
Thu May 5 17:50:48 2022, Yehonathan, Update, BHD, BHD Readout simulation
| +
Fri May 6 13:48:34 2022, Anchal, Update, BHD, WFS loop instability fixed
| +
Mon May 9 18:43:03 2022, Anchal, Update, BHD, ITMX table layout corrected
| +
Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table 
| +
Mon May 9 22:19:06 2022, Koji, Update, BHD, BHD Platform Progress status 
| +
Mon May 9 23:18:44 2022, Koji, Update, BHD, BHD Platform Progress status 6x
| +
Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table 
| +
Tue May 10 16:31:14 2022, Tega, Update, BHD, ITMX optlev return beam steered to QPD
| +
Tue May 10 18:25:43 2022, Paco, Update, BHD, Green Transmission path
|
Wed May 11 15:49:42 2022, JC, Update, OPLEV Tables, Green Beam OPLEV Alignment
| +
Thu May 12 13:46:59 2022, Jc, Update, Alignment, POP Beam
| +
Thu May 12 17:20:08 2022, Paco, Update, Alignment, POP Beam on CCD
| +
Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment 
| +
Thu May 12 20:11:18 2022, Anchal, Update, BHD, BHDBS Output beams steered out to ITMY table
| +
Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation
| +
Fri May 13 14:26:00 2022, JC, Update, Alignment, LO2 Beam
| +
Fri May 13 18:42:13 2022, Paco, Update, Alignment, ITMX and ITMY sat amp failures
| +
Sat May 14 08:36:03 2022, Chris, Update, DAQ, DAQ troubleshooting
|
|