  7856   Wed Dec 19 11:53:23 2012 SteveUpdateVACAC removed Koji, Manasa, Jenne, Jamie, Bob and
Steve
Access connector removed this morning
 workingatatm.png 
  7914   Thu Jan 17 17:04:49 2013 SteveUpdateVACvac monitor screen changedThe COVAC_MONITOR.adl was changed. Ion
pump labeled as disconnected means: ion pump
controller power turned off and ion pump
 screenmod.png 
  7936   Thu Jan 24 08:28:35 2013 SteveUpdateVACwhen to pumpdown ?Reminder: I will be on vacation next week.
We would have to put the access connector
in tonight if I'm pumping down Friday, tomorrow.
  
  7939   Thu Jan 24 14:40:09 2013 SteveUpdateVACRGA backgroung RGA background with VM2 open to Maglev
at day 37
 
 Screenshot.png 
  8057   Mon Feb 11 16:16:27 2013 SteveUpdateVAC55 days at atmoshereCP
Stat 100  sheet-covers were replaced
by clean ones on open chambers BS, ITMX,
 atm55d.png 
  8106   Tue Feb 19 08:42:31 2013 KojiUpdateVACETMX door open[Steve, Yuta, Koji]
The ETMX heavy door was removed.
  
  8129   Thu Feb 21 15:21:07 2013 yutaUpdateVACall heavy doors on, started pumping down annulus[Steve, Manasa, Jenne, Sendhil, Evan,
Yuta]
  
  8131   Thu Feb 21 18:01:27 2013 SteveUpdateVACpumpdown at 230 Torr 
 We are pumping down with RP1
& RP3 oily roughing pumps at 3 Torr/min
  
  8134   Thu Feb 21 21:12:42 2013 KojiUpdateVACpumpdown at 230 Torr[Rana, Yuta, Koji]
21:05 at the pressure of 10torr
V3 closed. RV1 manually closed. RPs
  
  8135   Fri Feb 22 08:01:25 2013 SteveUpdateVACpumpdown continuous 
 Pump
down is restarted after 10.5 hrs stop overnight.
 16hrs_pd75.png 
  8136   Fri Feb 22 11:12:16 2013 SteveUpdateVACpumpdown completed IFO   P1 pressure is 1
mTorr.  It is ready for high power light.
The Maglev took over the pumping
 mag60min.pngpd75at20h.png 
  8155   Mon Feb 25 08:22:03 2013 SteveUpdateVACpumpdown at day 4 All normal, IFO pressure 1.5e-5 Torr
RGA is pumped by TP-3 in back ground
mode.
 4d.png66d@atm.png 
  8206   Fri Mar 1 14:50:36 2013 SteveUpdateVACpumpdown day 8 Atm1, RGA background scan with TP3
pumping at day 7
Atm2,  IFO  CC1 = 1.1e-5
 bgTP3d7.pngRGAonIFO.png 
  8231   Tue Mar 5 14:59:32 2013 SteveHowToVACdry-forepump replacedTP3 turbo pump's dry-foreline pump was
replaced.
How to do it:
 changingforepump.pngTP3wFp600.jpg 
  8238   Wed Mar 6 08:40:03 2013 SteveUpdateVACfirst scan of this pumpdown Pumpdown 75 - Maglev - day 12
Precondition: 66 days at atm, installed
TIP-TILTs with coils that  replaced
 pd75m12d.pngpd75mRGA12d.png 
  8311   Tue Mar 19 17:00:14 2013 SteveUpdateVAClarge window quote of Cascade Optical quality 6.5" OD window specs
and quotes for vacuum view ports and optical
table enclosure are on the 40m wiki_ Aux
  
  8664   Mon Jun 3 09:46:40 2013 SteveUpdateVACRGA scan at day 100 Vacuum normal condition at pumdown
day 100
 
 d100Mpd75.pngd100Mpd75p.pngbadguys.png 
  8847   Mon Jul 15 14:12:15 2013 SteveUpdateVACRGA scan at day 144 Pumpdown 75, vacuum normal condition
at day 144
 
 pd75mRGA144d.pngpd75m144d.png 
  8904   Tue Jul 23 08:21:31 2013 SteveUpdateVACVent has started 
Thanks for the good preparation. 
IFO pressure P1=20 Torr 
 beforVent.pngstartVent.png 
  8907   Tue Jul 23 14:00:03 2013 SteveUpdateVACthe vent is completed The 40m IFO has reached  atmospher
in 5 hours. It is ready to open chamber condition.
The RGA is pumped with the maglev.
 Atm.png5cyl.pngventSum1d.png 
  8914   Tue Jul 23 22:55:13 2013 JenneUpdateVACBS, ITMY doors to be opened in the morningWe will open the BS and ITMY doors first
thing tomorrow morning. I plan to try to
be in around 9 am.  The first order of business
  
  8915   Wed Jul 24 10:35:41 2013 SteveUpdateVACBS, ITMY doors are removed

    

       
            
 beforeDoorsOff.pngparticlecount10d.png 
  8933   Mon Jul 29 16:04:40 2013 SteveUpdateVACAC removed Manasa, Eric, Evan, Koji and Steve,
Access connector removed in order
to complete alignment. Light aluminum with
 acout.pngAlAcACa.jpgAlAcACb.jpg 
  8934   Mon Jul 29 16:15:13 2013 KojiUpdateVACAC removedPrior to the access connector removal,
Manasa and I aligned the IFO mirrors. 
The arms were locked and aligned by
  
  8946   Wed Jul 31 10:27:00 2013 SteveUpdateVACinstrument grade air is discontinouedWe have been using Air Liquide Instrument
Grade Air for venting the 40m vacuum envelope.
It is no longer available.
  
  8963   Mon Aug 5 10:50:48 2013 SteveUpdateVACRGA background RGA background at day 12 of this
vent . The maglev is pumping on the rga through
VM2
 v75bgMd12.png 
  8970   Tue Aug 6 10:06:29 2013 SteveUpdateVACPumpdown is at 500Torr The pumpdown has started at 8:38am
Manasa was here to confirm good alignment
of the IFO
 befPd.png 
  8973   Tue Aug 6 16:45:31 2013 SteveUpdateVACPumpdown is completed IFO  P1=1mT PSL shutter is opened
 
 8hrPd76.png1mT.png 
  8976   Wed Aug 7 10:51:49 2013 SteveUpdateVACPumpdown at 26hrs Cold cathode gauge CC1 -h (horizontal)
just coming on 9.2e-5 Torr
P2 is the fore line pressure of the
 26hr.png14datm.png 
  8978   Wed Aug 7 15:36:29 2013 SteveUpdateVACTP2 drypump replaced 
 TP2's fore line - dry pump
replaced at performance level 600 mTorr after
 forelinesPs.jpg 
  8984   Thu Aug 8 07:57:23 2013 SteveUpdateVACpumpdown at 48 hrs

    

       
            
 48hrsPd76.png 
  8985   Thu Aug 8 10:31:28 2013 SteveUpdateVACfew reminders of this vent 1, Vacuum envelope grounds must be
connected all times!  After door removal
reconnect both cables immediately.
 GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg 
  9011   Wed Aug 14 08:24:20 2013 SteveUpdateVACpumpdown at day 8 
 
 pd76md8.png 
  9017   Fri Aug 16 09:35:18 2013 SteveUpdateVACVacuum Normal state recognition is back

    

       
            
 VacuumNormal.pngvacValvesDisabled.jpg 
  9029   Mon Aug 19 11:12:54 2013 SteveUpdateVACRGA scan at day 13 
 
 rgaScan13d.png 
  9084   Wed Aug 28 11:23:41 2013 SteveUpdateVACcrane repair sheduled

    

       
            
  
  9085   Wed Aug 28 15:41:42 2013 SteveUpdateVACRGA scan at day 23 Valve configuration: Vacuum Normal
pd76-m-d23
 
 pd75md23.png 
  9111   Thu Sep 5 10:47:58 2013 SteveUpdateVACvertex crane folding issue 
 [Fred Goldbar, Mike Gerfen,
Dennis Coyne and Steve]
 5mmLess.jpg 
  9115   Fri Sep 6 09:27:10 2013 SteveUpdateVAC31 days after pumpdown

    

       
            
 day31vac.png 
  9117   Mon Sep 9 15:33:06 2013 SteveUpdateVACvertex crane repair is scheduled

    

       
            
  
  9119   Tue Sep 10 09:18:22 2013 SteveUpdateVACdry pump is getting loud 
 TP3 foreline's dry pump is
getting noisier and noisier.  Turbo
  
  9120   Tue Sep 10 15:43:01 2013 SteveUpdateVACTP3' dry pump is replaced

    

       
            
  
  9129   Mon Sep 16 10:57:11 2013 SteveUpdateVACRGA scan at day 41

    

       
            
 pd76m41dRGA.pngpd76m41d.png 
  9139   Wed Sep 18 14:57:12 2013 SteveUpdateVACvertex crane folding arm removed The folding beam removed as shown.
Two man supporting it while I hammering it
out. Pin was dry and it gulled into supporting
 manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg 
  9146   Fri Sep 20 16:37:30 2013 SteveUpdateVACvertex crane folding arm is back on

    

       
            
 bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg 
  9173   Mon Sep 30 08:53:22 2013 SteveUpdateVACvertex crane repair schedule has changed

    

       
            
  
  9185   Wed Oct 2 14:25:39 2013 SteveUpdateVACvertex crane is still out of order 
The smoke alarms were turned off
and surrounding areas were covered with plastic.
 grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg 
  9223   Wed Oct 9 11:48:10 2013 SteveUpdateVACRGA scan at day 65 
 Valve configuration: Vacuum
Normal
 scanRGApd76m65d.pngpd76m65d.png 
  9359   Thu Nov 7 11:19:04 2013 SteveUpdateVACcrane work POSTPONED to Monday

    

       
            
  
  9372   Wed Nov 13 08:46:03 2013 SteveUpdateVACvertex crane repair completed

    

       
            
  