40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log, Page 339 of 357 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Tue Mar 26 00:06:37 2013, Jenne, Update, Locking, AS beam put back on PD
|
Mon Oct 17 22:45:16 2016, gautam, Update, General, AS beam centered on all OMs 7x
|
Wed Jun 27 16:23:12 2012, yuta, Update, IOO, AS and REFL on AP table aligned
|
Tue Nov 6 17:07:04 2012, jamie, Update, Alignment, AS and REFL 
|
Mon Nov 28 20:14:27 2022, Anchal, Update, ASC, AS WFS proposed path to IMC WFS heads
|
Sat Jan 21 15:32:40 2023, Anchal, Update, ASC, AS WFS path nominally set
|
Mon Jan 23 20:50:58 2023, Anchal, Update, ASC, AS WFS path beam profiled  
|
Tue Jan 24 21:04:59 2023, Anchal, Update, ASC, AS WFS path beam profiled
|
Fri Feb 3 12:50:47 2023, Anchal, Update, ASC, AS WFS model changes and phase calibration 
|
Mon Aug 16 23:30:34 2021, Paco, Update, CDS, AS WFS commissioning; restarting models
|
Mon Aug 2 16:18:23 2021, Paco, Update, ASC, AS WFS MICH commissioning
|
Tue Aug 6 12:43:23 2013, Alex Cole, Configuration, Electronics, AS Table and Rack 1Y1 Additions 
|
Tue Jul 16 17:02:41 2013, Alex Cole, Configuration, Electronics, AS Table Additions 
|
Wed Jul 17 11:13:36 2013, Alex Cole, Configuration, Electronics, AS Table Additions
|
Wed Jul 17 16:15:42 2013, Alex Cole, Configuration, Electronics, AS Table Additions  
|
Wed Apr 13 23:32:07 2011, Aidan, Jamie, Configuration, LSC, AS PD and Camera installed 
|
Fri Apr 15 22:57:38 2011, Aidan, Jamie, Configuration, LSC, AS PD and Camera installed
|
Mon Jan 12 18:53:03 2009, Yoichi, Update, LSC, AS CCD centering and ASDD demod phase
|
Tue Jan 13 18:59:09 2009, Kakeru, Update, LSC, AS CCD centering and ASDD demod phase
|
Wed Jan 21 16:18:17 2009, Kakeru, Update, LSC, AS CCD centering and ASDD demod phase
|
Wed Jan 21 22:53:08 2009, rana, Update, LSC, AS CCD centering and ASDD demod phase
|
Thu Sep 6 18:49:30 2012, Jenne, Update, RF System, AS 55 may be broken
|
Thu Sep 6 19:36:19 2012, Jenne, Update, RF System, AS 55 is fine
|
Sat Dec 1 00:13:16 2012, Den, Update, Adaptive Filtering, ARMS and MC
|
Fri Nov 30 22:11:50 2012, Den, Update, Adaptive Filtering, ARMS
|
Mon Feb 18 00:03:46 2013, Zach, Update, Computer Scripts / Programs, ARBCAV v3.0
|
Fri May 18 15:25:15 2012, steve, Update, SUS, AR coated lens swapped in at ETMX oplev
|
Tue May 6 17:28:39 2008, rob, Configuration, LSC, AP33 -> POX33
|
Wed May 7 15:25:41 2008, rob, Configuration, LSC, AP33 -> POX33
|
Fri Feb 2 22:47:00 2018, Koji, Summary, General, AP1053: Packaging & Performance   
|
Wed Apr 27 09:05:10 2016, Steve, Update, General, AP viewport  
|
Wed Mar 28 16:44:27 2018, Steve, Update, General, AP table today
|
Thu Jun 23 10:17:49 2011, steve, Update, PSL, AP table is open to PSL again 
|
Thu Nov 11 11:08:26 2010, steve, Bureaucracy, PEM, AP table found open
|
Mon Sep 12 18:45:04 2011, Anamaria, Configuration, LSC, AP table current layout
|
Sat Nov 24 22:14:08 2012, Koji, Update, General, AP table cleaning up 
|
Wed Feb 9 10:25:46 2011, steve, Update, SAFETY, AP table
|
Thu Apr 19 09:57:03 2018, gautam, Update, Wiki, AP and ETMX tables uploaded to wiki
|
Thu Jun 30 07:42:48 2011, Suresh, Update, IOO, AP Table Power levels 
|
Mon Mar 30 17:02:46 2009, Yoichi, Configuration, General, AP OSA aligned
|
Fri Sep 4 10:25:19 2015, Steve, Configuration, IOO, AOM stage is ready 
|
Mon Sep 7 18:25:16 2015, rana, Configuration, IOO, AOM stage is ready
|
Mon Jun 30 22:40:21 2014, Manasa, Update, PSL, AOM ringdown
|
Wed Nov 27 16:10:29 2019, gautam, Update, LSC, AOM reconnected
|
Mon Jun 20 08:26:56 2016, Steve, Update, PSL, AOM pictures  
|
Tue Sep 18 20:32:42 2012, Manasa, Configuration, PSL, AOM installation
|
Wed Sep 19 11:39:37 2012, Manasa, Configuration, PSL, AOM installation
|
Wed Sep 19 15:41:27 2012, Manasa, Configuration, PSL, AOM installation
|
Wed Sep 19 23:17:25 2012, rana, Configuration, PSL, AOM installation
|
Thu Sep 20 01:29:04 2012, Manasa, Configuration, PSL, AOM installation
|
|