40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 340 of 357  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Fri Apr 1 22:22:29 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
Possibility to swap BS and ITMX tables:
BS table, which Tega said MC table, is 2ft x 4ft. The ITMX table is 3ft x 5ft and only the central 2ft x 4ft area is used. The area around the BS
table is the narrowest for the east arm. We need at least (2+delta) ft of the hallway width so that we can move the instrument. I'm not yet sure if
    Reply  Mon Apr 4 15:49:06 2022, Tega, Update, Optical Levers, Simplified sketch on BS table BS_Table.drawio.pdf
I have updated the BS table using feedback from Koji and Paco and the attached pdf document is the latest iteration.
Entry  Thu Apr 7 11:47:22 2022, Yehonathan, Update, BHD, Initial BHD modeling: AS - LO mode matching 


I begin modeling the initial BHD setup using Finesse. I started with copying C1_w_BHD.kat from the 40m/bhd
repo and making changes to reflect the current BHD setup:
    Reply  Thu Apr 7 20:33:42 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work 
To access the board remotely through the 40m lab ethernet port, use

ssh -N -L localhost:1137:localhost:9090 xilinx@<ip_address>

Then in the browser go to
Entry  Thu Apr 7 20:37:06 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Simple Tone Generator 
In the "Tommy" sub folder, I created a new notebook called "SimpleToneGenerator". This tunes the DAC and ADC mixers to a single frequency
and reads off the Time Series and Fourier components. We can alos easily check the demodulation scheme and implement butterworth filters to check their
function.
Entry  Thu Apr 7 20:41:15 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Gain Plotter Screen_Shot_2022-04-07_at_8.40.23_PM.pngUnknown-3.pngUnknown-4.png
In this file (under Tommy), we have a notebook which runs through a spectrum of frequencies and determines the gain response of the attached filter.
Below we have the output of a high pass filter. We use IQ demodulation to change IQ componets to DC. Then using a butterworth filter, we read out the DC
components and determine the gain's magnitude and phase. However, the phase seems very noisy. This is because the oscillators in the different tiles
    Reply  Thu Apr 7 21:15:04 2022, Yehonathan, Update, BHD, Initial BHD modeling: AS - LO mode matching 
Ok, it turns out these optics were purchased on purpose, as this elog shows. Jon considered
building a mode-matching telescope with stock optics as an initial step before purchasing the custom optics (referred to as "design" optics in
my elog).
    Reply  Fri Apr 8 16:03:58 2022, rana, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
Seems like it should be possible to just remove the transformer (aka as a BALUN ... BALanced, UNbalanced), or replace it with a lower frequency part.
Its just a usual mini-circuits part. Maybe you can ask Chris Stoughton about this and ask Tommy to checkout some of the RFSoC user forums for how to go
to DC.
Entry  Mon Apr 11 11:00:30 2022, Jancarlo, Update, VAC, C1VAC Reboot and Nitrogen tanks 
[Paco, JC, Ian, Jordan, Chub]

Checking in the morning, I walked over to the Nitrogen tanks to check the levels. Noticed one tank was empty, so I swapped it out. Chub came
over to check the levels and to take note of how many tanks were left available for usage (None). Chub continued to put in a work order for a set of full
Entry  Tue Apr 12 09:05:21 2022, Jordan, Update, VAC, New Pressure Gauge Install/Pump Spool Vent 6x
Today, Tega and I would like to vent the pump spool an dinstall the new FRG-400 Agilent Pressure Gauges (per elog 15703). The attached picture shows
the volume needed to be vented highlighted in red, and the gauges that need to be replaced/removed (purple dot next to the name).

The vent plan is as follows:
    Reply  Wed Apr 13 12:50:07 2022, Tega, Update, VAC, New Pressure Gauge Install/Pump Spool Vent VAC_FRG_UPGRADE.png
[Jordan, JC, Tega]

We have installed all the FRGs and updated the VAC medm screens to display their sensor readings. The replacement map is CC# -> FRG#, where
# in [1..4] and PRP1 -> FRG5. We now need to clean up the C1VAC python code so that it is not overloaded with non-function gauges (CC1,CC2,CC3,CC4,PRP1).
Entry  Wed Apr 13 15:57:25 2022, Ian MacMillan, Update, Cameras, Camera Battery Test 
Tested the Nikon batteries for the camera. they are supposed to be 7V batteries but they don't hold a charge. I confirmed this with multi-meter after
charging for days. Ordered new ones Nikon EN-EL9
Entry  Wed Apr 13 16:23:54 2022, Ian MacMillan, Update, General, Smell in 40m 
[Ian, Paco, JC]

There is a strange smell in the 40m. It smells like a chemically burning smell maybe like a shorted component. I went around with the IR
camera to see if anything was unusually hot but I didn't see anything. The smell seems to be concentrated at the vertex and down the y-arm
    Reply  Wed Apr 13 18:55:54 2022, Koji, Update, Cameras, Camera Battery Test 
I believe that the Nikon has an exposure problem and that's why we bought the Canon.

 
Entry  Thu Apr 14 09:04:30 2022, Jordan, Update, VAC, RGA Volume RGA Scans 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG
Prior to venting the RGA volume on Tuesday (4/12/2022) I took an RGA scan of the volume to be vented (RGA+TP1 volume+Manual Gate Valve) to see if there
was a difference after replacing the manual gate valve. Attached is the plot from 4/12/22, and an overlay plot to complare 4/12/22 to 12/10/2021, when
the same volume was scanned with the old (defective) manual gate valve.
Entry  Fri Apr 15 11:59:16 2022, Yehonathan, Update, IOO, IMC completely misaligned 
Came this morning, opened the PSL and there was not even a beam on the MC REFL.

Looking at the big monitor it seems like the WFS signals went through the roof during the "auto-alignment" night session.

I restored the MC alignment from before the misalignment happen and wait for the SUS to damp. Once the RMS values went below 200 I enabled the
Entry  Mon Apr 18 15:17:31 2022, Jancarlo, Update, General, Tool box and Work Station Organization 
I cleaned up around the 40 m lab. All the Laser Safety Glasses have been picked up and placed on the rack at the entrance.

Some miscellaneous BNC Connector cables have been arranged and organized along the wall parallel to the Y-Tunnel.

Nitrogen tanks have been swapped out. Current tank is at 1200 psi and the other is at 1850 psi.
Entry  Mon Apr 18 16:09:07 2022, Yehonathan, Update, BHD, BHD Readout simulation BHD_Simulink_Sketch.drawio.pdf
I'm planning on simulating the BHD readout noise in a manner very similar to the ALS noise model using Simulink. I've made a sketch of the model
for the longitudinal DOFs (attached). A model for ASC will be similar but with more measurement devices (OpLevs, QPDs, WFSs).

I'm not pretending to simulate everything in this diagram on the first go, it is just a sketch of the big picture.
    Reply  Mon Apr 18 23:22:39 2022, Koji, Update, General, Tool box and Work Station Organization PXL_20220419_062101907.jpg
Whoa! Thanks!
Entry  Tue Apr 19 18:10:10 2022, Paco, Update, BHD, Part V of BHR upgrade - POX11 path, LO path, and ITMX Oplev DJI_0167.JPGDJI_0169.JPGDJI_0168.JPG
[Yuta, Paco]

We set up POX11 beam path from ITMX chamber to the ITMX in-air table. To do this, we first identified the POX reflection on the ITMX chamber,
and then steered the POXM1 (in the BSC) by hand until we cleared the viewport. We also checked that the POX beam is centered on POXM1.
    Reply  Wed Apr 20 08:20:22 2022, Paco, Update, BHD, Part V of BHR upgrade - PR2 weirdness 
Yesterday, I tried tuning the PR2 damping gains by increasing the gain until the damping gave the ~5 oscillations (by watching the damped motion using
StripTool, and keeping an eye on the PD var). I noticed that often when I changed the gain, some OSEM sensors shifted (gained an offset!!) and the PD var
values changed, typically increasing at higher damping gains. I reverted the changes until the PD var looked "normal" again (~ 2 mV) but it is
    Reply  Wed Apr 20 14:56:06 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
Here are a few options for replacement BALUNs from Mini Circuits and specs:

Current. TCM1-83X+, 10-8000 MHz, 50 Ohms, Impedance Ratio 1, Configuration K

1. Z7550-..., DC-2500 MHz (some DC-2300), 50/75 Ohms, Impedance Ratio 1.5, Configuration Q. There are various types of the Z7550 which have different
Entry  Wed Apr 20 16:11:08 2022, Koji, Update, SUS, Outpur resistors updated for LO1 coil drivers / for SR2, LO2, AS1, and AS4 in progress 6x
[JC Koji]

To give more alignment ranges for the SUS alignment, we started updating the output resistors of the BHD SUS coil drivers.
As Paco has already started working on LO1 alignment, we urgently updated the output Rs for LO1 coil drivers.
    Reply  Wed Apr 20 18:50:03 2022, Koji, Update, BHD, Part V of BHR upgrade - PR2 weirdness Screenshot_2022-04-20_18-46-11.png
It seemed that it comes from the servo oscillation. This does not happen when the output limitters were set to be 100-ish. But even so the gains looked
quite low.

I turned on the Cheby rool-offs for all the DOFs, and this allowed me to increase the damping gain A LOT.
Entry  Thu Apr 21 10:35:23 2022, Koji, Update, CDS, DAQ seemed down 
Yesterday, when I worked on the damping servo, I found that any of the daqvtools (ndscope, dtt, dataviewer,...) is not available.  We may need to
restart the fb and rt machines.
Entry  Thu Apr 21 11:31:35 2022, JC, Update, VAC, Gauges P3/P4 IMG_0560.jpegIMG_0561.jpeg
[Jordan, JC]

It was brought to attention during yesterday's meeting that the pressures in the vacuum system were not equivalent althought the valve were
open. So this morning, Jordan and I reviewed the pressure gauges P3 and P4. We attempted to recalibrate, but the gauges were unresponsive. Following this,
    Reply  Thu Apr 21 15:22:44 2022, Koji, Update, SUS, Outpur resistors updates for SR2, LO2, AS1, and AS4 done 
[JC Koji]

Quick report: JC has done all the mods for the coil driver circuit in the morning and we worked on the reinstallation of them in the afternoon.
I'll check the damping loops / sus servo settings. JC is going to make an ELOG entry and DCC updates for more precise record of the mods.
    Reply  Thu Apr 21 16:36:56 2022, Tega, Update, VAC, cleanup work for vacuum git repo 
git repo - https://git.ligo.org/40m/vac

Finally incorporated the FRGs into the main modbusIOC service and everything seems to be working fine. I have also removed the old sensors (CC1,CC2,CC3,CC4,PTP1,IG1)
from the serial client list and their corresponding EPICS channels. Furthermore, the interlock service python script has been updated so that all occurrence
    Reply  Thu Apr 21 16:49:01 2022, Paco, Update, BHD, Part V of BHR upgrade - BS Oplev + LO1 offset 
[Paco, JC, Yuta]

We aligned the BS oplev using the new BSOL mirror pair. The main change is now the AOI of the oplev on the BS is quite normal. The output beam
in the in-air table was quite large (diverging?) so we had to place a short FL lens in front of the QPD.
Entry  Thu Apr 21 18:18:42 2022, yehonathan, Update, BHD, POX Alignment POX11_alignment.png
{Yehonathan, Paco}

BS, ITMX and ETMX were aligned to get flashing in the X arm.

I aligned the POX beam on the ITMX table using a mixture of the old POP and POX optics. The beam was stirred to the POX11 RFPD. We measure the
    Reply  Thu Apr 21 18:42:47 2022, Tega, Update, BHD, Part V of BHR upgrade - Align LO and AS beams to BHD BS 
[Tega, Yuta, Paco]

We tried aligning the LO and AS beams on to the BHD beamsplitter. During the alignment process, we noticed that the damping loop for AS1 was
not working. Paco drew our attention to the fact that the UR OSEM signal was alway close to zero, so we checked to ensure that the magnet was still within
    Reply  Thu Apr 21 20:33:31 2022, Koji, Update, BHD, AS1 UR OSEM problem localized in the chamber Screenshot_from_2022-04-21_20-13-13.png
Tega and Paco reported that the UR OSEM of AS1 lost the response.

- I have checked the LED MON (left) of the satellite amp for AS1. CH1/2/3 had 5V -> This indicates that the OSEM LEDs are (most likely) functioning.
- Then I went to the ITMY flange and connected the OSEM emulator instead of the Dsub25 cable. The attachment shows that the UR OSEM LED/PD worked
Entry  Fri Apr 22 07:01:58 2022, Jc, Update, Coil Drivers, Adding Resistors and Reinstalling 8x
[Koji, JC]

Coil Drivers LO2, SR2, AS4, and AS1 have been updated a reinstalled into the system. 

LO2 Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        Unit: S2100008
    Reply  Fri Apr 22 12:03:09 2022, Tega, Update, BHD, AS1 UR OSEM problem localized in the chamber 
[JC, Tega, Ian, Paco]

We found that the UR cable was clamped to the table by one of the ITMY OPLEV steering mirror mounts that was recently installed. After freeing
the cable, the UR signal is now active again.
    Reply  Fri Apr 22 12:09:51 2022, Anchal, Update, Coil Drivers, Please update DCC pages 
Nice. Please put this information on the DCC pages of the coil driver units. You'll find links to all the units in this document tree LIGO-E2100447.
For each page, click on "Change Metadata" from the left panel and add the change made to the resistor (including the resistor name on PCB, previous
and new value), and add a link to your previous elog post which has more details like photos, to "Notes and Changes", and upload an updated version
    Reply  Fri Apr 22 12:15:08 2022, Anchal, Update, BHD, Cable post installation 
If someone gets time, let's put in all the cable posts and clean up our cable routing on the tables.

 
Entry  Fri Apr 22 14:14:33 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement IMG_0572.jpegIMG_0573.jpeg
Jordan, JC

While the pumpspool is vented, I thought it would be a convenient time to change out the tip seal on the TP3 forepump. This one had not been
changed since 2018, so as preventative maintence I had JC remove the pump and begin cleaning/installing the new tip seal.
Entry  Sun Apr 24 13:17:08 2022, Tommy, Update, Electronics, New RFSoC2x2 Overlay 
We recieved an overlay from Chris Stoughton which he used for a ZCU11 board. The overlay is supposed to be compatible with the RFSoC 2x2 and help enable
the Multi-Tile Synchronization (MTS) we need. He also provides a .py with the necessary low level connection to the board and its memory along with a few
sample notebooks.
Entry  Mon Apr 25 14:19:51 2022, JC, Update, General, Nitrogen Tank 
Coming in this morning, I checked on the Nitrogen tanks to check the level. One of the tanks were empty, so I went ahead and swapped it out. One tank
is at 946 PSI, the other is at 2573 PSI. I checked for leaks and found none.
    Reply  Mon Apr 25 14:49:02 2022, Koji, Update, General, Nitrogen Tank 
For your (and mine) info:

N2 pressure can be monitored on the 40m summary page: https://nodus.ligo.caltech.edu:30889/detcharsummary/day/20220425/vacuum/
(you need to hit "today" to go to the current status)
    Reply  Mon Apr 25 16:57:57 2022, Anchal, Update, BHD, Cable post installation 
[Anchal, Tega, JC]

We installed cable posts in ITMY, BS, and ITMX chambers for all the new suspensions. Now, there is no point where the OSEM connections are hanging
freely.
    Reply  Mon Apr 25 17:24:06 2022, Anchal, Update, CDS, DAQ still down 
I investigated this issue today. At first, it seemed that only new suspension testpoints are inaccessible. I was able to use diaggui for a measurement
on MC2. The DAQ network cable between 1X4 and 1Y1 was tied and is very taught now (we should relieve this as soon as possible, best solution is to lay
down a longer cable over the bridge). My hypothesis is that the DAQ network might have broken while tying this cable and it probably did not come back
Entry  Mon Apr 25 18:00:03 2022, Ian MacMillan, Update, , Cable supports update Chamber_Leg_Ribbon_Cable_Attachments.pdf
I have designed new cable supports for the new ribbon cables running up the side of the tables in the vacuum chambers. This is a ribbon cable
version of the existing cable clamp cf D010120

The clamps that I have designed (shown in basic sketch attachment 1) will secure the cable at each of the currently used cable supports. 
Entry  Tue Apr 26 16:23:22 2022, Tommy, Update, Electronics, RFSoC2x2 MTS 
We connected a 8 MHz signal generator to the device in order to sync up the ADCs and DACs and hopefully get phase data. 

Some things to note:


RF Manual (143)- Need to use XRFDC SYSREF for update event
RF Manual (171)- Synchronization steps require us to first enable
Entry  Wed Apr 27 10:05:55 2022, JC, Update, Coil Drivers, Coil Drivers Update 
18 (9 pairs) Coil Drivers have been modified. Namely ETMX/ITMX/ITMY/BS/PRM/SRM/MC1/MC2/MC3.

 

ETMX Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        S2100624
    Reply  Thu Apr 28 09:12:18 2022, Anchal, Update, BHD, Restoring arm alignment 
This would be a daily first task in the morning. We'll need to check the status of arm alignment and optimize it back to maximum every morning for
the rest of the day's work.

Today, when I came, on openin gthe PSL shutter, IMC was aligned good, both arms were flashing but YARM maximum transmission count was around
    Reply  Thu Apr 28 17:45:53 2022, Anchal, Update, BHD, POX Beam issues PXL_20220429_002703686.jpg
[Anchal, Paco]

We investigated the low power issue with POX11 photodiode.


We used a power meter to confirm that above 12 uW of power is reaching the ITMX oplev table.
But the power reaching the photodiode
    Reply  Thu Apr 28 18:07:04 2022, Anchal, Update, BHD, Restoring arm alignment at EOD 
Restored arm algiment to get 0.8 max flashing on YARM and 1 max flashing on XARM. I had to move input alignment using TT2-PR3 pair and realign YARM cavity
axis using ITMY-ETMY pair.

I would like to advertise this useful tool that I've been
Entry  Fri Apr 29 08:34:40 2022, JC, Update, VAC, RGA Pump Down Screen_Shot_2022-04-29_at_8.46.53_AM.png
Jordan and I, in order to start pumpig down the RGA Volume, we began by opening V7 and VM. Afterwards, we started RP1 and RP3. After this, the pressure
in the line between RP1, RP3, and V6 dropped to 3.4 mTorr. Next, we tried to open V6, although an error message popped up. We haven't been able
to erase it since. But we were able to turn on TP2 with V4 closed. The pressure in that line is reporting 1.4 mTorr.
    Reply  Sat Apr 30 13:29:33 2022, Paco, Update, BHD, POX Beam issues --- fixed, ASL alignment on vertex chamber 
[Paco, Anchal, Yuta]

We opened the BSC and ITMX chamber in the morning (Friday) to investigate POX11 beam clipping. We immediately found that the POX11 beam was clipping
by the recently installed cable posts, so luckily no major realingment had to be done after reinstalling the cable post in a better location.
ELOG V3.1.3-