40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 339 of 349  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Typeup Category Subject Text Attachments
  16805   Fri Apr 22 12:15:08 2022 AnchalUpdateBHDCable post installationIf someone gets time, let's put in
all the cable posts and clean up our cable
routing on the tables.
  
  16806   Fri Apr 22 14:14:33 2022 JordanUpdateVACTP3 Forepump tip seal replacementJordan, JC

While the pumpspool is vented,
I thought it would be a convenient time to
 IMG_0572.jpegIMG_0573.jpeg 
  16807   Sun Apr 24 13:17:08 2022 TommyUpdateElectronicsNew RFSoC2x2 OverlayWe recieved an overlay from Chris Stoughton
which he used for a ZCU11 board. The overlay
is supposed to be compatible with the RFSoC
  
  16808   Mon Apr 25 14:19:51 2022 JCUpdateGeneralNitrogen TankComing in this morning, I checked on the
Nitrogen tanks to check the level. One of
the tanks were empty, so I went ahead and
  
  16809   Mon Apr 25 14:49:02 2022 KojiUpdateGeneralNitrogen TankFor your (and mine) info:

N2 pressure can be monitored on
the 40m summary page: https://nodus.ligo.caltech.edu:30889/detcharsummary/day/20220425/vacuum/
  
  16810   Mon Apr 25 16:57:57 2022 AnchalUpdateBHDCable post installation[Anchal, Tega, JC]

We installed cable posts in ITMY,
BS, and ITMX chambers for all the new suspensions.
  
  16811   Mon Apr 25 17:24:06 2022 AnchalUpdateCDSDAQ still downI investigated this issue today. At first,
it seemed that only new suspension testpoints
are inaccessible. I was able to use diaggui
  
  16812   Mon Apr 25 18:00:03 2022 Ian MacMillanUpdateUpgradeCable supports updateI have designed new cable supports for
the new ribbon cables running up the side
of the tables in the vacuum chambers. 
 Chamber_Leg_Ribbon_Cable_Attachments.pdf 
  16813   Tue Apr 26 16:23:22 2022 TommyUpdateElectronicsRFSoC2x2 MTSWe connected a 8 MHz signal generator to
the device in order to sync up the ADCs and
DACs and hopefully get phase data. 
  
  16814   Wed Apr 27 10:05:55 2022 JCUpdateCoil DriversCoil Drivers Update18 (9 pairs) Coil Drivers have been modified.
Namely ETMX/ITMX/ITMY/BS/PRM/SRM/MC1/MC2/MC3.

 
  
  16816   Thu Apr 28 09:12:18 2022 AnchalUpdateBHDRestoring arm alignmentThis would be a daily first task in the
morning. We'll need to check the status
of arm alignment and optimize it back to
  
  16818   Thu Apr 28 17:45:53 2022 AnchalUpdateBHDPOX Beam issues[Anchal, Paco]

We investigated the low power issue
with POX11 photodiode.
 PXL_20220429_002703686.jpg 
  16819   Thu Apr 28 18:07:04 2022 AnchalUpdateBHDRestoring arm alignment at EODRestored arm algiment to get 0.8 max flashing
on YARM and 1 max flashing on XARM. I had
to move input alignment using TT2-PR3 pair
  
  16820   Fri Apr 29 08:34:40 2022 JCUpdateVACRGA Pump DownJordan and I, in order to start pumpig
down the RGA Volume, we began by opening
V7 and VM. Afterwards, we started RP1 and
 Screen_Shot_2022-04-29_at_8.46.53_AM.png 
  16821   Sat Apr 30 13:29:33 2022 PacoUpdateBHDPOX Beam issues --- fixed, ASL alignment on vertex chamber[Paco, Anchal, Yuta]

We opened the BSC and ITMX chamber
in the morning (Friday) to investigate POX11
  
  16822   Mon May 2 10:00:34 2022 JordanUpdateVACTP3 Forepump tip seal replacement[JC, Jordan]

Jordan recieved the new tip seal
Friday afternoon and I continued the replacement
  
  16823   Mon May 2 13:30:52 2022 JCUpdateCoil DriversCoil Drivers UpdateThe DCC has been updated, along with the
modified schematic. Links have been attached.

  
  16824   Mon May 2 17:51:30 2022 AnchalUpdateBHDPOX Beam aligned on RFPD, YARM locked[Paco, Anchal]

We found that one of the Y1-1037-45P
marked mirror that we used was actually curved.
  
  16825   Tue May 3 13:18:47 2022 JCUpdateVACRGA Pump DownJordan, Tega, JC

Issue has been resolved. Breaker
on RP1 was tripped so the RP1 button was
  
  16827   Tue May 3 21:05:23 2022 yutaUpdateBHDAS path alignment, removing a lot of green stuff[Tega, Yehonathan, Koji, Yuta]

We tried to align AS path this afternoon.
 7x 
  16828   Tue May 3 21:07:17 2022 YehonathanUpdateBHDBHD Readout simulationI feel like there is an instability in
my thought process on this. Before my tendency
to try to scale and generalize this problem
  
  16829   Wed May 4 13:09:42 2022 AnchalUpdateBHDIMC table balanced again, IMC is locking, YARM is locking[Paco, JC, Anchal]

We balanced the IMC table back
again to point that got us 50% of nominal
  
  16830   Wed May 4 15:08:59 2022 TegaUpdateBHDXARM alignment to get flashing[Yuta, Tega]

We aligned the BS, ITMY, and ETMY
PIT and YAW to get the flashing on X-arm
 IFO_XY_ARMS_Flashing.png 
  16831   Wed May 4 18:52:43 2022 TegaUpdateBHDPOP beam too high at POP SM4 on the ITMX chamber[Yuta, Tega]

We needed to sort out the POXDC
signal so we could work on X-arm alignment.
 snnp_pr2_pr3_itmy_aligment.png 
  16832   Thu May 5 14:46:22 2022 AnchalUpdateBHDPOP beam height lowered, POP_SM4 raised[Anchal, JC]

We first aligned the single arm
cavity resonance for both arms to get maximum
  
  16833   Thu May 5 17:05:31 2022 TegaUpdateBHDIMC & X/Y-arm alignment[Yuta, Tega]

In order to setup POP camera and
RFPD on the ITMX table, we decided to first
 IFO_aligment_Y_locking_on.png 
  16834   Thu May 5 17:50:48 2022 YehonathanUpdateBHDBHD Readout simulationI have made a Simulink diagram to use in
the MICH modeling (attachment) for the homodyne
angle detection scheme. The model will be
 BHD_controls_40m_MICH.pdf 
  16835   Fri May 6 13:48:34 2022 AnchalUpdateBHDWFS loop instability fixed[Yuta, Anchal]

We investigated why WFS loop wasn't
working. It seemed like WFS1 PIT error signal
  
  16837   Mon May 9 18:43:03 2022 AnchalUpdateBHDITMX table layout correctedAs I went to correct the ITMX Oplev mirrors,
I found that both mirrors were placed in
very different positions than the design
  
  16838   Mon May 9 18:49:05 2022 TegaUpdateBHDRelocate green TRX and TRY PDs/cams/optics from PSL table to BS table[Paco, Tega]

Started work on the relocating
the green transmission optics, cameras and
 IMG_20220509_184439943.jpgIMG_20220509_184154722.jpg 
  16839   Mon May 9 22:19:06 2022 KojiUpdateBHDBHD Platform Progress status[Don, Koji]

Don is working on finalizing the
BHD Platform design. All the components on
 Screenshot_2022-05-09_220220.pngScreenshot_2022-05-09_222405.png 
  16840   Mon May 9 23:18:44 2022 KojiUpdateBHDBHD Platform Progress statusI quickly ran the FEA model to check the
resonant freqs of the BHD platform.
The boundary conditions were:
 6x 
  16842   Tue May 10 15:46:38 2022 JCUpdateBHDRelocate green TRX and TRY components from PSL table to BS table[JC, Tega]

Tega and I cleaned up the BS OPLEV
Table and took out a couple of mirrors and
 IMG_0741.jpegIMG_0753.jpeg 
  16843   Tue May 10 16:31:14 2022 TegaUpdateBHDITMX optlev return beam steered to QPDFollowed the steps below to complete the
ITMX optlev installation. The ITMX optlev
return beam now reaches its QPD without being
  
  16844   Tue May 10 18:25:43 2022 PacoUpdateBHDGreen Transmission path[Yuta, Paco]

We installed GRX_SM1,
GRX_SM2, and finished aligning
  
  16845   Wed May 11 15:49:42 2022 JCUpdateOPLEV TablesGreen Beam OPLEV Alignment[Paco, JC]

Paco and I began aligning the Green
Beam in the BS Oplev Table. while aligning
 IMG_0770.jpeg 
  16846   Thu May 12 13:46:59 2022 JcUpdateAlignmentPOP Beam[Tega, JC]

Tega and I went in to adjust the
POP being in the ITMX Table. The beam entered
 IMG_0777.jpeg 
  16847   Thu May 12 17:20:08 2022 PacoUpdateAlignmentPOP Beam on CCD[Paco]

Got POP beam centered on camera
and nominally on the two PDs. Attachment
 PXL_20220513_002047233.jpg 
  16848   Thu May 12 19:55:01 2022 TegaUpdateBHDAS path alignment[Yuta, Tega]

We finally managed to steer the
AS beam from ITMY chamber, through BS and
 AS.JPGOMCchamber.JPG 
  16849   Thu May 12 20:11:18 2022 AnchalUpdateBHDBHDBS Output beams steered out to ITMY tableI successfully steered out the two output
beams from BHD BS to ITMY table today. This
required significant changes on the table,
 signal-2022-05-12-201844.jpeg 
  16850   Thu May 12 20:24:29 2022 yutaUpdateBHDPOX and POY investigation[Anchal, Yuta]

We checked POX and POY RF signal chains
 POY.JPG 
  16851   Fri May 13 14:26:00 2022 JCUpdateAlignmentLO2 Beam[Yehonathan, JC]

Yehonathan and I attempted to align
the LO2 beam today through the BS chamber
  
  16852   Fri May 13 18:42:13 2022 PacoUpdateAlignmentITMX and ITMY sat amp failures[Yuta, Anchal, Paco]

As described briefly by JC, there
were multiple failure modes going during
  
  16853   Sat May 14 08:36:03 2022 ChrisUpdateDAQDAQ troubleshootingI heard a rumor about a DAQ problem at
the 40m.

To investigate, I tried retrieving
  
  16854   Mon May 16 10:49:01 2022 AnchalUpdateDAQDAQ troubleshooting[Anchal, Paco, JC]

Thanks Chris for the fix. We are
able to access the testpoints now but we
  
  16855   Mon May 16 12:59:27 2022 ChrisUpdateDAQDAQ troubleshootingIt looks like the RFM problem started a
little after 2am on Saturday morning (attachment
1). It’s subsequent to what I did,
 timeseries.pngerr.png 
  16856   Mon May 16 13:22:59 2022 yutaUpdateBHDREFL and AS paths aligned at AP tableAfter Xarm and Yarm were aligned by Anchal
et al, I aligned AS and REFL path
in the AP table.
 REFLPOP.JPGPOPAS.JPG 
  16857   Mon May 16 14:46:35 2022 TommyUpdateElectronicsRFSoC MTS WorkWe followed the manual's guide for
setting up MTS to sync on external signal.
In the xrfdc package, we update the RFdc
  
  16858   Mon May 16 16:13:01 2022 YehonathanUpdateBHDInitial BHD modeling: Damped suspension modelI was finally able to set up a stable suspension
model with the help of Yuta and I'm now
ready to start doing some MICH noise
 Damped_SUS.pngETMY_SUSPOS_GOL.pdfSUS_Response.png 
  16859   Mon May 16 19:14:17 2022 AnchalUpdateBHDCamera set on AS path and BHDBS output path[Anchal, Paco, Yuta]


We aligned AS path avoiding
any clipping to the AP table where we setup
  
ELOG V3.1.3-