40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 339 of 344  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Mon Apr 12 16:20:05 2010, Alberto, Configuration, 40m Upgrading, REFL55 improved 2010-04-12_REFL55_TF_model_to_meas_comparison.png
    Reply  Mon Apr 12 17:09:30 2010, Alberto, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent 2010-04-09_REFL11NoiseMeasurements.png
    Reply  Mon Apr 12 22:44:30 2010, Koji, Update, 40m Upgrading, REFL11 Noise Vs Photocurrent 
Entry  Wed May 5 16:32:39 2010, Alberto, Update, 40m Upgrading, New REFL55 PD, 11MHz rejection 2010-05-05_REFL55_CalibratedOpticalResponse0-60MHz.png
Entry  Thu May 6 16:18:37 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode pox11.pdf
    Reply  Thu May 6 19:57:26 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode pox11.pdf
    Reply  Fri May 7 11:21:49 2010, koji, Update, 40m Upgrading, New improved design for the 11MHz photodiode 
    Reply  Fri May 7 18:18:02 2010, Alberto, Update, 40m Upgrading, New improved design for the 11MHz photodiode 
    Reply  Fri May 7 19:02:27 2010, rana, Update, 40m Upgrading, New improved design for the 11MHz photodiode 
Entry  Mon May 10 16:59:35 2010, Alberto, Update, 40m Upgrading, Unexpected oscilaltionin the POY11 PD 2010-05-10_POY11_CalibratedOpticalResponse0-500MHz.pngPOX11.png
Entry  Wed May 12 17:10:16 2010, Alberto, Update, 40m Upgrading, RF frequency generation box - step 0 DSC_1499_small.JPG
Entry  Wed May 12 23:31:17 2010, Alberto, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed POX11.png2010-05-12_POY11_CalibratedOpticalResponse0-500MHz.png
    Reply  Thu May 13 05:06:43 2010, rana, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed 
Entry  Thu May 20 12:34:46 2010, kiwamu, Configuration, 40m Upgrading, optical breadboards with legs leg1_small.pngleg2_small.png
Entry  Fri May 21 11:56:34 2010, Alberto, Update, 40m Upgrading, 40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue. 7x
Entry  Wed May 26 17:10:09 2010, Alberto, Update, 40m Upgrading, RF Generation box Visio-frequencyGenerationBox_wiringSchematic.png
Entry  Wed May 26 22:22:03 2010, Alberto, Configuration, 40m Upgrading, Arm cavity length reflRFpowerVsArmLength_3658m.pngreflRFpowerVsArmLength_3750m.png
Entry  Thu May 27 12:52:02 2010, Alberto, Update, 40m Upgrading, Arm lengths 
Entry  Fri May 28 21:32:32 2010, Alberto, Update, 40m Upgrading, MC alignment 
Entry  Tue Jun 1 06:30:38 2010, Koji, Configuration, 40m Upgrading, effect of the arm length  arm_cavity1.pngarm_cavity2.pngarm_cavity.nb.zip
Entry  Mon Jun 21 18:01:34 2010, Jenne, Update, 40m Upgrading, SRM, PRM hung, magnets inspected 
Entry  Tue Jun 22 20:07:08 2010, Jenne, Update, 40m Upgrading, First attempt at Tip Tilt hanging 2_ECDs_small.jpgMagnetStickingOutFar_small.jpg
    Reply  Fri Jul 30 02:54:04 2010, Koji, Update, 40m Upgrading, More optics installed on the BS table 
Entry  Fri Jul 30 12:46:38 2010, Koji, Configuration, 40m Upgrading, BS chamber status BS_layout_Jul_29_2010.png
Entry  Thu Jan 27 21:10:47 2011, Osamu, Update, 40m Upgrading, Calibrated noise of green 20110127_Calibrated_grrennoise.pdf20110127_Calibrated_grrennoise.jpg20110127_TF_ETMXSUSEXC_to_PZTOUT.pdf
Entry  Wed Oct 19 12:25:58 2011, Suresh, Update, 40m Upgrading, Active Tiptilts from LLO moved to clean shelf along X arm 
Entry  Wed Oct 19 13:45:11 2011, Suresh, Update, 40m Upgrading, Active Tiptilts from LLO moved to clean shelf along X arm 
Entry  Mon Aug 6 11:07:06 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
    Reply  Wed Aug 8 20:51:56 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
    Reply  Fri Aug 17 18:49:55 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
Entry  Tue Aug 21 18:23:58 2012, Manasa, Update, 40m Upgrading, ETMX table layout 
Entry  Thu Sep 6 19:21:58 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png
    Reply  Fri Sep 7 11:58:12 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png
    Reply  Fri Sep 7 13:01:53 2012, Manasa, Configuration, 40m Upgrading, Baffle problem Picture1.png
    Reply  Thu Sep 27 19:03:06 2012, Manasa, Update, 40m Upgrading, New ETMX layout - Version 1.0 ETMX_OldNew.png
    Reply  Thu Sep 27 20:05:57 2012, Koji, Update, 40m Upgrading, New ETMX layout - Version 1.0 
    Reply  Fri Sep 28 07:49:30 2012, Steve, Update, 40m Upgrading, New ETMX layout - Version 1.0 
Entry  Tue Nov 13 11:30:54 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser ETMX_sch.png
    Reply  Tue Nov 13 16:18:51 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
    Reply  Tue Nov 13 20:13:07 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
    Reply  Mon Nov 19 20:03:53 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.pdf
    Reply  Mon Nov 19 20:17:53 2012, Jenne, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
    Reply  Mon Nov 19 22:42:14 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
    Reply  Wed Dec 12 11:04:45 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.png
Entry  Wed Dec 12 14:59:49 2012, Manasa, Configuration, 40m Upgrading, New tip-tilts layout in BSC bs.png
    Reply  Thu Jan 10 12:41:06 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : wiki page 
    Reply  Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount 
    Reply  Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY Endtable_inventory.pdf
    Reply  Tue Mar 19 19:19:50 2013, Jenne, Update, 40m Upgrading, Endtable upgrade : INVENTORY 
    Reply  Wed Mar 20 14:00:21 2013, Steve, Update, 40m Upgrading, Endtable upgrade  
ELOG V3.1.3-