+
Fri Aug 5 14:03:12 2011, steve, Update, General, malfunctioning crane at ETMY
| +
Mon Aug 8 13:24:00 2011, steve, Metaphysics, Treasure, Monday morning
| +
Mon Aug 8 14:21:03 2011, steve, Update, PEM, Particle counts controlled 
|
Mon Aug 8 15:52:39 2011, steve, Update, VAC, back ground rga scan 
|
Tue Aug 9 16:40:12 2011, steve, Update, General, clean room coat counts
|
Tue Aug 9 16:54:47 2011, steve, Update, VAC, scratch on vac door
| +
Wed Aug 10 07:59:33 2011, steve, Update, SUS, this is too dam nice
|
Thu Aug 11 08:29:28 2011, steve, Update, Computers, dataviewer at Rosalba
| +
Thu Aug 11 15:31:43 2011, steve, Update, General, malfunctioning crane at ETMY
|
Thu Aug 11 16:07:37 2011, steve, Update, SUS, ETMY rack cables strain releived 
| +
Fri Aug 12 16:52:49 2011, steve, Update, General, Chamber illuminator switch
| +
Thu Aug 18 10:59:04 2011, steve, Update, Treasure, Prepared for drag wiping
|
Thu Aug 18 15:54:35 2011, steve, Update, SUS, damped and undamped OSEMs 
|
Fri Aug 19 09:14:56 2011, steve, Update, IOO, degrading laser power at atm
|
Fri Aug 19 10:26:53 2011, steve, Update, SUS, OSEM sensor spectra
|
Fri Aug 19 15:31:53 2011, steve, Update, General, power interruption rescheduled to 10-1-2011
|
Mon Aug 22 11:40:08 2011, steve, Update, VAC, cranes checked
| +
Thu Aug 25 08:12:09 2011, steve, Update, SUS, ETMY & ITMY wiped, replaced, vac door on
|
Thu Aug 25 17:14:49 2011, steve, Update, VAC, clean room fashion changes 
| +
Fri Aug 26 07:53:59 2011, steve, Update, SUS, Broken UL magnet on ITMX
| +
Fri Aug 26 10:45:17 2011, steve, Update, General, crane at ETMY is fixed 
| +
Fri Aug 26 15:59:33 2011, steve, Update, General, drawer cabinet moves in
|
Tue Aug 30 10:49:29 2011, steve, Update, SUS, BS & PRM damping restored
| +
Wed Aug 31 11:37:56 2011, steve, Update, Green Locking, shutter in place at east end
|
Thu Sep 1 11:03:22 2011, steve, Update, VAC, back ground rga scan 
|
Thu Sep 1 15:07:45 2011, steve, Update, SUS, why ITMY is moving more ? 
|
Thu Sep 1 15:59:46 2011, steve, Update, SUS, light doors on at the ITMs
| +
Tue Sep 6 08:05:53 2011, steve, Update, SUS, ITMX must be touching
|
Wed Sep 7 08:14:01 2011, steve, Update, SUS, final OSEM check  
| +
Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started
| +
Wed Sep 7 13:28:25 2011, steve, Summary, Cameras, All Camera setups a need upgrading
| +
Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight
| +
Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted 
| +
Thu Sep 8 13:20:07 2011, steve, Update, PEM, vac envelope at atm for 36 days
| +
Tue Sep 13 16:57:44 2011, steve, Update, LSC, ITMX oplev **
| +
Wed Sep 14 07:51:20 2011, steve, Update, SUS, PRM damping restored
| +
Wed Sep 14 15:05:52 2011, steve, Update, PEM, air cond maintenance
| +
Thu Sep 15 07:28:08 2011, steve, Update, SUS, PRM damping restored
|
Fri Sep 16 16:07:28 2011, steve, Update, SAFETY, visitors safety training
|
Wed Sep 21 11:35:07 2011, steve, Update, VAC, RGA scan
| +
Fri Sep 23 16:25:01 2011, steve, Update, VAC, vac rack UPS battery replaced 
|
Mon Sep 26 11:35:44 2011, steve, Update, Cameras, arms cameras upgraded
|
Wed Sep 28 07:36:41 2011, steve, Update, SUS, ITMY damping restored
| +
Wed Sep 28 07:46:42 2011, steve, Update, SUS, Dsub connections at the back of 1X5 are fixed
|
Fri Sep 30 17:01:29 2011, steve, Update, SUS, ETMX oplev intensity effect on noise 
| +
Mon Oct 3 08:38:21 2011, steve, Summary, VAC, Recovery from the power shutdown is completed
| +
Tue Oct 4 07:51:36 2011, steve, Update, CDS, c1lsc and c1sus are still down
| +
Wed Oct 5 11:33:25 2011, steve, Update, SUS, PRM and BS oplev laser replaced
|
Wed Oct 5 17:08:49 2011, steve, Update, SUS, BS oplev spectra
| +
Fri Oct 7 14:04:48 2011, steve, Update, SUS, He/Ne intensity noise effect on oplevs 7x
|
|