Entry  Fri Jan 23 16:33:27 2009, pete, Update, oplevs, x-arm oplev calibrations 
ITMXpit 71 microrad/ct
ITMXyaw 77 microrad/ct
ETMXpit 430 microrad/ct
    Reply  Thu Jan 29 17:24:41 2009, Kakeru, Update, oplevs, arm cavity oplev calibration 
I calibrated optlevs again. My previous work has a lot of mistakes, so ignore it.

ITMX pit: 195 microrad/ct
Entry  Mon Mar 9 17:11:38 2009, Alberto, Configuration, oplevs, optical levers centering 
Yoichi, Alberto
this afternoon we centered the optical levers for all the optics.
To do that we first ran the alignment scripts for all the cavities.
    Reply  Sat Mar 14 22:53:12 2009, Kakeru, Update, oplevs, arm cavity oplev calibration oplev.pdf
I finished a calibration of optical levers.

To calibrate oplevs, I locked appropriate cavity and tilted a mirror.
    Reply  Fri Mar 20 15:37:58 2009, Kakeru, Update, oplevs, arm cavity oplev calibration 

I calibrated several oplevs with OSEM signal as a confirmation of my fitting method the method is:
    Reply  Thu Mar 26 09:08:18 2009, Kakeru, Update, oplevs, arm cavity oplev calibration 
I uploaded a document about my oplev calibration.
/cvs/cds/caltech/users/kakeru/oplev_calibration/oplev.pdf
Entry  Fri May 8 04:46:01 2009, rana, yoichi, Summary, oplevs, BS/PRM/SRM table bad! a.png
We went to center the oplevs because they were far off and found that (as usual) the numbers changed
a little after we carefully centered the oplevs and came back to the control room.
Entry  Tue May 12 17:26:56 2009, pete, Update, oplevs, etmy oplev quad was bad bad_oplev_quad.pdf
Pete, Rob
After looking at some oplev noise spectra in DTT, we discovered that the ETMY quad (serial number 115)  was noisy.  Particularly, in
the XX_OUT and XX_IN1 channels, quadrants 2 (by a bit more than an order of magnitude over the ETMX ref) and 4 (by a bit less than an order of mag). 
    Reply  Wed May 13 03:05:13 2009, pete, Update, oplevs, etmy oplev quad was bad 


    
        
            Quote:
        
        
            
            Pete, Rob
Entry  Tue Jun 2 23:55:45 2009, Alberto, Update, oplevs, oplevs centerd 
Tonight I centered the oplevs for ITMX/Y, SRM, PRM, BS.
After doing that I noticed that the BS drifted a little from where I had set it.
Entry  Tue Jun 9 11:29:07 2009, Jenne, Update, oplevs, Measured ETMY oplev beam size...put everything back 
I measured the ETMY oplev beam size at a couple different distances away from the HeNe by taking out the steering mirror and letting the light propagate
a ways.  I put the steering mirror back, aligned the oplev, and was able to relock the Yarm, so I think it's all back as it has been the last couple
of weeks.
Entry  Fri Jul 24 17:20:48 2009, Jenne, Update, oplevs, ETMY oplev is iffy 
ETMY oplev is currently a work in progress.  The HeNe beam is hitting the photodiode, but the spot size there is pretty much the size of the entire
QPD.  Thus, the ETMY oplev isn't really useful right now.  I'm re-figuring things out (note to self: close to the laser, you have to use Gaussian
optics...regular ray tracing doesn't really work), and hopefully will have the oplev back under control by the time Alberto is finished realigning the
Entry  Mon Jul 27 17:48:44 2009, Jenne, Update, oplevs, ETMY oplev is still down for the count 
ETMY oplev is still out of order.  Hopefully I'll get it under control by tomorrow. 
Entry  Fri Dec 4 21:48:01 2009, Jenne, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered Oplev_IPang_screenshot_4Dec2009.png
[Jenne Koji]
 We aligned the full IFO, and centered all of the oplevs and the IP_POS and IP_ANG QPDs.  During alignment of the oplevs, the oplev servos
were disabled.
    Reply  Fri Dec 4 23:17:55 2009, rob, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered 


    
        
            Quote:
        
        
            
            [Jenne Koji]
    Reply  Sat Dec 5 01:40:11 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered 
We restarted daqd and it did restored the problem
http://lhocds.ligo-wa.caltech.edu:8000/40m/Computer_Restart_Procedures#fb40m
Then restart the 'daqd' process:'telnet fb40m 8087', type "shutdown" at the prompt. The framebuilder
    Reply  Sat Dec 5 18:23:48 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered Screenshot_091205_1830.png
NOTE: HEPA is on at its full.

[[[OK]]] Align the suspended optics (by Rob)
Entry  Fri Feb 19 02:38:32 2010, Koji, Configuration, oplevs, Intsant green oplevs for ITMs shooting from the ends 
I set up instant green oplevs for ITMs.
A green laser pointer has been set on each end table. It illuminates the ITM center. The beam goea through the ETM substrate.
The reflected green beam returns to the ETM if the ITMs are aligned. Even though the reflected beam to the end is too big, this can 
Entry  Wed Mar 13 11:34:24 2013, Steve, Update, optical tables, table covers moved to CES acrylicEnclosure.jpg
The two acrylic optical table enclosures were moved from the carpenter shop to CES. I need to order windows. The latest quotes from Laseroptik  are posted at the wiki / aux_optics page.
Things to do: order windows, draw and order window flange, install surgical tubing seals, buy and line enclosures with IR shield films.
Entry  Mon Mar 25 18:58:09 2013, Albert Yang, Update, optical tables, Optical Table Toolboxes 
For those of you who spend annoying amounts of time looking for tools, fear no more. Toolboxes for each optical table are coming!
They will probably have:
IR Viewer (a few optical tables will have IR viewers, these specific tables will be labeled in the diagram coming out later)
Entry  Mon Apr 1 16:16:16 2013, Albert, Update, optical tables, Optical Table Toolboxes Update 
A heavy duty plastic box is the likeliest candidate for the optical table toolbox. It measures 5 9/16 in. x 11 5/8 in. x 4 5/8 in. and fits all the tools
comfortably. ( http://www.mcmaster.com/#plastic-bin-boxes/=m4yh4m  ,  under
Heavy Duty Plastic Bin Boxes)
    Reply  Mon Apr 1 16:35:42 2013, Albert, Update, optical tables, Optical Table Toolboxes Update 


    
        
            Quote:
        
        
            

           A heavy duty plastic box is the likeliest candidate for the optical table toolbox. It measures 5 9/16 in. x 11 5/8 in. x 4 5/8 in. and fits
    Reply  Tue Apr 2 21:11:42 2013, Rana, Update, optical tables, Optical Table Toolboxes Update 


    
        
            Quote:
        
        
            

           A heavy duty plastic box is the likeliest candidate for the optical table toolbox. It measures 5 9/16 in. x 11 5/8 in. x 4 5/8 in. and fits
    Reply  Wed Apr 3 19:01:06 2013, Albert, Update, optical tables, Optical Table Toolboxes Update 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Wed Apr 3 23:22:20 2013, rana, Update, optical tables, Optical Table Toolboxes Update 
 There are some tips for how to appy nail polish on YouTube from MKNails and MissJenFABULOUS. Their tips on how to prepare the site for a strong
bonding strength are probably helpful for our gold/nickel coated tools. For chrome tools we may need to abrade the surface with a stone or fine sandpaper
for it to take the layer better. IF the YouTube videos don't do it for you, then I suggest contacting Tom Evans at LLO to find out what kind of nail polish
    Reply  Thu Apr 11 16:29:23 2013, Albert, Update, optical tables, Optical Table Toolboxes Update Diagram.png


    
        
            Quote:
        
        
            

            There are some tips for how to appy nail polish on YouTube from MKNails and MissJenFABULOUS. Their tips on how to prepare the site
    Reply  Mon Apr 15 17:44:28 2013, Albert, Update, optical tables, Optical Table Toolboxes Update photo.JPG
I decided to go see what the electrical tape looks like on the other tools.
These are the tools I felt were necessary to label with tape: (the others don't seem to be terribly important in terms of not interchanging between
boxes)
    Reply  Wed Apr 24 18:51:12 2013, Koji, Configuration, optical tables, PD frequency response 
The fibers should be routed beneath the electrical cables. 
They should be fixed on the table for strain relieving.
The slack of the fibers should be nicely rolled and put together at the splitter side.
    Reply  Mon Apr 29 08:17:40 2013, Albert, Update, optical tables, Optical Table Toolboxes Update 


    
        
            Quote:
        
        
            

           I decided to go see what the electrical tape looks like on the other tools.
    Reply  Mon Apr 29 15:53:49 2013, Albert, Update, optical tables, Optical Table Boxes 7x


    
        
            Quote:
        
        
            

            
    Reply  Fri May 31 10:25:17 2013, steve, Update, safety, first aid kits refilled refilledFAidK.jpg


    
        
            Quote:
        
        
            

            
Entry  Tue Jun 4 10:47:57 2013, Steve, Update, safety, safety training 
Our early bird surf student Gautem has received 40m specific basic safety training today.
    Reply  Thu Jun 6 16:33:19 2013, steve, Update, safety, updated laser inventory ELSOconnected.jpg
 Updated laser inventory and operator list. They are posted in the 40m wiki and entry doors of the 40m IFO room.
Let me know if this list needs correction.
Lightwave  M126N-1064-700 NPRO sn 337 in the PSL enclosure got connected to local emergency shut off switch. This is a LIGO operational safety
    Reply  Tue Jun 25 10:23:20 2013, Steve, Update, safety, surf safety training surfs2014.jpg
 Alex Cole and Craig Cahillane received 40m specific,  basic safety training last week.
 
Entry  Thu Jun 27 17:04:49 2013, Jenne, Update, safety, Nitrogen bottle too hot - overpressured 
All of us in the control room / desk area heard a sudden whoosh of air a few minutes ago.  It kind of sounded like a pressure washer or something. 
We determined that the northmost nitrogen bottle outside the front door was letting out all its gas.  
It's a gazillion degrees outside (okay, only 91F, according to a google of "Caltech Weather"), and those bottles are in direct sun all
Entry  Wed Jul 31 09:51:43 2013, Steve, Update, safety, Sujan receives safety training IMG_0031.JPG
Sujan got 40m specific basic safety training this morning.
Entry  Mon Aug 19 09:54:13 2013, Steve, Update, safety, Masayuki receives safety training 
Masayuki Nakano, a student of Seiji's from ICRR / U Tokyo, is visiting us here at the 40m lab for the next couple months.
He received 40m specific basic safety training this morning.
    Reply  Fri Aug 30 08:08:29 2013, steve, Update, safety, fire horns-flashers tested OK 
 
 We had fire alarm tests  and evacuation drills at 1:30pm yesterday. All flashers and horns are functioning unbearably loud and bright
including clean assembly room.
Entry  Thu Oct 10 08:25:07 2013, Steve, Update, safety, Chris received safety training 
Chris Couste, our new undergrad help received 40m specific, basic safety training yesterday.
Entry  Fri Feb 14 12:39:02 2014, Jenne, Update, safety, Smoke detector cleaned 
Facilities just came by and cleaned the smoke detector that is above Steve's desk.  It's next to an air vent, so I guess it collects dust more than
a "typical" smoke detector.
    Reply  Wed Feb 19 08:07:01 2014, steve, Update, safety, annual laser safety glasses check  AA2014checked.jpg2014check.jpg
 
 All 40m laser safety glasses are cleaned and measured this morning.  Bring
your own safety glasses if you have to enter the 40m IFO room.
    Reply  Tue Feb 25 16:54:57 2014, steve, Update, safety, safety audit 2014 
 
 We had our annual safety inspection today.  Our SOPs are outdated. The full list of needed
correction will be posted tomorrow.
    Reply  Thu Feb 27 13:11:13 2014, steve, Update, safety, safety audit correction noDaisyChaining.jpgZbThumbnail.info


    
        
            Quote:
        
        
            

            
    Reply  Thu Mar 13 16:05:48 2014, steve, Update, safety, safety audit 2014 T1400198-v1-CIT-LIGO_Labs_Annual_Safety_Audit_2014.pdf


    
        
            Quote:
        
        
            

            
    Reply  Mon Mar 17 10:50:58 2014, steve, Update, safety, 2014 annual crane certification 2014craneCert.jpg


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Mon Apr 28 17:27:29 2014, steve, Update, safety, safety audit 2014 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Tue Apr 29 00:11:03 2014, steve, Update, safety, safety audit 2014 
Be aware that this may affect POP QPD and POP RF Thorlabs PD


    
        
            Quote:
        
        
            
    Reply  Fri May 2 08:15:54 2014, steve, Update, safety, safety audit 2014 solidCoverRequired.jpg
 
 Late adition: CHECK all viewport covers.
A, transparent Lexan sheet is protecting glass windows in a horizontal position
Entry  Wed May 21 13:51:19 2014, Steve, Update, safety, scope battery recall 
Tektronix RECALL on TDS3000 or TDS300B  oscilloscope BATTERIES
TDS3BATB
This Lithium-Ion battery can be a fire hazard !  Remove battery pack and recycle it through Safety Office
Entry  Mon Jun 9 09:41:06 2014, steve, Update, safety, safety training 2014surfs.jpg
2014 surf students Nichin and Akhil received 40m specific basic safety training last week.