40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 339 of 344  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Mon Apr 19 11:31:04 2010, Aidan, Update, Green Locking, 1W NPRO output profile 
Entry  Tue Apr 20 13:02:14 2010, Zach, Update, Green Locking, 1W NPRO output profile profile_fit_4_19_10.png
    Reply  Tue Apr 20 13:37:36 2010, Jenne, Update, Green Locking, 1W NPRO output profile 
    Reply  Tue Apr 20 19:37:02 2010, Koji, Update, Green Locking, 1W NPRO output profile 
    Reply  Mon Apr 11 17:03:41 2016, Steve, Update, Calibration-Repair, 1W Innolight repair completed 
    Reply  Mon Mar 21 14:29:32 2016, Steve, Update, Calibration-Repair, 1W Innolight laser repair diagnoses 
Entry  Thu Oct 21 10:44:56 2010, steve, Metaphysics, Treasure, 1987 supernova tapes plus....? P1060932.JPG
Entry  Mon May 24 08:38:26 2021, Chub, Update, Electronics, 18-bit AI, 16-bit AI and 16-bit AA 
Entry  Tue Nov 17 14:31:25 2015, ericq, Update, CDS, 16Hz frame writing temporarily disabled 
    Reply  Tue Nov 17 20:57:43 2015, ericq, Update, CDS, 16Hz frame writing running again 
Entry  Thu Apr 30 05:49:06 2009, Yoichi, Update, Locking, 166MHz LO phase changed 
Entry  Fri May 1 01:32:43 2009, Yoichi, Update, Locking, 166MHz LO phase adjustment 
    Reply  Fri May 1 10:04:10 2009, rob, Update, Locking, 166MHz LO phase adjustment 
Entry  Thu Jan 28 09:17:32 2010, Alberto, Update, LSC, 166 Modulation turned off 
Entry  Mon Jan 25 16:30:37 2010, Alberto, Update, ABSL, 166 MHz sideband turned off 
    Reply  Mon Jan 25 16:46:33 2010, Alberto, Update, ABSL, 166 MHz sideband turned off 
    Reply  Tue Jan 26 03:28:56 2010, rana, Update, ABSL, 166 MHz sideband turned off 
Entry  Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired 
Entry  Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
    Reply  Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
    Reply  Fri Dec 11 09:30:09 2009, Koji, Configuration, LSC, 166 LO Disconnected 
    Reply  Fri Dec 11 11:42:26 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
    Reply  Fri Dec 11 14:12:32 2009, rana, Configuration, LSC, 166 LO Disconnected 
    Reply  Fri Dec 11 19:51:13 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
Entry  Wed Apr 19 15:46:24 2017, gautam, Update, General, 1611/1811 inventory check 
Entry  Thu Feb 24 17:42:00 2011, Aidan, Update, Green Locking, 15% of end laser sideband power transmitted through cavity 
Entry  Mon Feb 10 18:03:41 2014, jamie, Update, CDS, 12 core c1sus replacement 
Entry  Tue Oct 9 23:12:56 2012, Jenne, Update, LSC, 11MHz reconnected to EOM 
Entry  Fri Apr 15 12:17:39 2011, kiwamu, Update, LSC, 11MHz demod board : funny I-Q phase relativephase.png
    Reply  Fri Apr 15 15:15:08 2011, kiwamu, Update, LSC, 11MHz demod board : 90 degree splitter 
    Reply  Sat Apr 16 02:00:14 2011, rana, Update, LSC, 11MHz demod board : 90 degree splitter 
    Reply  Thu Mar 4 22:07:21 2010, rana, Update, 40m Upgrading, 11MHz PD not yet designed 
Entry  Thu Mar 4 19:53:56 2010, Alberto, Update, 40m Upgrading, 11MHz PD designed adjusted for diode's resistance; 55 MHz RFPD designed 6x
Entry  Mon Apr 30 22:58:57 2012, Jenne, Update, Electronics, 11MHz Marconi set to default after power outage 
Entry  Tue Apr 21 11:55:05 2015, Steve, Update, Optical Levers, 1103P noise measurement 1103P@qpdBS.jpgoplev1103P.pngoplevSum1103Pbs.png
    Reply  Tue Apr 21 15:03:27 2015, rana, Update, Optical Levers, 1103P noise measurement 
    Reply  Tue Apr 21 21:46:34 2015, rana, Update, Optical Levers, 1103P noise measurement oplev1103P.pngL1-ISI_SUS_ODC_FC496F_SPECTRUM-1113523216-86400.png
    Reply  Tue Aug 27 18:21:35 2013, Jenne, Configuration, Electronics, 110 MHz LO options 
    Reply  Tue Aug 27 18:58:52 2013, Koji, Configuration, Electronics, 110 MHz LO options 
Entry  Fri Sep 7 12:28:09 2012, Koji, Update, LSC, 11&55MHz modulations turned off 
Entry  Mon Aug 18 09:19:55 2008, steve, Summary, VAC, 11 days at atm ventprm.jpg
    Reply  Wed Oct 10 02:15:14 2012, rana, Update, LSC, 11 MHz reconnected to EOM 
Entry  Wed Mar 3 18:32:25 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics rfpd11_v2_TF.pdfrfpd11_v2_Noise.pdf
    Reply  Thu Mar 4 08:43:35 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics rfpd11_v2.fil
Entry  Fri Apr 21 13:59:47 2017, Eric Gustafson, Summary, , 1064 nm Semiconductor Laser Fiber Distribution System and Mirror Tomography 
Entry  Fri Oct 18 08:12:08 2013, Steve, Update, PEM, 1000 days trends trend1000days.png
    Reply  Mon Jun 1 19:19:26 2009, rana, Update, PSL, 1000 days of hour-trend u.png
Entry  Tue Dec 17 20:59:23 2013, Jenne, Update, LSC, 1/sqrt(TR) signals added to frames 
Entry  Wed Jul 7 19:41:27 2010, Jenne, Update, SUS, 1.5 more ECD sets suspended for tip tilts ECDbackplane_blackdump_small.jpgECDbackplane_foil_small.jpg
    Reply  Wed Feb 6 14:51:25 2013, Jenne, Update, Electronics, 1 power supply replaced! 
ELOG V3.1.3-