40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 340 of 357  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Fri Nov 6 00:23:34 2009, Alberto, Configuration, Computers, Elog just rebooted 
The elog just crashed and I rebooted it
Entry  Fri Nov 6 17:04:01 2009, josephb, Configuration, Computers, RFM and Megatron 
I took the RFM 5565 card dropped off by Jay and installed it into megatron.  It is not very secure, as it was too tall for the slot and could not
be locked down.  I did not connect the RFM fibers at this point, so just the card is plugged in.
Unfortunately, on power up, and immediately after the splash screen I get "NMI EVENT!" and "System halted due to fatal NMI". 
Entry  Mon Nov 9 11:11:19 2009, Alberto, Configuration, LSC, MC2 Watchdogs tripped 
The MC2 watchdogs tripped. I just restored them.
I also had to relock the MZ and then the Mode Cleaner.
Entry  Mon Nov 9 13:17:07 2009, Alberto, Configuration, ABSL, NPRO on 
I turned the auxialiary NPRO for the AbsL Experiment on. Its shutter stays closed.
Entry  Tue Nov 10 17:01:33 2009, Alberto, Configuration, IOO, c1ioovme and c1iool0 rebooted  
This afternoon, while I was trying to add the StochMon channels to the frames, I rebooted the c1ioovme and c1iool0.
I had to do it twice because of a mispelling in the C1IOO.INI file that the first time prevented the computer to restart properly.
Eventually I restored the old .ini file, as it was before the changes.
Entry  Thu Nov 12 17:24:29 2009, Koji, Joe, Peter, Configuration, CDS, ETMY CDS test started 
We started the test of the new CDS system at ETMY.
The plan is as follows:
We do the ETMY test from 9:30 to 15:00 at ETMY from Nov 12~17. This disables the ETMY during this period.
Entry  Fri Nov 13 09:54:14 2009, josephb, Configuration, Computers, Megatron switched to tcsh 
I've changed megatron's controls account default shell to tcsh (like it was before).  It now sources cshrc.40m in /cvs/cds/caltech/ correctly at
login, so all the usual aliases and programs work without doing any extra work.
Entry  Mon Nov 16 15:58:02 2009, josephb, Configuration, General, Added Gige camera to AP table, added some screens 
I placed a GC750 gige camera looking at a pickoff of the AS port, basically next to the analog camera, on the AP table.
I've modified the main sitemap to include a CAM button, for the digital cameras.  There's a half done screen associated with it.  At
the moment, it reports on the X and Y center of mass calculation, the exposure setting, and displays a little graph with a dot indicating the COM of mass
Entry  Mon Nov 16 17:24:28 2009, josephb, Configuration, Computers, Camera medm functionality improved 
Currently the Camera medm screen (now available from the sitemap), includes a server and client script buttons.  The server has two options. 
One which starts a server, the second which (for the moment) kills all copies of the server running on Ottavia.  The client button simply starts a
video screen with the camera image.  The slider on this screen changes the exposure level.  The snap shot button saves a jpeg image in the /cvs/cds/caltech/cam/c1asport
Entry  Tue Nov 17 11:09:43 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
I have connected ETMY sus electronics to megatron ADC/DAC.
We continue this state until 15:00 of today. (Restored 13:00)
    Reply  Tue Nov 17 13:39:37 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
0) Now the connection for the ETMY suspension was restored in a usual state. It damps well.

1) I thought it would be nice to have dataviewer and DTT working. 
    Reply  Tue Nov 17 15:23:06 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
OK. Now, Timing/ADC/DAC are working. It's almost there.
1) As a temporaly clock, I put a
function generator at the back side of the ETMY. 
Set it to the rectangular +/-4V@16384Hz. Connect it to D060064 PCIX Timing Interface Board in the IO Chasis.
    Reply  Tue Nov 17 21:10:30 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
Koji, Rana
The megatron DAC was temporaly connected to the suspension electronics for the DAC test. We went down to ETMY as we could not excite the mirror.
The DAC is putting correct voltages to the channels. However, the anti imaging filter test output does not show any signal.
    Reply  Wed Nov 18 11:27:33 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 


    
        
            Quote:
        
        
            
            Koji, Rana
    Reply  Wed Nov 18 12:33:30 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC Untitled.png
Hurraaaah!
We've got the damping of the suspension.
The Oplev loops has also worked!
The DAC channnel swapping was the last key!
    Reply  Wed Nov 18 16:24:25 2009, pete, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
/cvs/cds/caltech/target/fb/daqd -c daqdrc
This starts the FB.
Now the dataviewer and DTT work!
Entry  Thu Nov 19 11:33:15 2009, josephb, Configuration, Computers, Megatron  
I tried rebooting megatron, to see if that might help, but everything still acts the same. 
I tried using daqconfig and changed channels from deactiveated to activated.  I learned by activating them all, that the daq can't handle
that, and eventually aborts from an assert checking a buffer size being too small.  I also tried activating 2 and looking at those channels, and it
Entry  Thu Nov 19 16:04:48 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
We want the elog process to run in verbose mode so that we can see what's going. The idea is to track the events that trigger the elog crashes.
Following an entry on the Elog Help Forum, I added this line to the elog starting script start-elog-nodus:
./elogd -p 8080 -c /cvs/cds/caltech/elog/elog-2.7.5/elogd.cfg -D -v > elogd.log 2>&1
    Reply  Thu Nov 19 18:49:55 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 


    
        
            Quote:
        
        
            
            We want the elog process to run in verbose mode so that we can see what's going. The idea is to track the events that
Entry  Fri Nov 20 11:01:58 2009, josephb, alex, Configuration, Computers, Where to find RFM offsets 
Alex checked out the old rts (which he is no longer sure how to compile) from CVS to megatron, to the directory:
/home/controls/cds/rts/
In /home/controls/cds/rts/src/include you can find the various h files used.  Similarly, /fe has the c files.
Entry  Fri Nov 20 11:14:22 2009, josephb, alex, Configuration, Computers, test points working on megatron and we may have filters with switch outputs built in 
Alex tooked at the channel definitions (can be seen in tpchn_C1.par), and noticed the rmid was 0. 
However, we had set in testpoint.par the tst system to C-node1 instead of C-node0.  The final number inf that and the rmid need to be equal.
  We have changed this, and the test points appear to be working now.
Entry  Fri Nov 20 16:18:56 2009, rob, Configuration, SUS, watchdog rampdown 
I've changed the watchdog rampdown script so it brings the SUS watchdogs to 220, instead of the 150 it previously targeted.  This is to make tripping
less likely with the jackhammering going on next door.  I've also turned off all the oplev damping.
Entry  Tue Nov 24 18:24:54 2009, Sanjit, Configuration, Adaptive Filtering, ASS channels added to framebuilder 
 
[Sanjit, Jenne, Rob, Joe]
 
Entry  Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
I temporarily disconnected the Heliax cable that brings the 166MHz LO to the LSC rack.
I'm doing a couple of measurement and I'll put it back in as soon as I'm done.
Entry  Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired 
I replaced the SMA end connector for the 166 MHZ Local Oscillator signal that goes to the back of the flange in the 1Y2 rack. The connector had got damaged
after it twisted when I was tigheting the N connector of the Heliax cable on the front panel.
    Reply  Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected 


    
        
            Quote:
        
        
            
            I temporarily disconnected the Heliax cable that brings the 166MHz LO to the LSC rack.
Entry  Fri Dec 11 08:35:04 2009, steve, Configuration, VAC, pumpdown has started wiping.jpg
Oplev positions before and after drag wiped arm TMs as of yesterday. Slow-mode pumpdown has started with 3/4 turn opened  RV1 valve at 8am today.
    Reply  Fri Dec 11 09:30:09 2009, Koji, Configuration, LSC, 166 LO Disconnected 
They must not be dBm, must be dB 


    
        
            Quote:

       
        
            
            
            
    Reply  Fri Dec 11 11:42:26 2009, Alberto, Configuration, LSC, 166 LO Disconnected 


    
        
            Quote:
        
        
            
            They must not be dBm, must be dB 
            
   
    Reply  Fri Dec 11 13:18:17 2009, Alberto, Configuration, VAC, pumpdown has started 


    
        
            Quote:
        
        
            
            Oplev positions before and after drag wiped arm TMs as of yesterday. Slow-mode pumpdown has started with 3/4 turn opened 
    Reply  Fri Dec 11 14:12:32 2009, rana, Configuration, LSC, 166 LO Disconnected 
 
 Seems like very strange cable loss numbers. The Heliax is lossier than the RG-174? I wonder how these compare with the specs in the cable
catalog?
    Reply  Fri Dec 11 14:19:22 2009, Koji, Configuration, VAC, pumpdown has started 
Wait, Wait, Wait. You are
moving too fast. Go one by one. 
    Reply  Fri Dec 11 15:21:40 2009, steve, Configuration, VAC, pumpdown#67 is completed pd7h.jpgoplevpd8h.jpg


    
        
            Quote:
        
        
            
            Oplev positions before and after drag wiped arm TMs as of yesterday. Slow-mode pumpdown has started with 3/4 turn
    Reply  Fri Dec 11 19:51:13 2009, Alberto, Configuration, LSC, 166 LO Disconnected 


    
        
            Quote:
        
        
            
             
Entry  Sat Dec 19 14:33:25 2009, Koji, Configuration, Computers, PDFlib lite / gnuplot 4.2.6 on Rosalba/Allegra 
In order to enable 'set terminal pdf' in gnuplot on Rosalba/Allegra, I installed PDFlib lite and gnuplot v4.2.6. to them. 
(PDFlib lite is required to build the pdf-available version of gnuplot)

Installation of PDFlib lite:
Entry  Tue Dec 22 18:42:40 2009, Sanjit, Koji, Configuration, Adaptive Filtering, Readded DAQ channels to active list 
Sometimes back we modified /cvs/cds/caltech/chans/daq/C1ASS.ini to save some of the channels. The file was reverted to default after the recent changes
in ASS.
We again uncommented and made acquire=1 to save the following three channels using daqconfig:
Entry  Wed Dec 30 20:33:36 2009, rana, alberto, Configuration, Cameras, ITMY & MC2 Camera work DSC_1064.JPGDSC_1065.JPGDSC_1066.JPG
We restored the good state of the ITMY camera and neatened both the MC2
and ITMY camera.
The MC2 camera was driving a triple T jungle into some random cables and spoiling the image. We removed all T's and the MC2 camera now drives only
Entry  Sun Jan 3 08:23:39 2010, rana, Configuration, CDS, autoburt.pl 'fixed' for post 2009 years 
Tobin & Keith pointed out in the LLO
ilog that there was a code bug in the autoburt.pl script for autoburts.
I edited the autoburt.pl script so that it will work from now until 2099 (by which time we may no longer be using this version of perl):
Entry  Mon Jan 4 09:52:40 2010, rana, Configuration, Cameras, ITMX camera and PSL channels 
I fixed up the ITMX camera like we did for ITMY recently (removed T's and added strain relief - the lens was already
OK).
I also updated the .SCAN field for the RMTEMP and RCTEMP channels to 0.1 second. This had been done via probe
Entry  Mon Jan 4 17:21:30 2010, Jenne, Configuration, IOO, Elusive Mode Matching Solution found! Awesome_MM_Solution.png
I think I have finally found a Mode Matching solution for our new Input Mode Matching
Telescope!  And after looking at the layout diagram with Koji and Raffaele, it seems like all of the optics will fit into the chambers
/ onto the tables (not true as of last week). 
    Reply  Wed Jan 6 03:44:41 2010, Koji, Configuration, IOO, Elusive Mode Matching Solution found! 
I am in the way to get a reasonable optical layout.
Please calculate the final results with the following conditions.
"Result" = 
Entry  Fri Jan 8 20:13:49 2010, Alberto, JoB, Configuration, Computers, The 40m Kaiser Permanent Reboot Marathon pasadena_marathon.JPG
This morning after Alex and Jo's tinkering with Megatron the RFM network crashed and it brought down also some computers. The effect was that it was
not possible to lock the mode cleaner anymore.
A few computers crashed and things didn't come back to their origianl state.
After
an endless day of rebooting and fixing problems with the single front ends (in particular with c1susvme1), eventually the mode cleaner got locked again.
Among
Entry  Sun Jan 17 05:22:42 2010, rana, Configuration, Computers, ELOG script change 
With Dave Barker's help, I changed the elog startup script. Instead of running as a Daemon with the -D option,
it now runs in the background with the unix "&". I think that the stdout and stderr are now redirected to a log file called
elog.log.
Entry  Tue Jan 26 20:18:32 2010, rana, Configuration, ALARM, op540m: alarms and BLRMS and StripTool restored 
I turned the StripTool and ALARMS and BLRMS back on on op540m. Looks like it has been rebooted 5 days ago and no one turned these back on. Also, there
was a bunch of junk strewn around its keyboard which I restrained myself from throwing in the trash.
The BLRMS trends should be active now.
Entry  Thu Jan 28 09:14:51 2010, Alberto, Configuration, Computers, c1iscey, c1iscex, c1lsc, c1asc rebooted 
This morning the LSC scripts wheren't running properly. I had to reboot c1iscey, c1iscex, c1lsc, c1asc .
I burtrestored to Monday January 25 at 12:00. 
Entry  Wed Feb 3 11:13:15 2010, steve, Configuration, General, planed power outage for Sat. Feb 20 
The electrical shop has to connect the new power transformer at CES. This means we will have no AC power for ~8 hrs on Saturday, February 20
Is this date good for us to power down ALL equipment in the lab?
Rana:  Yes
Entry  Fri Feb 5 11:01:49 2010, steve, Configuration, VAC, slow pumpdown valve  slow.JPG
I have installed a slow start throttle valve in front of V3  This spring loaded valve will cut down on the flow at high pressures. There will be
no more sand storme
and static built-up during pump down.
Entry  Wed Feb 10 16:27:47 2010, steve, Configuration, General, IFO beam heights 
IN VACUUM beam heights are ALL 5.5"  This is measured from the top of the optical table to the
center of all TMs, mirrors and other optical components. This beam is ~36" above the floor.
PSL (inside of enclosure) main-output  beam: PMC, MZ, RC and ISS  are at 3" heights.
Entry  Thu Feb 11 15:53:59 2010, steve, Configuration, VAC, PSL output shutter is closed 
Joe and Alex are working on the computers. Our vacuum system is temporary "All off" condition: meaning all valves are closed, so there is no
pumping. cc1 = 1.6e-6 Torr
    Reply  Thu Feb 11 18:53:57 2010, steve, Configuration, VAC, VAC NORMAL is back 


    
        
            Quote:
        
        
            
            Joe and Alex are working on the computers. Our vacuum system is temporary "All off" condition: meaning all
ELOG V3.1.3-