ID Date Author Type Categoryup Subject Text Attachments
  8136   Fri Feb 22 11:12:16 2013 SteveUpdateVACpumpdown completed IFO   P1 pressure is 1
mTorr.  It is ready for high power light.
The Maglev took over the pumping
 mag60min.pngpd75at20h.png 
  8155   Mon Feb 25 08:22:03 2013 SteveUpdateVACpumpdown at day 4 All normal, IFO pressure 1.5e-5 Torr
RGA is pumped by TP-3 in back ground
mode.
 4d.png66d@atm.png 
  8206   Fri Mar 1 14:50:36 2013 SteveUpdateVACpumpdown day 8 Atm1, RGA background scan with TP3
pumping at day 7
Atm2,  IFO  CC1 = 1.1e-5
 bgTP3d7.pngRGAonIFO.png 
  8231   Tue Mar 5 14:59:32 2013 SteveHowToVACdry-forepump replacedTP3 turbo pump's dry-foreline pump was
replaced.
How to do it:
 changingforepump.pngTP3wFp600.jpg 
  8238   Wed Mar 6 08:40:03 2013 SteveUpdateVACfirst scan of this pumpdown Pumpdown 75 - Maglev - day 12
Precondition: 66 days at atm, installed
TIP-TILTs with coils that  replaced
 pd75m12d.pngpd75mRGA12d.png 
  8311   Tue Mar 19 17:00:14 2013 SteveUpdateVAClarge window quote of Cascade Optical quality 6.5" OD window specs
and quotes for vacuum view ports and optical
table enclosure are on the 40m wiki_ Aux
  
  8664   Mon Jun 3 09:46:40 2013 SteveUpdateVACRGA scan at day 100 Vacuum normal condition at pumdown
day 100
 
 d100Mpd75.pngd100Mpd75p.pngbadguys.png 
  8847   Mon Jul 15 14:12:15 2013 SteveUpdateVACRGA scan at day 144 Pumpdown 75, vacuum normal condition
at day 144
 
 pd75mRGA144d.pngpd75m144d.png 
  8904   Tue Jul 23 08:21:31 2013 SteveUpdateVACVent has started 
Thanks for the good preparation. 
IFO pressure P1=20 Torr 
 beforVent.pngstartVent.png 
  8907   Tue Jul 23 14:00:03 2013 SteveUpdateVACthe vent is completed The 40m IFO has reached  atmospher
in 5 hours. It is ready to open chamber condition.
The RGA is pumped with the maglev.
 Atm.png5cyl.pngventSum1d.png 
  8914   Tue Jul 23 22:55:13 2013 JenneUpdateVACBS, ITMY doors to be opened in the morningWe will open the BS and ITMY doors first
thing tomorrow morning. I plan to try to
be in around 9 am.  The first order of business
  
  8915   Wed Jul 24 10:35:41 2013 SteveUpdateVACBS, ITMY doors are removed

    

       
            
 beforeDoorsOff.pngparticlecount10d.png 
  8933   Mon Jul 29 16:04:40 2013 SteveUpdateVACAC removed Manasa, Eric, Evan, Koji and Steve,
Access connector removed in order
to complete alignment. Light aluminum with
 acout.pngAlAcACa.jpgAlAcACb.jpg 
  8934   Mon Jul 29 16:15:13 2013 KojiUpdateVACAC removedPrior to the access connector removal,
Manasa and I aligned the IFO mirrors. 
The arms were locked and aligned by
  
  8946   Wed Jul 31 10:27:00 2013 SteveUpdateVACinstrument grade air is discontinouedWe have been using Air Liquide Instrument
Grade Air for venting the 40m vacuum envelope.
It is no longer available.
  
  8963   Mon Aug 5 10:50:48 2013 SteveUpdateVACRGA background RGA background at day 12 of this
vent . The maglev is pumping on the rga through
VM2
 v75bgMd12.png 
  8970   Tue Aug 6 10:06:29 2013 SteveUpdateVACPumpdown is at 500Torr The pumpdown has started at 8:38am
Manasa was here to confirm good alignment
of the IFO
 befPd.png 
  8973   Tue Aug 6 16:45:31 2013 SteveUpdateVACPumpdown is completed IFO  P1=1mT PSL shutter is opened
 
 8hrPd76.png1mT.png 
  8976   Wed Aug 7 10:51:49 2013 SteveUpdateVACPumpdown at 26hrs Cold cathode gauge CC1 -h (horizontal)
just coming on 9.2e-5 Torr
P2 is the fore line pressure of the
 26hr.png14datm.png 
  8978   Wed Aug 7 15:36:29 2013 SteveUpdateVACTP2 drypump replaced 
 TP2's fore line - dry pump
replaced at performance level 600 mTorr after
 forelinesPs.jpg 
  8984   Thu Aug 8 07:57:23 2013 SteveUpdateVACpumpdown at 48 hrs

    

       
            
 48hrsPd76.png 
  8985   Thu Aug 8 10:31:28 2013 SteveUpdateVACfew reminders of this vent 1, Vacuum envelope grounds must be
connected all times!  After door removal
reconnect both cables immediately.
 GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg 
  9011   Wed Aug 14 08:24:20 2013 SteveUpdateVACpumpdown at day 8 
 
 pd76md8.png 
  9017   Fri Aug 16 09:35:18 2013 SteveUpdateVACVacuum Normal state recognition is back

    

       
            
 VacuumNormal.pngvacValvesDisabled.jpg 
  9029   Mon Aug 19 11:12:54 2013 SteveUpdateVACRGA scan at day 13 
 
 rgaScan13d.png 
  9084   Wed Aug 28 11:23:41 2013 SteveUpdateVACcrane repair sheduled

    

       
            
  
  9085   Wed Aug 28 15:41:42 2013 SteveUpdateVACRGA scan at day 23 Valve configuration: Vacuum Normal
pd76-m-d23
 
 pd75md23.png 
  9111   Thu Sep 5 10:47:58 2013 SteveUpdateVACvertex crane folding issue 
 [Fred Goldbar, Mike Gerfen,
Dennis Coyne and Steve]
 5mmLess.jpg 
  9115   Fri Sep 6 09:27:10 2013 SteveUpdateVAC31 days after pumpdown

    

       
            
 day31vac.png 
  9117   Mon Sep 9 15:33:06 2013 SteveUpdateVACvertex crane repair is scheduled

    

       
            
  
  9119   Tue Sep 10 09:18:22 2013 SteveUpdateVACdry pump is getting loud 
 TP3 foreline's dry pump is
getting noisier and noisier.  Turbo
  
  9120   Tue Sep 10 15:43:01 2013 SteveUpdateVACTP3' dry pump is replaced

    

       
            
  
  9129   Mon Sep 16 10:57:11 2013 SteveUpdateVACRGA scan at day 41

    

       
            
 pd76m41dRGA.pngpd76m41d.png 
  9139   Wed Sep 18 14:57:12 2013 SteveUpdateVACvertex crane folding arm removed The folding beam removed as shown.
Two man supporting it while I hammering it
out. Pin was dry and it gulled into supporting
 manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg 
  9146   Fri Sep 20 16:37:30 2013 SteveUpdateVACvertex crane folding arm is back on

    

       
            
 bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg 
  9173   Mon Sep 30 08:53:22 2013 SteveUpdateVACvertex crane repair schedule has changed

    

       
            
  
  9185   Wed Oct 2 14:25:39 2013 SteveUpdateVACvertex crane is still out of order 
The smoke alarms were turned off
and surrounding areas were covered with plastic.
 grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg 
  9223   Wed Oct 9 11:48:10 2013 SteveUpdateVACRGA scan at day 65 
 Valve configuration: Vacuum
Normal
 scanRGApd76m65d.pngpd76m65d.png 
  9359   Thu Nov 7 11:19:04 2013 SteveUpdateVACcrane work POSTPONED to Monday

    

       
            
  
  9372   Wed Nov 13 08:46:03 2013 SteveUpdateVACvertex crane repair completed

    

       
            
  
  9424   Fri Nov 22 16:32:08 2013 SteveUpdateVACRGA scan at day 108

    

       
            
 RGAscanVacNormal108d.pngday108.pngpd76m110d.png 
  9467   Fri Dec 13 16:34:20 2013 SteveUpdateVACPS will be replaced next week

    

       
            
 hotPSvacRack.jpgfan1X8.jpg 
  9506   Fri Dec 20 20:04:01 2013 SteveUpdateVACpower supply replaced with a short vent

    

       
            
 4hrPumpdown.pngpumpdownAfterHickup.pngPSpumpdown.png 
  9508   Fri Dec 20 23:00:41 2013 KojiUpdateVACpower supply replaced with a short ventI'm leaving the 40m now. IFO is aligned. Everything
look good.
  
  9510   Sat Dec 21 10:53:35 2013 SteveUpdateVACpower supply replaced with a short vent-pumpdown completedThe recovery- pumpdown reached valve configuration 
vacuum normal at 20 hours, cc1 7.7e-6 Torr
 20hrsVacNormal.png 
  9514   Thu Jan 2 10:50:24 2014 SteveUpdateVAC vacuum monitor is still blank The date is correct on this monitor.
Last stored RGA scan data Dec 20,
2013
 Help.pngvacation.png20131220lastRGAscan.png 
  9515   Thu Jan 2 13:35:06 2014 KojiUpdateVAC vacuum monitor is still blankWe probably need to restart the machine,
but I didn't want to touch c1vac1 and c1vac2. 
  
  9516   Fri Jan 3 11:18:41 2014 SteveSummaryVACpower supply replaced with a short vent

    

       
            
 rebootVENT.png 
  9550   Mon Jan 13 16:50:55 2014 SteveUpdateVACMaglev controller needs service

    

       
            
  
  9562   Tue Jan 21 17:26:59 2014 JenneSummaryVACRebooted RGA computer and reset RGA settings[Jenne, Steve]
Steve noticed that the RGA was not
logging data and that not all the correct
  