  15686   Mon Nov 23 16:33:10 2020 gautamUpdateVACMore vacuum deliveries Five Agilent pressure gauges were delivered
to the 40m. It is stored with the controller
and cables in the office area. This completes
  
  15692   Wed Dec 2 12:27:49 2020 JonUpdateVACReplacing pressure gaugesNow that the new Agilent full-range gauges
(FRGs) have been received, I'm putting
together an installation plan. Since
  
  15698   Thu Dec 3 10:33:00 2020 gautamUpdateVACTrippLite UPS deliveredThe latest greatest UPS has been delivered.
I will move it to near the vacuum rack in
its packaging for storage. It weighs >100lbs
 DFDD4F39-3F8A-439D-888D-7C0CE2E030CF.jpeg 
  15703   Thu Dec 3 14:53:58 2020 JonUpdateVACReplacing pressure gaugesUpdate to the gauge replacement plan (15692),
based on Jordan's walk-through today.
  
  15721   Wed Dec 9 20:14:49 2020 gautamUpdateVACUPS failureSummary:


The (120V) UPS at the vacuum
rack is faulty.
The drypump backing
 rackBeforenAfter.pdfIMG_0008.jpgIMG_0009.jpgvacStatus.png 
  15722   Thu Dec 10 11:07:24 2020 ChubUpdateVACUPS faultIs that a fault code that you can decipher
in the manual, or just a light telling you
nothing but your UPS is dead?
  
  15723   Thu Dec 10 11:17:50 2020 ChubUpdateVACUPS faultI can't find anything in the manual
that describes the nature of the FAULT message. 
In fact, it's not mentioned at all. 
  
  15724   Thu Dec 10 13:05:52 2020 JonUpdateVACUPS failureI've investigated the vacuum controls
failure that occurred last night. Here's
what I believe happened.
 TP2_time_history.pngslow_controls_monitors.png 
  15725   Thu Dec 10 14:29:26 2020 gautamUpdateVACUPS failureI don't buy this story - P2 only briefly
burped around GPStime 1291608000 which is
around 8pm local time, which is when I was
 vacDiag1.png 
  15748   Wed Jan 6 15:28:04 2021 gautamUpdateVACVac rack UPS batteries replaced[chub, gautam]

the replacement was done this afternoon.
The red "Replace Battery" indicator
  
  16047   Mon Apr 19 09:17:51 2021 JordanUpdateVACEmpty N2 TanksWhen I came into the lab this morning,
I noticed that both N2 tanks were empty.
I had swapped one on Friday (4-16-21) before
 N2_Pressure.PNG 
  16064   Wed Apr 21 12:56:00 2021 JordanUpdateVACEmpty N2 TanksInstalled T2 today, and leaked checked
the entire line. No issues found. It could
have been a bad valve on the tank itself.
 Screenshot_2021-04-21_12-53-26.png 
  16090   Wed Apr 28 11:31:40 2021 JonUpdateVACEmpty N2 TanksI checked out what happened on c1vac. There
are actually two independent monitoring codes
running:
  
  16305   Wed Sep 1 14:16:21 2021 JordanUpdateVACEmpty N2 TanksThe right N2 tank had a bad/loose valve
and did not fully open. This morning the
left tank was just about empty and the right
  
  16316   Wed Sep 8 18:00:01 2021 KojiUpdateVACcronjobs & N2 pressure alertIn the weekly meeting, Jordan pointed out
that we didn't receive the alert for
the low N2 pressure.
  
  16404   Thu Oct 14 18:30:23 2021 KojiSummaryVACFlange/Cable Stand ConfigurationFlange Configuration for BHD

We will need total 5 new
cable stands. So Qty.6 is the number to be
 40m_flange_layout_20211014.pdf 
  16410   Mon Oct 18 10:02:17 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Anchal, Koji]

- Checked the main volume is isolated.
- TP1 and TP2 were made isolated from
 Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png 
  16412   Tue Oct 19 10:59:09 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Yehonathan, Anchal,
Koji]

North door of the BS chamber opened
  
  16413   Tue Oct 19 11:30:39 2021 KojiUpdateVACHow to vent TP1I learned that TP1 was vented through the
RGA room in the past. This can be done by
opening VM2 and a manual valve ("needle
 Screen_Shot_2021-10-18_at_14.52.34.png 
  16418   Wed Oct 20 15:58:27 2021 KojiUpdateVACHow to vent TP1Probably the hard disk of c0rga is dead.
I'll follow up in this elog later today.

Looking at the log in /opt/rtcds/caltech/c1/scripts/RGA/logs
  
  16490   Mon Dec 6 14:26:52 2021 KojiUpdateVACPumping down the RGA sectionJordan reported that the RGA section needs
to be pumped down to allow the analyzer to
run at sufficiently low pressure (P<1e-4
  
  16493   Tue Dec 7 13:12:50 2021 KojiUpdateVACPumping down the RGA sectionSo that Jordan can run the RGA scan this
afternoon, I ran TP3 and started pumping
down the RGA section.
  
  16494   Wed Dec 8 10:14:43 2021 JordanUpdateVACPumping down the RGA sectionAfter an overnight pumpdown/RGA warm up,
I took a 100 amu scan of the RGA volume and
subsequent pumping line. Attached is a screenshot
 40m_RGAVolume_12_8_21.PNG40m_RGAVolume_Torr_12_8_21.PNG 
  16501   Fri Dec 10 19:22:01 2021 KojiUpdateVACPumping down the RGA sectionThe scan result was ~x10 higher than the
previously reported scan on 2020/9/15 (https://nodus.ligo.caltech.edu:8081/40m/15570),
  
  16508   Wed Dec 15 15:06:08 2021 JordanUpdateVACVacuum Feedthru InstallJordan, Chub

We installed the 4x DB25 feedthru
flange on the North-West port of ITMX chamber
  
  16529   Tue Dec 21 16:35:39 2021 KojiUpdateVACITMX NW feedthru (LO1-1) connector pin bentI've received a report that a pin of
an ITMX NW feedthru connector was bent. (Attachment
1)
 PXL_20211222_002019620.jpgPXL_20211222_003014068.jpg 
  16634   Mon Jan 31 10:39:19 2022 JordanUpdateVACTP1 and Manual Gate Valve RemovalJordan, Chub

Today, Chub and I removed TP1 and
the failed manual gate valve off of the pumping
 20220131_100637.jpg20220131_102807.jpg20220131_102818.jpg20220131_100647.jpg 
  16643   Thu Feb 3 10:25:59 2022 JordanUpdateVACTP1 and Manual Gate Valve InstallJordan, Chub

Chub and I installed the new manual
gate valve (Nor-Cal GVM-6002-CF-K79) and
 20220203_101455.jpg20220203_094831.jpg20220203_094823.jpg 
  16682   Sat Feb 26 01:01:40 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsI will make a detailed elog later today
giving a detailed outline of the connection from
the Agilent gauge controller to the vacuum
  
  16683   Sat Feb 26 15:45:14 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsI have attached a flow diagram of my understanding
of how the gauges are connected to the network.

Earlier today, I connected the
 Vac-gauges-flow-diagram.png 
  16688   Mon Feb 28 19:15:10 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsI decided to create an independent service
for the XGS data readout so we can get this
to work first before trying to integrate
  
  16691   Tue Mar 1 20:38:49 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsDuring my investigation, I inadvertently
overwrote the serial port configuration for
the connected devices. So I am now working
 Working_Serial_Port_List_1.pngWorking_Serial_Port_List_2.pngWorking_Config_Ports#1-5.pngWorking_Config_Ports#7-8.png 
  16692   Wed Mar 2 11:50:39 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsHere is the IOLAN SDS TCP socket setting
and the USBserial setting for comparison.

I have also included the python
 XGS600_IOLAN_settings_1.pngXGS600_IOLAN_settings_2.pngXGS600_USBserial_settings.pngXGS600_comm_test.pyXGS600_comm_test_result.txt 
  16693   Wed Mar 2 12:40:08 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsConnector Test:

A quick test to rule out any issue
with the Ethernet to Serial adapter was done
 6x 
  16701   Fri Mar 4 18:12:44 2022 KojiUpdateVACRGA pumping down1. Jordan reported that the newly installed
Pirani gauge for P2 shows 850Torr while PTP2
show 680 Torr. Because of this, the vacuum
 Screenshot_2022-03-04_19-38-11.png 
  16704   Sun Mar 6 18:14:45 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsFollowing repeated failure to establish
communication between c1vac and the XGS600
controller via Perle IOLAN serial device
 iolan_xgs_comm_investigation.pdf 
  16706   Mon Mar 7 13:53:40 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsSo it appears that my deduction from
the pictures of needing a cable swap was
correct, however, it turns out that the installed
 iolan_xgs_comm_live.pdf 
  16707   Mon Mar 7 14:52:34 2022 KojiUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsGreat trouble shoot!

> I guess, the only remaining
issue now is the incorrect atmospheric
  
  16713   Tue Mar 8 12:08:47 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channelsOMG, it worked! It was indeed a calibration
issue and all I had to do was press the "OK"
button after selecting the "CAL"
 XGS600_calibration.pdf 
  16717   Wed Mar 9 10:23:28 2022 JordanUpdateVACLeak Testing of New Manual Gate Valve - Attempt #1Jordan, Chub, Paco

Chub and I went into the lab this
morning to leak check the new gate valve
  
  16721   Thu Mar 10 09:39:59 2022 JordanUpdateVACLeak Testing of New Manual Gate Valve - Attempt #2This morning Chub and I leak checked the
manual gate valve with the RGA and helium.
There was no change in the helium partial
 3-09-2022.PNG3-10-2022.PNG 
  16747   Tue Mar 29 15:07:11 2022 TegaSummaryVACOpening of MC and ETM chambers[Anchal, Chub, Ian, Paco, Tega]

Today, we opened the MC chamber,
ETMX chamber and ETMY chamber.
  
  16769   Mon Apr 11 11:00:30 2022 JancarloUpdateVACC1VAC Reboot and Nitrogen tanks[Paco, JC, Ian, Jordan, Chub]

Checking in the morning, I walked
over to the Nitrogen tanks to check the levels.
  
  16772   Tue Apr 12 09:05:21 2022 JordanUpdateVACNew Pressure Gauge Install/Pump Spool VentToday, Tega and I would like to vent the
pump spool an dinstall the new FRG-400 Agilent
Pressure Gauges (per elog 15703). The attached
 6x 
  16773   Wed Apr 13 12:50:07 2022 TegaUpdateVACNew Pressure Gauge Install/Pump Spool Vent[Jordan, JC, Tega]

We have installed all the FRGs
and updated the VAC medm screens to display
 VAC_FRG_UPGRADE.png 
  16777   Thu Apr 14 09:04:30 2022 JordanUpdateVACRGA Volume RGA ScansPrior to venting the RGA volume on Tuesday
(4/12/2022) I took an RGA scan of the volume
to be vented (RGA+TP1 volume+Manual Gate
 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG 
  16794   Thu Apr 21 11:31:35 2022 JCUpdateVACGauges P3/P4[Jordan, JC]

It was brought to attention during
yesterday's meeting that the pressures
 IMG_0560.jpegIMG_0561.jpeg 
  16796   Thu Apr 21 16:36:56 2022 TegaUpdateVACcleanup work for vacuum git repogit repo - https://git.ligo.org/40m/vac

Finally incorporated the FRGs into
the main modbusIOC service and everything
  
  16806   Fri Apr 22 14:14:33 2022 JordanUpdateVACTP3 Forepump tip seal replacementJordan, JC

While the pumpspool is vented,
I thought it would be a convenient time to
 IMG_0572.jpegIMG_0573.jpeg 
  16820   Fri Apr 29 08:34:40 2022 JCUpdateVACRGA Pump DownJordan and I, in order to start pumpig
down the RGA Volume, we began by opening
V7 and VM. Afterwards, we started RP1 and
 Screen_Shot_2022-04-29_at_8.46.53_AM.png 