40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 339 of 357  Not logged in ELOG logo
ID Date Author Type Categorydown Subject Text Attachments
  1178   Fri Dec 5 01:58:58 2008 YoichiConfigurationASCtdscntr.pl now works at 40mTobin gave me the perl version of tdscntr
some time ago.
Pinkesh and I modified and tested it at LHO.
  
  1210   Thu Jan 1 00:55:39 2009 YoichiUpdateASCAlignment scripts for LinuxA Happy New Year.

The dither alignment scripts did not run
  
  1237   Mon Jan 19 13:58:53 2009 YoichiUpdateASCBetter ditherServo.plNick Smith (@LHO) tested the ditherServo.pl
at Hanford.
He added options to specify exit conditions
  
  1412   Fri Mar 20 12:07:19 2009 YoichiConfigurationASCETMY beam centeringI forgot to put this in the elog.
Last Sunday night, I centered the beam on
the ETMY because it was too low.
  
  1595   Sun May 17 21:45:40 2009 robUpdateASCITMX oplev centered    
  2105   Fri Oct 16 16:08:00 2009 robConfigurationASCloop opened on PZT2 YAW at 3:40 pmI pushed the "closed loop" button
on PZT2 YAW around 3:40 pm today, then roughly
recentered it using the DC Offset knob on
  
  2107   Fri Oct 16 18:46:36 2009 ranaConfigurationASCloop opened on PZT2 YAW at 3:40 pm

    
        
 Untitled.png 
  2109   Sun Oct 18 16:09:34 2009 ranaConfigurationASCloop opened on PZT2 YAW at 3:40 pm 
I wanted to see how long our IP POS
beam has been badly clipped - turns out its
 a.png 
  2205   Sun Nov 8 22:50:29 2009 AlbertoUpdateASCIFO AlignmentTonight I aligned the IFO by running the
scripts one by one.
SRC was far off and I had to align
  
  3191   Mon Jul 12 02:21:01 2010 KojiConfigurationASCResurrection of MC WFSI have resurrected the MC WFS on Friday
night.
I have uncommented the WFS part of
  
  4087   Wed Dec 22 15:30:47 2010 OsamuUpdateASCETMY oplev fixedAccording to c1scy.mdl, OL signals should
be connected to adc_0_24 to adc_0_27 but
they were connected to adc_0_16 to adc_0_19
  
  4280   Sun Feb 13 16:50:17 2011 kiwamuUpdateASCIP_ANG was at wrong ADCI found that  xmen.jpg 
  4287   Mon Feb 14 12:37:23 2011 kiwamuUpdateASCno signal from IP_ANG_Seg1It turns out there are no reasonable
signal from the segment 1 on the IP_ANG QPD.
  
  4294   Tue Feb 15 02:13:16 2011 kiwamuSummaryASCa daytime task : small signals on ETMX OLRana
and I found that the QPD for the optical
lever at X end are showing small signals.
  
  4295   Tue Feb 15 03:10:37 2011 kiwamuUpdateASCIR beam alignment for Xarm : TRX reductionI tried aligning the IR beam axis for
the X arm to have good beam centering on
ITMX and ETMX.
  
  4296   Tue Feb 15 06:15:07 2011 SureshUpdateASCno signal from IP_ANG_Seg1[Valery, kiwamu, Jenne, Suresh]
    I first interchanged
the two QPD's on the Y end table to see if
 Y-end_beam.JPG 
  4306   Wed Feb 16 02:04:11 2011 kiwamuUpdateASCIR beam alignment[Jenne and Kiwamu]
 This time we aligned the vertical
  
  4355   Fri Feb 25 01:48:54 2011 valeraUpdateASCmc auto alignment status I made several scripts to handle
the mcass configuration and sensing measurements:
- The scripts and data are in the 
 mcditherlines.pdfmcdecenter.pdfmcmirror.pdf 
  4673   Tue May 10 00:31:28 2011 kiwamuUpdateASCIFO alignment planThe alignment of the interferometer
goes basically step by step.
Tuesday will be an alignment day.
  
  4684   Wed May 11 00:23:21 2011 kiwamuUpdateASCY arm and beam pointing alignment[Jamie / Valera / Kiwamu]
 The incident
  
  4769   Mon May 30 23:14:27 2011 valeraUpdateASCY arm initial alignmentI closed all 8 dither loops for the Y arm
initial alignment: 2x2 centering servo (this
worked before) and 2x2 input beam servo for
  
  4883   Sat Jun 25 04:40:43 2011 SureshUpdateASCWFS1 Transimpedance measurementWFS1 Transimpedance
The
attached plots show the location of the ~29.5
MHz pole and the 59 MHz notch for each quadrant
 WFS1_transimpedance.pdfP6250224.JPGP6250223.JPG 
  5062   Fri Jul 29 16:25:06 2011 kiwamuUpdateASCbeam axis and Y arm alignedLast night
I aligned the incident beam axis and the
  
  5067   Sat Jul 30 06:24:06 2011 kiwamuUpdateASCY arm ASS fixedThe servos
of C1ASS for the Y arm and the beam axis
  
  5068   Sat Jul 30 07:07:28 2011 kiwamuUpdateASCMCASS statusSince
we will measure (and hopefully adjust) the
spot positions on the MC suspensions prior
  
  5073   Sat Jul 30 21:04:23 2011 kiwamuUpdateASCY arm ASS fixedThe
X arm ASS was also fixed. So both X and Y
arm ASS are now back to normal.
  
  5083   Mon Aug 1 17:47:37 2011 steveUpdateASCwhat is not workingSUS-ETMY_QPD is not responding. It is reading
zero in dataviewer and 4,400 counts on QPD
MEDM screen.......must be wrong cable connected
  
  5374   Sat Sep 10 01:36:15 2011 kiwamuUpdateASCinterferometer coarsely alignedThe
interferometer was coarsely aligned.
Now
  
  5518   Thu Sep 22 13:56:56 2011 kiwamuUpdateASCC1ASS : status updateThe output
matrix in the C1ASS servo were coarsely readjusted
  
  5543   Mon Sep 26 12:41:27 2011 kiwamuUpdateASCC1ASS : status update

    

       
            
  
  5574   Thu Sep 29 03:43:20 2011 kiwamuUpdateASCwrong channel assignment on IPPOSThe
channels for IPPOS had been assigned in a
wrong way.
  
  5578   Fri Sep 30 01:18:39 2011 kiwamuUpdateASCC1ASS : status updateNow
the C1ASS servos are working fine.
However
  
  5605   Mon Oct 3 17:57:12 2011 kiwamuUpdateASCIPPOS fixedThe
input matrix of IPPOS were fixed so that
the horizaontal motion correctly shows up
  
  5817   Sat Nov 5 00:04:23 2011 kiwamuUpdateASCASS scripts goneDid
somebody delete all the scripts in /opt/rtcds/caltech/c1/scripts/ASS
  
  5818   Sat Nov 5 00:24:13 2011 SureshUpdateASCASS scripts gone


   
        
            
  
  5821   Sat Nov 5 14:54:59 2011 KojiUpdateASCASS scripts goneIn any case, the daily backup of the scripts
are found in /cvs/cds/caltech/scripts_archive. 
  
  6288   Thu Feb 16 09:59:16 2012 steveUpdateASCIP- ANG Initial pointing or IP-ANG is a pointing
monitor of the MC. This beam is launched
after the second  pzt  steering
 lastIPang.png 
  6979   Tue Jul 17 02:17:50 2012 JenneUpdateASCASS gains wrong?I was checking on the ASS system, and I think
that the gains on some of the loops may not
be correct. An old symptom was that the commands
  
  7389   Fri Sep 14 18:15:43 2012 ranaUpdateASCFirst In Vac Picture 
 Looks good. Any way that you
can tell in an unambiguous way, where the
  
  7790   Wed Dec 5 03:25:32 2012 DenUpdateASCditheringI wanted to center beams on the XARM cavity
mirrors using c1ass model. I've run XARM
setup script and then turned dithering on.
  
  7979   Thu Jan 31 22:14:11 2013 ranaSummaryASCOptics lit Gouy not Guoy:
http://www.rp-photonics.com/gouy_phase_shift.html
pronounced Goo-eee, with the emphasis
  
  7982   Fri Feb 1 12:22:27 2013 ZachSummaryASCOptics litIt's OK; even Siegman got it wrong---48
times.
RA: NO, stil not OK.
  
  8459   Thu Apr 18 02:24:58 2013 DenUpdateASCdither alignment of yarmI modified our existing c1ass model to
include alignment of input steering TT1 and
TT2 for YARM and BS for XARM. Corresponding
 OL.pngdither_yarm.pngYARM_CTRL_DITHER.pdfTRY_DITHER.pdf 
  8465   Fri Apr 19 13:28:39 2013 DenUpdateASCdither alignment of yarmI've put 4 scripts into ASS directory for
YARM alignment. They should be called from
!Scripts YARM button on c1ass main medm screen.
  
  8467   Fri Apr 19 16:58:59 2013 JenneUpdateASCArm A2L measurement scripts 90% working againAfter Den's work with the ASS model this
week, all of the channel names were changed
(this wasn't pointed out in his elog....grrr),
  
  8562   Sat May 11 01:11:52 2013 KojiUpdateASCPRC mode stabilization with a shadow sensor at POPAh, AWESOME.
Indefinite PRMI lock was finally achieved.
 Screenshot.png130510_PRMI.pdf 
  8618   Wed May 22 17:29:34 2013 JenneUpdateASCQPD for POP ASC testedI fiddled around with the QPD that I'll
use to replace Koji's temporary razor blade
yaw sensor for detecting POP beam angular
  
  8649   Tue May 28 17:00:50 2013 JenneUpdateASCProposed POP path, to be installed this eveningI have mounted 2 2" G&H high reflective
mirrors, to be used in the new POP path. 
Manasa and Annalisa are doing green things
 CurrentPOPpath.pdfProposedPOPpath.pdf 
  8658   Thu May 30 17:18:58 2013 JenneUpdateASCNew POP pathI have placed the G&H mirrors and the
Y1 as pictured in my proposed layout in elog
  
  8663   Sat Jun 1 14:14:56 2013 JenneUpdateASCNew POP pathI have a lens solution for the new POP
QPD, plotted below.  To get the beam
size, I started with the waist at the ITM,
 POX_table_30May2013progress.pdfPOP_QPD_lensSolution.png 
ELOG V3.1.3-