  15469   Sat Jul 11 00:10:22 2020 gautamUpdateComputersrossa: more developmental workAfter some consultation with Erik von Reis
at LHO, this workstation is progressing towards
being usable
  
  15473   Mon Jul 13 11:33:18 2020 ranaUpdateComputersrossa: more developmental workI too, would prefer py3 for everything,
but aren't all the cdsutils / gaurdian
things still python2?
  
  15475   Mon Jul 13 12:37:05 2020 gautamUpdateComputersrossa: more developmental workIn fact, all these utilities are now available
in python3. There may be some bugs (e.g.
this),
  
  15460   Wed Jul 8 22:50:33 2020 gautamUpdateComputersrossa: more symlinksI wanted to try using rossa as my locking
workstation today. However, a few problems
became quickly evident. Basically, any of
  
  15451   Sun Jul 5 18:39:57 2020 ranaUpdateComputersrossa: printerI did

sudo usermod -a -G
  
  15455   Mon Jul 6 12:51:41 2020 gautamUpdateComputersrossa: resolvconf installedIndeed, this is now fixed by following
instructions from here.
I rebooted rossa at ~1250 PDT and confirmed
  
  13044   Mon Jun 5 21:53:55 2017 ranaUpdateComputersrossa: ubuntu 16.04With the network config, mounting, and
symlinks setup, rossa is able to be used
as a workstation for dataviewer and MEDM.
  
  6205   Tue Jan 17 03:10:27 2012 kiwamuConfigurationIOOrotated lambda/2 plate I have slightly rotated the lambda/2 plate,
which is used for attenuating the REFL beam's
power on the AS table
  
  7990   Mon Feb 4 10:45:51 2013 JamieSummaryGeneralrough analysis of aligned PRM-PR2 mode scanHere's a sort of rough analysis of the
aligned PRM-PR2 cavity mode scan.
On Friday we took some mode scan
 scan-labeled.pdf 
  7991   Mon Feb 4 11:10:59 2013 KojiSummaryGeneralrough analysis of aligned PRM-PR2 mode scanThe expected finesse is 100ish. How much
can we beleive the measured number of 50?
From the number we need to assume
  
  7994   Mon Feb 4 19:33:19 2013 yutaSummaryGeneralrough analysis of aligned PRM-PR2 mode scan[Jenne, Yuta]

We redid PRM-PR2 cavity scan because
 3peakdata.png 
  7997   Tue Feb 5 02:04:44 2013 yutaSummaryGeneralrough analysis of aligned PRM-PR2 mode scanI redid PRM-PR2 cavity scan using oscilloscope
to avoid anti-aliasing effect.
Measured 
 PRMPR2scan.png 
  7998   Tue Feb 5 03:16:51 2013 KojiSummaryGeneralrough analysis of aligned PRM-PR2 mode scan0.764 and 0.751 do not give us the stdev
of 0.005.
I have never seen any Yokogawa in
  
  8000   Tue Feb 5 10:09:08 2013 yutaSummaryGeneralrough analysis of aligned PRM-PR2 mode scanstdev of [0.764, 0.751] is 0.007, but what
we need is the error of the averaged number.
Statistical error of the averaged number
  
  8002   Tue Feb 5 11:30:19 2013 KojiSummaryGeneralrough analysis of aligned PRM-PR2 mode scanMakes sense. I mixed up n and n-1
Probability function: X = (x1 + x2
+ ... + xn)/n, where xi = xavg +/- dx
  
  8074   Wed Feb 13 01:26:08 2013 yutaSummaryGeneralrough analysis of aligned PRM-PR2 mode scanKoji was correct.

When you estimate the variance of
 unbiased.png 
  11857   Mon Dec 7 11:11:25 2015 yutaroSummaryLSCround trip loss of X armOn the day before yesterday and in this
morning, I measured loss map of ETMX. I reported
the method I used to change the beam spot
 image1-2.JPGsymmetry.png 
  11810   Wed Nov 25 16:40:32 2015 yutaroUpdateLSCround trip loss of Y armI measured round trip loss of Y arm. The
alignment of relevant mirrors was set ideal
with dithering (no offset).
  
  11816   Wed Nov 25 23:34:52 2015 yutaroUpdateLSCround trip loss of Y arm[yutaro, Koji]

Due to the strange behavior (elog
 14.png 
  11818   Fri Nov 27 03:38:23 2015 yutaroSummaryLSCround trip loss of Y armTonight I measured "loss map"
of ETMY. The method to calculate round trip
loss is same as written in elog
 image1.png 
  11819   Fri Nov 27 22:20:24 2015 yutaroUpdateLSCround trip loss of Y armHere, I upload data I took last night,
including the power of reflected power (locked/misaligned)
and transmitted power for each point (attachement
 log.txt.zip17.png 
  375   Thu Mar 13 12:11:58 2008 aivanovUpdateComputer Scripts / Programsrouting PEM -> ASS -> SUS_MCL
on ASS RFM 1 has PEM signals at
  
  380   Fri Mar 14 15:06:24 2008 robUpdateComputer Scripts / Programsrouting PEM -> ASS -> SUS_MCL[quote]
on ASS RFM 1 has PEM signals at
  
  11161   Mon Mar 23 19:30:36 2015 ranaUpdateComputer Scripts / Programsrsync frames to LDAS clusterThe rsync job to sync our frames over to
the cluster has been on a 20 MB/s BW limit
for awhile now.
  
  11288   Wed May 13 09:17:28 2015 ranaUpdateComputer Scripts / Programsrsync frames to LDAS clusterStill seems to be running without causing
FB issues. One thought is that we could look
through the FB status channel trends and
  
  11299   Mon May 18 14:22:05 2015 ericqUpdateComputer Scripts / Programsrsync frames to LDAS cluster


  
  4247   Thu Feb 3 17:25:03 2011 josephbUpdateComputersrsync script was not really backing up /cvs/cdsSo today,
after an "rm" error while working
with the autoburt.pl script and burt restores
  
  6807   Tue Jun 12 17:46:09 2012 JenneUpdateComputersrtcds: command found

    

       
            
  
  6796   Tue Jun 12 00:15:51 2012 JenneUpdateComputersrtcds: command not foundWe can't compile any changes to the LSC
or the GCV models since Jamie's new script
/ program isn't found.  I don't know
  
  6801   Tue Jun 12 11:25:05 2012 JamieUpdateComputersrtcds: command not found

    

       
            
  
  6270   Fri Feb 10 15:46:59 2012 steveUpdateSUSruby wire standoffFinally I found a company who can do Koji's
improved  -hard to make-  specification
on ruby or sapphire wire standoff.
  
  13039   Mon Jun 5 10:30:45 2017 SteveUpdateSUSruby wire standoff picturesAtm 1 & 5, showing the ruby R ~10 mm
as it is seated on Al SOS test mass

Atm. 2, 3 & 4  chipped
 A087_R.png.bmpA097_chipped_edges.png.bmpA099_cal_wire.png.bmpA101_cal_wire_43_micron.png.bmpAl_SOS_R39mm.jpg 
  13123   Mon Jul 17 16:22:01 2017 SteveUpdateSUSruby wire standoff picturesBluebean Optical Tech Limited of Shanghai
delivered 50 pieces red ruby
prisms
 contacting_ridge.bmpcontacting_ridge.png 
  12117   Sun May 15 19:48:08 2016 SteveUpdateVACrun out of N23-4 hrs ago we run out of nitrogen. We
are back to Vacuum Normal

 
 noN2.png 
  13903   Thu May 31 15:48:16 2018 KiraUpdatePEMrunning PID script with seismometerI have attached the result of running the
PID script on the seismometer with the can
on. The daily fluctuations are no more than
 can-on-pid.png 
  280   Mon Jan 28 15:11:38 2008 robHowToDMFrunning compiled matlab DMF tools
I compiled Rana's seisBLRMS monitor, and
it's now running on mafalda.  To start your
  
  13978   Mon Jun 18 10:34:45 2018 johannesUpdateComputer Scripts / Programsrunning comsol job on optimusI'm running a comsol job on optimus
in a tmux session named cryocavs. Should
be done in less than 24 hours, judging by
  
  11410   Tue Jul 14 13:55:28 2015 jamieUpdateCDSrunning test on daqd, please leave undisturbedI'm running a test with daqd right
now, so please do not disturb for the moment.

I'm
temporarily writing frames into a tempfs,
  
  11413   Tue Jul 14 17:06:00 2015 jamieUpdateCDSrunning test on daqd, please leave undisturbedI have reverted daqd to the previous configuration,
so that it's writing frames to disk. 
It's still showing instability.
  
  6201   Sun Jan 15 12:18:00 2012 DenUpdateAdaptive Filteringrunning time In order to figure out what downsampling
ratio we can take, we need to determine the
running time of the fxlms_filter() function.
  
  12608   Wed Nov 9 11:40:44 2016 ericqUpdateCDSsafe.snap BURT files now in svnThis is long overdue, but our burt files
for SDF now live in the LIGO userapps SVN,
as they should.
  
  2647   Mon Mar 1 08:49:37 2010 steveBureaucracySAFETYsafety auditThe 40m safety audit will be at Wednesday
afternoon, March 3
Please participate getting our lab
  
  6329   Tue Feb 28 11:20:51 2012 steveUpdateSAFETYsafety audit 2012Correction list by visiting safety committee,
Haick Issaian is not shown:
1,  update laser, crane operator
 safety12.JPG 
  6470   Fri Mar 30 09:37:13 2012 steveUpdateSAFETYsafety audit 2012 CORRECTIONS

    

       
            
  
  8240   Wed Mar 6 11:33:09 2013 steveUpdateSAFETYsafety audit 2013 
         
           
 IMG_0010.JPG 
  9672   Tue Feb 25 16:54:57 2014 steveUpdatesafetysafety audit 2014 
 We had our annual safety inspection
today.  
  
  9725   Thu Mar 13 16:05:48 2014 steveUpdatesafetysafety audit 2014

    

       
            
 T1400198-v1-CIT-LIGO_Labs_Annual_Safety_Audit_2014.pdf 
  9870   Mon Apr 28 17:27:29 2014 steveUpdatesafetysafety audit 2014

    

       
            
  
  9873   Tue Apr 29 00:11:03 2014 steveUpdatesafetysafety audit 2014Be aware that
this may affect POP QPD and POP RF Thorlabs
  
  9900   Fri May 2 08:15:54 2014 steveUpdatesafetysafety audit 2014 
 Late adition: CHECK all viewport covers.
 solidCoverRequired.jpg 