40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 340 of 344  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Mon Sep 24 20:28:13 2012, rana, Summary, elog, restarted elog: was unresponsive 
Entry  Wed May 15 23:38:04 2013, rana, Update, elog, categories trimmed 
Entry  Wed Feb 5 18:36:56 2014, rana, Frogs, elog, MicroSoft BingBot is attacking us 
Entry  Fri Jun 6 14:56:09 2014, ericq, Update, elog, Aaaaaand we're back! 
Entry  Wed Jun 25 01:18:24 2014, Akhil, Update, elog, Weekly Update 
Entry  Wed Jun 25 14:52:22 2014, Andres Medina, Update, elog, Placing a lens between the steering mirrors and another lens between the second steering mirror and the cavity SchematicForXendGreenGoingToTheCavity.pdf
    Reply  Thu Jul 31 18:54:03 2014, Chris, Frogs, elog, MicroSoft BingBot is attacking us 
    Reply  Thu Jul 31 21:21:49 2014, Koji, Frogs, elog, MicroSoft BingBot is attacking us 
Entry  Mon Dec 22 13:34:34 2014, Koji, Update, elog, Strange ELOG serach 
    Reply  Mon Dec 22 16:21:15 2014, ericq, Update, elog, Strange ELOG search 
    Reply  Tue Dec 23 16:49:32 2014, ericq, Update, elog, Strange ELOG search 
Entry  Wed Feb 11 16:49:41 2015, rana, Update, elog, ELOGD restarted 
Entry  Sun Apr 26 00:08:56 2015, rana, HowTo, elog, Troubles with putting plots in external locations 48.png
Entry  Sat Mar 26 18:28:24 2016, Koji, Update, elog, elogd flakiness 
Entry  Fri Jan 27 19:40:03 2017, rana, Metaphysics, elog, word wrapping & large images 
Entry  Tue May 22 17:29:27 2018, keerthana, Update, elog, MEDM Diagram for the auxilary laser system control and display. MEDM_aux.png
Entry  Thu Jun 7 14:35:26 2018, keerthana, Update, elog, Table- useful for doing the scanning. 
Entry  Mon Jun 11 11:45:13 2018, keerthana , Update, elog, Comparison of the analytical and finesse values of TMS and FSR. finesse1.pdf
    Reply  Mon Jun 11 18:10:51 2018, Koji , Update, elog, Comparison of the analytical and finesse values of TMS and FSR. 
    Reply  Mon Jun 11 19:16:49 2018, keerthana, Update, elog, Comparison of the analytical and finesse values of TMS and FSR. fitting_1.pdf
    Reply  Mon Jun 11 22:05:03 2018, Koji, Update, elog, Comparison of the analytical and finesse values of TMS and FSR. 
    Reply  Mon Jun 11 22:18:18 2018, keerthana, Update, elog, Comparison of the analytical and finesse values of TMS and FSR. 
Entry  Wed Jun 13 11:59:03 2018, keerthana, Update, elog, command line enabled code for frequency scanning 
Entry  Thu Jun 21 13:24:00 2018, keerthana, Update, elog, The cavity scan data of June 20 AS110_Beat.pdfYEND_Beat.pdf
Entry  Thu Jul 5 17:33:36 2018, keerthana, sandrine, Update, elog, Lights not working 
Entry  Thu Jul 5 17:58:04 2018, keerthana, sandrine, Update, elog,  setup1.jpgsetup2.jpg
Entry  Thu Jul 12 14:06:39 2018, keerthana, Update, elog, Finesse and Analytical solution - Comparison finesse_cavity.pngAnalytical1.pdfFinesse_Analytical.pdfDifference.pdf
Entry  Fri Dec 7 19:42:47 2018, rana, Frogs, elog, can't upgrade DokuWiki because of PHP / SL7 
Entry  Fri Mar 13 12:48:47 2020, Larry Wallace, Update, elog, Cert Renewal 
Entry  Fri Apr 16 11:31:00 2021, rana, Update, elog, elog stuck ~10 AM today 
    Reply  Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed  ETMYoptable.jpgsurgtubclamps.jpgquickrelease.jpgreinforcbridge.jpg
    Reply  Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYopl.jpg
    Reply  Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYoplev.jpg
    Reply  Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev 
    Reply  Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation 
Entry  Tue Jun 4 10:44:13 2013, Steve, Update, endtable upgrade, PI pzt holders are ready PIpztholders.jpg
    Reply  Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection thinwallconnector.jpg06061301.PDF
Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
    Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
    Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
Entry  Thu Jul 11 09:15:10 2013, Steve, Update, endtable upgrade, ETMY optable grounded 
    Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
    Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
    Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
    Reply  Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units 
    Reply  Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth DAC-6.4_kHz_BW_PSD.pdf
    Reply  Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches D000186_Frequency_Response.pdf
    Reply  Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration QPD-XCalib.pdfQPD-YCalib.pdfError_Function_Fitting.zip
    Reply  Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts Piezo-mirror.jpg
ELOG V3.1.3-