    Reply  Tue Jul 26 11:38:45 2011, steve, Update, SUS, ETMY bias checked 
 
 I test drove ETMY biases.
PITCH  worked well in slow and fast modes. Slow drive was from the IFO alignment screen C1:SUS-ETMY_PIT_COM and
    Reply  Wed Jul 27 10:10:12 2011, steve, Update, PSL, locking status 80dpmcMC.jpg
 80 days: PMC is drifting
Entry  Wed Jul 27 15:38:01 2011, steve, Update, VAC, beam traps for vacuum P1080095.JPG
We have cleaned, baked, rga scaned traps for vacuum. Thorlabs LB1 on 1" OD ss posts and forks. The effective surface area is 43 x 18 mm of stacked
razors.
Seven pieces are mounted on New Focus #9962  1" OD SS vented-  pedestrals to 5.5" center height and 5 pieces to 4.875"
Entry  Wed Jul 27 15:49:56 2011, steve, Update, SAFETY, Manuel receives safety training P1080096.JPG
Our surf student Manuel Marchiò received 40m specific safety training today.
Entry  Thu Jul 28 16:26:42 2011, steve, Update, SUS, ITMX, ITMY & ETMY OSEM gains adjusted 
 
OSEM damping gains were adjusted by observing  real time dataviewer to get Q of 5
OSEMs were kicked up one by one with 200 counts  ~1sec. The error signal was optimized to get 1/2 of exitation amplitude at the 5th sinusoid
Entry  Fri Jul 29 16:04:51 2011, steve, Update, SUS, ETMX, PRM & SRM OSEM gains set 
Jamei fixed the computer. Now I had a healthier ETMX with SIDE signal that allowed me to set gains to get Q of 5
The Y arm restore locked the arm at TRY -out 2.4V,    the X arm still did not lock or align to lock. It has some fringes.
ETMX  POS gain   22  -> 17,              PIT  3  -> 
Entry  Mon Aug 1 08:52:37 2011, steve, Update, VAC, preparation to vent pztsteering.pngvac1Aug2011.pngPEM200d.jpg
Both arms locked easely around 1V transmited.  We should recenter oplevs.
Entry  Mon Aug 1 16:06:05 2011, steve, Update, SUS, oplevs are centered 
Kiwamu, Koji and Steve,
Arm aligned separatly and oplev qpds were centered  including BS. Than we realigned manually DRM and centered their qpds.
ALL SUS oplevs were centered to resonating cavities.
Entry  Mon Aug 1 17:47:37 2011, steve, Update, ASC, what is not working 
SUS-ETMY_QPD is not responding. It is reading zero in dataviewer and 4,400 counts on QPD MEDM screen.......must be wrong cable connected
IP-POS is sick. Last time alive 7-19-2011
IP-ANG beam is clipping on pick-up mirror at ETMY chamber. This will have to be fixed at the vent. The qpd itself is responding to light.
Entry  Wed Aug 3 09:40:13 2011, steve, Update, VAC, vent pzt2011Aug3.png
The vacuum system is coming up to atm. The vent was started with slow N2 flow. The PSL output is blocked 2 places on the table.
Entry  Wed Aug 3 14:20:49 2011, steve, Update, SUS, ITMX and PRM damping restored 
ITMX watchdog tripped around 5 Torr  and the PRM around 450 Torr of this vent. They were restored than.
We are at 580 Torr now.
Entry  Wed Aug 3 16:18:30 2011, steve, Update, VAC, vent is almost finished vent8h.jpg
P1 at 750 Torr,  Vent valve VV1 is left open to atm. It will reach equilibrium in an hour. The PSL power is not turned down yet. The beam path is
blocked at two places inside the enclosure.
The low power 20 mW  input  MC can be locked tonight.
Entry  Thu Aug 4 08:25:51 2011, steve, Update, SUS, sus at atm SUSatm.pngoplevsaftervent.png
ITMX and PRM moved alot.  BS and   ITMY just a little based on oplev reference.
Entry  Fri Aug 5 13:51:51 2011, steve, Update, SUS, cross coupling 
We need a plan how to minimize cross coupling in the OSEMs now
Entry  Fri Aug 5 14:03:12 2011, steve, Update, General, malfunctioning crane at ETMY 
The horizontal trolley drive stopped working  at the east end this morning. It is working intermittently. In the worst case we can take the door
off with the manual -Genie- lift.
I'm working with Konecrane to solve  the wormgear drive problem.
    Reply  Mon Aug 8 13:24:00 2011, steve, Metaphysics, Treasure, Monday morning P1080147.JPG


    
        
            Quote:
        
        
            

           Just a reminder that a film crew will be here Monday morning, filming Christian Ott for some Discovery channel show.
    Reply  Mon Aug 8 14:21:03 2011, steve, Update, PEM, Particle counts controlled P1080149.JPGP1080150.JPG


    
        
            Quote:
        
        
            

           [Jenne, Kiwamu]
Entry  Mon Aug 8 15:52:39 2011, steve, Update, VAC, back ground rga scan bg-d5.jpgpresBg-d5.jpg
The RGA region is beeing monitored during the vent. This will tell us how clean the RGA itself is.
 
Entry  Tue Aug 9 16:40:12 2011, steve, Update, General, clean room coat counts  P1080155.JPG
I measured the particles coming off of new- unused clean room coat. Tyvek, Convertors, Allegiance #9393 measured  10 counts of 0.3 micron at 1 minute
and 0 count at 7 minute.
The 0.5 micron size  measured 0 at both times. Jenne's used coat measured 20 counts of 0.3 micron  and 0 counts for 0.5 micron at 1 minute.
Entry  Tue Aug 9 16:54:47 2011, steve, Update, VAC, scratch on vac door P1080152.JPG
Jenne found a big scratch on the north vac door of ITMY. Fortunately it does not reach the inner annulos 0 -ring seal.
This is precisely what we have to avoid to preserve our vacuum
system!
    Reply  Wed Aug 10 07:59:33 2011, steve, Update, SUS, this is too dam nice 


    
        
            Quote:
        
        
            

           Suresh and I tweaked the OSEM angles in ETMX yesterday.  Last night the ETMs were left free swinging, and today I ran Rana's peakFit
Entry  Thu Aug 11 08:29:28 2011, steve, Update, Computers, dataviewer at Rosalba gpsfmb.png
I'm having this problem with DTV every morning at Rosalba only. It wants to start with a negative GPS time and it can not connect to the frame builder.
Normally after a few time of starting it, it will work.
    Reply  Thu Aug 11 15:31:43 2011, steve, Update, General, malfunctioning crane at ETMY 


    
        
            Quote:
        
        
            

           The horizontal trolley drive stopped working  at the east end this morning. It is working intermittently. In the worst case we can take
Entry  Thu Aug 11 16:07:37 2011, steve, Update, SUS, ETMY rack cables strain releived P1080159.JPGP1080160.JPG
 
Entry  Fri Aug 12 16:52:49 2011, steve, Update, General, Chamber illuminator switch 
I'm looking for an ether net based  power switch for turning lights on and off for the vacuum system from MEDM screen.  This
is what I found
Jamie please take a look at it.
    Reply  Thu Aug 18 10:59:04 2011, steve, Update, Treasure, Prepared for drag wiping 


    
        
            Quote:
        
        
            

           While waiting for the IFO team to align things (there were already ~5 people working on a ~1 person job...), I got all of our supplies prepped
Entry  Thu Aug 18 15:54:35 2011, steve, Update, SUS, damped and undamped OSEMs 5susLL.jpg8freeSUSLL.jpg
damped sus at atm1 and freeswingging sus at atm2
 
Entry  Fri Aug 19 09:14:56 2011, steve, Update, IOO, degrading laser power at atm power@atm.jpg
Light into the MC is 20 mW at atm, MC_Transmitted ~10 MW = 400 count
The PMC_T is OK but something else is drifting.
Entry  Fri Aug 19 10:26:53 2011, steve, Update, SUS, OSEM sensor spectra 8freeSUSosemSensors.jpg
Free swingging OSEM sensors LL at atm
Entry  Fri Aug 19 15:31:53 2011, steve, Update, General, power interruption rescheduled to 10-1-2011 
                UTILITY
& SERVICE INTERRUPTION
**PLEASE  POST**
Entry  Mon Aug 22 11:40:08 2011, steve, Update, VAC, cranes checked 
Cranes are  checked and they are ready for lifting. At the east end will use the manual Genei-lift to put door on.
    Reply  Thu Aug 25 08:12:09 2011, steve, Update, SUS, ETMY & ITMY wiped, replaced, vac door on 


    
        
            Quote:
        
        
            
            We've closed up ETMX:
Entry  Thu Aug 25 17:14:49 2011, steve, Update, VAC, clean room fashion changes P1080185.JPGP1080183.JPG
Jamie is modeling our next generation  in-vac
& clean room bonny suit  that Jenne and myself already tested.
It is quite bearable with our traditional cleanroom beret-bouffant cap. Please use these in the future.
    Reply  Fri Aug 26 07:53:59 2011, steve, Update, SUS, Broken UL magnet on ITMX 


    
        
            Quote:
        
        
            

           Dmass just reminded me that the usual procedure is to bake the
    Reply  Fri Aug 26 10:45:17 2011, steve, Update, General, crane at ETMY is fixed P1080190.JPGP1080188.JPG


    
        
            Quote:
        
        
            

           The horizontal trolley drive stopped working  at the east end this morning. It is working intermittently. In the worst case we can take
Entry  Fri Aug 26 15:59:33 2011, steve, Update, General, drawer cabinet moves in P1080192.JPG
manufacturer info
Jamie and Shuresh moved in Jenne's 11 drawers cabinet and relocated old note book boxes on the inside of the vac tube.
Entry  Tue Aug 30 10:49:29 2011, steve, Update, SUS, BS & PRM damping restored 
I have restored the damping of BS and PRM. Today is janitor day. He is shaking things around the lab.
Entry  Wed Aug 31 11:37:56 2011, steve, Update, Green Locking, shutter in place at east end 
Uniblitz mechanical shutter installed in the green beam path at ETMY-ISCT  The remote control cable has not been connected.
Entry  Thu Sep 1 11:03:22 2011, steve, Update, VAC, back ground rga scan v70-bg-d29scan.jpgvent70tempres.jpg
The RGA back ground at day 29 of this vent.
Entry  Thu Sep 1 15:07:45 2011, steve, Update, SUS, why ITMY is moving more ? itmy_srm_etmx.jpgP8220152.JPG
Atm1, ITMY and the SRM are on the same isolation stack.  So why does  the SRM move twice as much?
Atm2, We should check the ITMY  SIDE_OSEM before pump down. Anatomically correct, beautiful picture taken by Kiwamu on August 22
Entry  Thu Sep 1 15:59:46 2011, steve, Update, SUS, light doors on at the ITMs 
Suresh, Kiwamu and Steve
Heavy chamber doors replaced by light ones at  ITMX-west and ITMY-north locations.
    Reply  Tue Sep 6 08:05:53 2011, steve, Update, SUS, ITMX must be touching osemITMX.jpg


    
        
            Quote:
        
        
            
            The new ITMX was aligned by changing the DC
Entry  Wed Sep 7 08:14:01 2011, steve, Update, SUS, final OSEM check finalcheck.jpgITMX10min.jpgfinalsum.png
All fine, except ITMX_sensor_UL's  60  counts deep hoop for an hour.
Entry  Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started 
Jamie and Steve
We closed ITMX and ITMY chambers and started pumping around 11am
What we did before:
    Reply  Wed Sep 7 13:28:25 2011, steve, Summary, Cameras, All Camera setups a need upgrading 


    
        
            Quote:
        
        
            
            I just tried to adjust the ETMY camera and its not very user friendly = NEEDS FIXING.
    Reply  Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight 


    
        
            Quote:
        
        
            
            Jamie and Steve
    Reply  Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted pd#71.jpgmaglevpd.jpg
Vacuum status:  " vacuum normal"   CC1 pressure 5e-5 Torr
Slow roughing through butterfly valve took 11 hours at 1-2 Torr/min speed.  We had a leak at the metal hose connecting o-ring  that became
visible  at 200 Torr.
Entry  Thu Sep 8 13:20:07 2011, steve, Update, PEM, vac envelope at atm for 36 days vent70.jpg
We tried not to open chambers above 10,000 particles of 0.5 micron cf/min
New items going in:                       2 rasor beam traps, 5 badly oxidized
old silver plated  setscrew with spring loaded tips......to be replaced in the future, viton tips for eq screws....some are lose, gold plated allen
    Reply  Tue Sep 13 16:57:44 2011, steve, Update, LSC, ITMX oplev ** 


    
        
            Quote:
        
        
            

           I lined up the Y Arm for locking and then centered the oplevs for ETMY and ITMY.
Entry  Wed Sep 14 07:51:20 2011, steve, Update, SUS, PRM damping restored 
The PRM damping was restored at side sensor var 1050