14494
|
Thu Mar 21 21:50:31 2019 |
rana | Update | VAC | Protection against AC power loss | agreed - we need all pumps on UPS for their safety and also so that we can spin them down safely. Can you and Chub please find a suitable UPS?
Quote: |
However, I discovered that TP1---the pump that might be most damaged by a sudden power failure---is not on the UPS. It's plugged directly into a 240V outlet along the wall. This is because the current UPS doesn't have any 240V sockets. I'd recommend we get one that can handle all the turbo pumps.
|
|
14509
|
Tue Apr 2 18:40:01 2019 |
gautam | Update | VAC | Vac failure | While glancing at my Vacuum striptool, I noticed that the IFO pressure is 2e-4 torr. There was an "AC power loss" reported by C1Vac about 4 hours (14:07 local time) ago. We are investigating. I closed the PSL shutter.
Jon and I investigated at the vacuum rack. The UPS was reporting a normal status ("On Line"). Everything looked normal so we attempted to bring the system back to the nominal state. But TP2 drypump was making a loud rattling noise, and the TP2 foreline pressure was not coming down at a normal rate. We wonder if the TP2 drypump has somehow been damaged - we leave it for Chub to investigate and give a more professional assessment of the situation and what the appropriate course of action is.
The PSL shutter will remain closed overning, and the main volume and annuli are valved off. We spun up TP1 and TP3 and decided to leave them on (but they have negligible load). |
Attachment 1: vacFail.png
|
|
14511
|
Wed Apr 3 09:07:46 2019 |
gautam | Update | VAC | Vac failure | Overnight pressure trends don't suggest anything went awry after the initial interlock trip. Some watchdog script that monitors vacuum pressure and closes the PSL shutter in the event of pressure exceeding some threshold needs to be implemented. Another pending task is to make sure that backup disk for c1vac actually is bootable and is a plug-and-play replacement. |
Attachment 1: vacFailOvernight.png
|
|
14512
|
Wed Apr 3 10:42:36 2019 |
gautam | Update | VAC | TP2 forepump replaced | Bob and Chub concluded that the drypump that serves as TP2's forepump had failed. Steve had told me the whereabouts of a spare Agilent IDP-7. This was meant to be a replacement for the TP3 foreline pump when it failed, but we decided to swap it in while diagnosing the failed drypump (which had 2182 hours continuous running according to the hour counter). Sure enough, the spare pump spun up and the TP2fl pressure dropped at a rate consistent with what is expected. I was then able to spin up TP1, TP2 and TP3.
However, when opening V4 (the foreline of TP1 pumped by TP2), I heard a loud repeated click track (~5Hz) from the electronics rack. Shortly after, the interlocks shut down all the TPs again, citing "AC power loss". Something is not right, I leave it to Jon and Chub to investigate. |
14514
|
Wed Apr 3 16:17:17 2019 |
Jon | Update | VAC | TP2 forepump replaced | I can't explain the mechanical switching sound Gautam reported. The relay controlling power to the TP2 forepump is housed in the main AC relay box under the arm tube, not in the Acromag chassis, so it can't be from that. I've cycled through the pumpdown sequence several times and can't reproduce the effect. The Acromag switches for TP2 still work fine.
In any case, I've made modifications to the vacuum interlocks that will help with two of the issues:
- For the "AC power loss" over-triggering: New logic added requiring the UPS to be out of the "on line power, battery OK" state for ~5 seconds before tripping the interlock. This will prevent electrical transients from triggering an emergency shutdown, as seems to be the case here (the UPS briefly isolates the load to battery during such events).
- PSL interlocking: New logic added which directly sets
C1:AUX-PSL_ShutterRqst --> 0 (closes the PSL shutter) when the main volume pressure is 3 mtorr-500 torr. Previously there was a channel exposed for this interlock (C1:Vac-interlock_high_voltage ), but c1aux was not actually monitoring it. Following the convention of every vac interlock, after the PSL shutter has been closed, it has to be manually reopened. Once the pressure is out of this range, the vac system will stop blocking the shutter from reopening, but it will not perform the reopen action itself. gautam: a separate interlock logic needs to be implemented on c1aux (the shutter machine) that only permits the shutter to be opened if the Vac pressure range is okay. The SUS watchdog style AND logic in the EPICS database file should work just fine.
After finishing this vac work, I began a new pumpdown at ~4:30pm. The pressure fell quickly and has already reached ~1e-5 torr. TP2 current and temp look fine.
Quote: |
However, when opening V4 (the foreline of TP1 pumped by TP2), I heard a loud repeated click track (~5Hz) from the electronics rack. Shortly after, the interlocks shut down all the TPs again, citing "AC power loss". Something is not right, I leave it to Jon and Chub to investigate.
|
|
Attachment 1: IMG_3180.jpg
|
|
14515
|
Wed Apr 3 18:35:54 2019 |
gautam | Update | VAC | PSL shutter re-opened | PSL shutter was re-opened at 6pm local time. IMC was locked. As of 10pm, the main volume pressure is already back down to the 8e-6 level. |
14517
|
Fri Apr 5 01:10:18 2019 |
gautam | Update | VAC | TP3 forepump is also noisy | Is this one close to failure as well? |
14546
|
Tue Apr 16 22:06:51 2019 |
gautam | Update | VAC | Vac interlock tripped again | This happened again, about 30,000 seconds (~2:06pm local time according to the logfile) ago. The cited error was the same -
2019-04-16 14:06:05,538 - C1:Vac-error_status => VA6 closed. AC power loss.
Hard to believe there was any real power loss, nothing else in the lab seems to have been affected so I am inclined to suspect a buggy UPS communication channel. The PSL shutter was not closed - I believe the condition is for P1a to exceed 3 mtorr (it is at 1 mtorr right now), but perhaps this should be modified to close the PSL shutter in the event of any interlock tripping. Also, probably not a bad idea to send an email alert to the lab mailing list in the event of a vac interlock failure.
For tonight, I only plan to work with the EX ALS system anyways so I'm closing the PSL shutter, I'll work with Chub to restore the vacuum if he deems it okay tomorrow. |
Attachment 1: Screenshot_from_2019-04-16_22-05-47.png
|
|
Attachment 2: Screenshot_from_2019-04-16_22-06-02.png
|
|
14550
|
Wed Apr 17 18:12:06 2019 |
gautam | Update | VAC | Vac interlock tripped again | After getting the go ahead from Chub and Jon, I restored the Vacuum state to "Vacuum normal", see Attachment #1. Steps:
- Interlock code modifications
- Backed up /opt/target/python/interlocks/interlock_conditions.yaml to /opt/target/python/interlocks/interlock_conditions_UPS.yaml
- The "power_loss" condition was removed for every valve and pump inside /opt/target/python/interlocks/interlock_conditions.yaml
- The interlock service was restarted using sudo systemctl restart interlock.service
- Looking at the status of the service, I saw that it was dying ~ every 1 second.
- Traced this down to a problem in/opt/target/python/interlocks/interlock_conditions.yaml when the "pump_managers" are initialized - the way this is coded up, doesn't play nice if there are no conditions specified in the yaml file. For now, I just commented this part out. The git diff below:
- Restoring vacuum normal:
- Spun up TP1, TP2 and TP3
- Opened up foreline of TP1 to TP2, and then opened main volume to TP1
- Opened up annulus foreline to TP3, and then opened the individual annular volumes to TP3.
controls@c1vac:/opt/target/python/interlocks$ git diff interlock.py
diff --git a/python/interlocks/interlock.py b/python/interlocks/interlock.py
index 28d3366..46a39fc 100755
--- a/python/interlocks/interlock.py
+++ b/python/interlocks/interlock.py
@@ -52,8 +52,8 @@ class Interlock(object):
self.pumps = []
for pump in interlocks['pumps']:
pm = PumpManager(pump['name'])
- for condition in pump['conditions']:
- pm.register_condition(*condition)
+ #for condition in pump['conditions']:
+ # pm.register_condition(*condition)
self.pumps.append(pm)
So far the pressure is coming down smoothly, see Attachment #2. I'll keep an eye on it.
PSL shutter was opened at 645pm local time. IMC locked almost immediately.
Update 11pm: The pressure has reached 8.5e-6 torr without hiccup. |
Attachment 1: Screenshot_from_2019-04-17_18-11-45.png
|
|
Attachment 2: Screenshot_from_2019-04-17_18-21-30.png
|
|
14574
|
Thu Apr 25 10:32:39 2019 |
Jon | Update | VAC | Vac interlocks updated | I slightly cleaned up Gautam's disabling of the UPS-predicated vac interlock and restarted the interlock service. This interlock is intended to protect the turbo pumps after a power outage, but it has proven disruptive to normal operations with too many false triggers. It will be reenabled once a new UPS has been installed. For now, as it has been since 2001, the vac pumps are unprotected against an extended power outage. |
14575
|
Thu Apr 25 11:27:11 2019 |
gautam | Update | VAC | PSL shutter re-opened | This activity seems to have closed the PSL shutter (actually I'm not sure why that happened - the interlock should only trip if P1a exceeds 3 mtorr, and looking at the time series for the last 2 hours, it did not ever exceed this threshold). I saw no reason for it to remain closed so I re-opened it just now.
I vote for not remotely rebooting any of the vacuum / PSL subsystems. In the event of something going catastrophically wrong, someone should be on hand to take action in the lab. |
14631
|
Wed May 22 22:50:13 2019 |
gautam | Update | VAC | Pumpdown prep | I did the following:
- Checked the ETMY OSEM sensing matrix and OSEM actuation matrix - more on this later, but everything seems much more reasonable than it was prior to this vent.
- Checked that the IMC could be locked with the low-power beam
- Aligned the Y-arm cavity using the green beam. Then tweaked the TT1/TT2 alignment until I saw IR flashes in TRY.
- Repeated #2 for the X arm, using the BS to control the beam pointing.
- Confirmed that the AS beam makes it out of the vacuum. It is only ~30uW in a large (~1cm dia) beam, so not the clearest spot on an IR card, but looks pretty clean, no evidence of clipping. I removed an ND filter on the AS port camera in order to better see the beam on the CRT monitor, this should be re-installed prior to ramping the input power to the IMC again.
- With the PRM aligned, I confirmed that I could see resonant flashes in the POP QPD.
- With the SRM aligned, I confirmed that I could see SRC cavity flashes on the AS camera.
I think this completes the pre-pumpdown alignment checks we usually do. The detailed plan for tomorrow is here: please have a look and lmk if I missed something. |
14634
|
Thu May 23 15:30:56 2019 |
gautam | Update | VAC | Pumpdown underway - so far so good! | [chub, koji, gautam]
- We executed the pre-pumpdown tasks per the checklist - heavy doors were on by ~1030am.
- We were thwarted by the display of c1vac becoming unresponsive - the mouse cursor moves, but we could not interact with any screens. Connecting to c1vac by ssh with the -X option, we could interact with everything. Using top, we saw that the load average was reporting ~8 - this is pretty high! The most demanding processes were the modbus IOC and some python processes, presumably connected with the interlocks. We tried stopping the interlock systemctl process, kill -9ing the heavy processes, but to no avail. Next, we tried killing the X display proces, but this also did not fix the problem. Finally, we did a soft reboot of c1vac - the machine came back up, but still no interactivity. So we moved asia, the EY laptop, to the vacuum station for this pumpdown. We will fix the situation once the vacuum is in the nominal state.
- The actual pumpdown commenced by first evacuating the EY and IY annular volumes with the roughing pump. There is an interlock condition that prevents V6 from being opened if the PRP gauge reports < 0.25 torr (this is to protect against oil backstreaming from the roughing pumps I believe). To get around this, we gave the roughing pumps some work by exposing the annular line to the atmospheric pressure of the EY and IY annuli. In a few minutes, both of these reported < 1 torr.
- Main volume pumping started around noon - we have been going down in pressure steadily at ~3 torr/min (Koji has a nice python utility made that calculates the rate from the pressure channel).
- At the time of writing, after ~3.5 hrs of pumping, we are at 25 torr. I will keep going till ~1 torr, and then valve off the main volume until tomorrow, when Chub and I will work on getting the turbo pumps exposed to the main volume. Pausing at 355pm while I go for the colloquium. Resumed later in the evening, stopping for today at 500 mtorr.
- In preparation for the increased load on TP2 and TP3, I spun them up to the "high RPM mode" from their nominal "Standby mode".
Close up photos of the EY and IY chambers may be found here.
Update on the display manager of c1vac: I was able to get it working again by running sudo systemctl restart display-manager. Now I can interact with the MEDM screens on c1vac. It is a bit annoying that this machine doesn't have the users directory so I don't have access to the many convenient StripTool templates though - maybe I'll make local copies tomorrow for the pumpdown. |
Attachment 1: pumpdownPres.png
|
|
14636
|
Fri May 24 11:47:15 2019 |
gautam | Update | VAC | IFO is almost at nominal vacuum | [chub, gautam]
Overnight, the pressure of the main volume only rose by 10 mtorr, so there was no need to run the roughing pumps again. So we went straight to the turbos - hooked up the AUX drypump and set it up to back TP2. Initially, we tried having both TP2 and TP3 act as backing pumps for TP1, but the wimpy TP3 current was always passing the interlock threshold. So we decided to pump down with TP3 valved off, only TP2 backing TP1. This went smooth - we had to keep an eye on P2, to make sure it stayed below 1 torr. It took ~ 1 hour to go from 500 mtorr to 100 mtorr, but after that, I could almost immediately open up RV2 completely. A safe setting to run at seems to be to have RV2 open by between 0.5 and 1 turn (out of the full range of 7 turns) until the pressure drops to ~100 mtorr. Then we can crank it open. We are, at the time of writing, at ~8e-5 torr and the pressure is coming down steadily.
I had to manually clear the IG error on the CC1 gauge, and re-enabled the High Voltage, so that we have a readback of the main volume pressure in that range. I made a script to do this (enable the HV, the IG error still has to be cleared by pushing the appropriate buttons on the Hornet), it lives at /opt/target/python/serial/turnHornetON.py. I guess it'll take a few days to hit 8e-6 torr, but I don't see any reason to not leave the turbos running over the weekend.
Remaining tasks are (i) disconnect the roughing pump line and (ii) pump down the annuli, which will be done later today. Both were done at ~2pm, now we are in the vacuum normal config. I'll turn the two small turbos to run on "Standby Mode" before I head home today. I think TP3 may be close to end-of-life - the TP3 current went up to 1A even while evacuating the small volume of the annular line (which was already at 1 torr) with the AUX drypump backing it. The interlock condition is set to trip at 1.2A, and this pump is nominally supposed to be able to back TP1 during the pumpdown of the main volume from 500 mtorr, which it wasn't able to do.
|
Attachment 1: pumpdown_20190524.png
|
|
14640
|
Mon May 27 11:37:13 2019 |
gautam | Update | VAC | c1vac is unresponsive | I've been monitoring the status of the pumpdown remotely with ndscope lookbacks of C1:Vac-CC1_pressure. Today morning, I saw that the channel was putting out a constant value (signature of EPICS server being frozen). caget did not work either. Then I tried ssh-ing into c1vac to see if there were any issues but I was unable to. The machine isn't responding to ping either. The EPICS value has been frozen since ~1030pm PDT 26 May 2019.
I will try and head to campus later today to check on it. Isn't an email alert or soemthing supposed to be sent out in such an event? |
14641
|
Tue May 28 09:51:33 2019 |
gautam | Update | VAC | c1vac hard-rebooted | The vacuum itself was fine - CC1 gauge reported a pressure of 1.3e-5 torr. Note to self: the C1:Vac-CC1_HORNET_PRESSURE channel, which is the analog readback of the Hornet gauge and which is hooked up to an Acromag ADC in the c1auxex chassis, is independent of the status of the c1vac machine, and so can serve as a diagnostic.
However, I was unable to interact with c1vac in any way, the monitor hooked up directly to it was showing a frozen display. So I hard-rebooted the system. It took a few minutes to come back online - but even after 10 minutes of waiting, still no display. In the process of the reboot, several valves were closed off - when the EPICS processes restart, there are momentary instances where the readback channels get an "undefined" value, which prompts the main interlock process to transition to a "SAFE" state.
Running df -h, I saw that the /var partition was completely full. Maybe this was somehow interfering with the machine running smoothly? Two files in particular, daemon.log and daemon.log.1 were ~1GB each. The contents of these files seemed to be just the readbacks for the caget and caput commands. So I cleared both these files, and now the /var partition usage is only 26%. I also got the display back up and running on the physical monitor hooked up to the c1vac machine's VGA port. Let's see if this has improved the stability situation. The CPU load is still high (~6-7), with most of this coming from the modbus process. Why is this so high? c1susaux has more Acromag units but claims a much lower load of 0.71. Is the CPU of the c1vac machine somehow inferior?
In the meantime, I ssh-ed into c1vac and restored the "Vacuum normal" valve config. During this little escapade, the main volume pressure rose to ~6e-5 torr. It's coming back down smoothly.
Unrelated to this work: we had turned the RGA off for the vent, I powered it back on and re-initialized it this morning. |
Attachment 1: Screen_Shot_2019-05-31_at_12.44.54_PM.png
|
|
15140
|
Wed Jan 22 16:19:47 2020 |
Jon | Update | VAC | TP3 controller errors | Gautam and I debugged a communications problem with TP3 that was causing its python service to fail. We traced the problem back to the querying of the pump controller for its operational parameters (speed, voltage, temp). Some small percentage of the time (~5%, indeterministically), the pump controller is returning an invalid response which causes the service to shut itself down and signal a NO COMM error.
As a temporary fix, I wrapped the failing query in an exception handler to continue past this particular error. However, we suspect the microprocessor in the TP3 controller may be beginning to fail. There is a spare controller sitting right next to it in the vacuum rack. We will ask Chub to install the replacement in the near future.
gautam: this pump is responsible for pumping the annular volume under normal operations. while this problem is being resolved, the annular volume is valved off (as it has been since July 2019 anyway which is when this problem first manifested). |
15279
|
Wed Mar 18 21:43:26 2020 |
gautam | Update | VAC | Main vol pressure jump | There was a jump in the main volume pressure at ~6pm PDT yesterday. The cause is unknown, but the pressure doesn't seem to be coming back down (but also isn't increasing alarmingly).
I wanted to look at the RGA scans to see if there were any clues as to what changed, but looks like the daily RGA scans stopped updating on Dec 24 2019. The c0rga machine responsible for running these scans doesn't respond to ssh. Not much to be done until the lockdown is over i guess... |
Attachment 1: VacPresJump.png
|
|
15280
|
Wed Mar 18 22:10:41 2020 |
Koji | Update | VAC | Main vol pressure jump | I was in the lab at the time. But did not notice anything (like turbo sound etc). I was around ETMX/Y (1X9, 1Y4) rack and SUS rack (1X4/5), but did not go into the Vac region. |
15283
|
Wed Mar 25 15:15:55 2020 |
gautam | Update | VAC | Vacuum interlock code, N2 warning update | The email address in the N2 checking script wasn't right - I now updated it to email the 40m list if the sum of reserve tank pressures fall below 800 PSI. The checker itself is only run every 3 hours (via cron on c1vac).
Quote: |
I reset the remote of this git repo to the 40m version instead of Jon's personal one, to ensure consistency between what's on the vacuum machine and in the git repo. There is now a N2 checker python mailer that will email the 40m list if all the tank pressures are below 600 PSI (>12 hours left for someone to react before the main N2 line pressure drops and the interlocks kick in). For now, the script just runs as a cron job every 3 hours, but perhaps we should integrate it with the interlock process
|
|
15304
|
Wed Apr 15 15:15:17 2020 |
Chub | Update | VAC | nitrogen cylinders delivered | Four nitrogen cylinders replaced the empties in the rack at the west entrance. Additionally, Airgas will now deliver only once a week. Let me know via email or text when the there are four empties in the rack and I'll order the next round. |
15314
|
Thu Apr 30 07:29:01 2020 |
Chub | Update | VAC | N2 delivered. | Hi All,
The new nitrogen cylinders were delivered to the rack at the west entrance. We only get one Airgas delivery per week during the stay-at-home order, but so far they've not let us down. |
15391
|
Thu Jun 11 11:48:43 2020 |
gautam | Update | VAC | Vac failure | There appears to have been some sort of vacuum failure.
ldas-pcdev1 was down, so the summary pages weren't being generated. I have now switched over to ldas-pcdev6. I suspect some forepump failure, will check up later today unless someone else wants to take care of this.
There was no interlock action, and I don't check the vacuum status every half hour, so there was a period of time last night there was high circulating power in the arm cavities when the main volume pressure was higher than nominal. I have now closed the PSL shutter until the issue is resolved. |
Attachment 1: vacFailure.png
|
|
15392
|
Thu Jun 11 16:14:03 2020 |
gautam | Update | VAC | Vac failure - probable cause is serial comm glitch | Summary:
It looks like the main vacuum interlock was tripped due to a serial communication error from the TP2 controller. With Rana/Koji's permission, I will open V1 and expose the main volume to TP1 again (#2 in last section).
Details:
- The vacuum interlock log file at /opt/target/vac.log on c1vac suggests that the interlock was tripped because "TP2 is too warm".
- Looking back at the diagnostics channels, it looks like the TP2 temperature channel registered a rise in temperature of >30 C in <0.2 seconds, see Attachment #1 - seems highly unlikely, probably some kind of glitch in the serial communication? This particular pump is relatively new from Agilent (<2 years installed I think)
- The PSL shutter was automatically closed at ~1150 am today, see Attachment #2. There is some EPICS logic on c1psl (Acromag server) that checks if C1:Vac-P1a_pressure is greater than 3 mTorr (or greater than 500 Torr for in-air locking of the IMC), in which case it closes the shutter, so this seems consistent with expectations.
Recommended course of action:
- Code in some averaging in the interlock code, so that the interlock isn't triggered on some unphysical glitch like this. As shown in Attachment #3, this has been happening for the past 24 hours (though not before, because the interlock wasn't tripped). Probably need the derivative of the temperature as well, and the derivative should be less than 5 C/s or something physical (in addition to the temperature being high) for the interlock to trip.
- Re-open V1 to pump down the main volume to nominal pressure so that the interferometer locking activity can resume.
- One option in the interim is to bypass the TP2 temperature interlock condition.
- The pressure-based interlocks are probably sufficient to protect the main volume / pumps during the nominal operations - the temperature interlocks are mainly useful during the pumpdown where the TPs have a large load, and so we want to avoid over-stressing them.
|
Attachment 1: TP2_tempGlitch.png
|
|
Attachment 2: PSL_shutterClosed.png
|
|
Attachment 3: TP2tempGlitches.pdf
|
|
15393
|
Thu Jun 11 17:35:34 2020 |
gautam | Update | VAC | Pumpspool UPS needs battery replacement | Summary:
The pumpspool UPS has its "Replace Battery" indicator light on. Might be a good chance to change the UPS, but at the very least, we should put in fresh batteries (last replacement was in Aug 2017).
I'll say this again - the pumpspool area is noisier than I remember it being, I think one / both of the roughing pumps backing TP2 / TP3 need tip-seal replacements.
BTW, EX is 5C hotter than EY, by virtue of the tarnac outside? In fact, judging by Steve's thermometers, EX reports a 12C swing in 24 hours between 30 C and 18 C (so almost no temperature control) while EY reports a 5C swing between 20 and 25 C. This is borne out by the ETM Oplev data I think... |
15394
|
Fri Jun 12 01:23:32 2020 |
Koji | Update | VAC | Pumpspool UPS needs battery replacement | 1. I agree that it's likely that it was the temp signal glitch.
Recom #2: I approve to reopen the valves to pump down the main volume. As long as there is no frequent glitch, we can just bring the vacuum back to normal with the current software setup.
2. Recom #1 is also reasonable. You can use simple logic like if we register 10 consecutive samples that exceed the threshold, we can activate the interlock. I feel we should still keep the temp interlock. Switching between pumping mode and the normal operation may cause unexpected omission of the interlocks when it is necessary.
3. We should purchase the UPS battery / replacement rotary TIP seal. Once they are in hand, we can stop the vacuum and execute the replacement. Can one person (who?) accomplish everything with some remote help?
4. The lab temp: you mean, 12degC swing with the AC on!?
|
15396
|
Fri Jun 12 17:32:40 2020 |
Koji | Update | VAC | Pumpspool UPS needs battery replacement | Jon and Koji remotely supported Jordan's resetting the TP2 controller.
Here is the instruction by Jon
From the operator's console in front of the vac rack:
- Open a terminal window (click the LXTerminal icon on the desktop)
- Type "control" + enter to open the vac controls screen
- Toggle all the open valves closed (edit by KA: and manually close RV2 by rotating the gate valve handle )
- Turn OFF TP2 by clicking the "Off' button. Make sure the status changes and the rotation speed falls to zero (you'll also hear the pump spinning down)
- The other pumps (TP1, TP3) can be left running
- Once TP2 has stopped spinning, go to the back of the rack and locate the ethernet cable running from the back of the TP2 controller to the IOLAN server (near the top of the rack). Disconnect and reconnect the cable at each end, verifying it is firmly locked in place.
- From the front of the rack, power down the TP2 controller (I don't quite remember for the Agilent, but you might have to move the slider on the front from "Remote" to "Local" first)
- Wait about 30 seconds, then power it back on. If you had to move the slider to shut it down, revert it back to the "Remote" position.
- Go back to the controls screen on the console. If the pump came back up and is communicating serially again, its status will say something other than "NO COMM"
- Turn TP2 back on. Verify that it spins up to its nominal speed (66 kRPM)
- At this point you can reopen any valves you initially closed (any that were already closed before, leave closed)
TP2 was stopped and at this moment the glitches were gone. Jordan powercycled the TP2 controller and we brought up the TP2 back at the full speed.
However, the glitches came back as before. Obviously we can't go on from here, and we've decided to stop the recovery process here today.
- We left TP1/2/3 running while the valves including RV2 were closed.
- When Jordan is back in the lab next week, we'll try to use TP3 as the backing of TP1 so that we can resume the main volume pumping.
- Currently, TP3 does not have interlocking and that is a risk. Jon is going to implement it.
- Meanwhile, we will try to replace the controller of TP2. We are supposed to have this in the lab. Ask Chub about the location.
- Once we confirm the stability of the diagnostic signals for TP2, we will come back to the nominal pumping scheme. |
Attachment 1: Screen_Shot_2020-06-12_at_17.22.23.png
|
|
15397
|
Fri Jun 12 19:02:52 2020 |
gautam | Update | VAC | Pumpspool UPS needs battery replacement | I still don't understand why restoring the vacuum is contingent on this functionality working. All the TPs have their own internal logic to shutdown the pump if some damage threshold is exceeded. Plus, we have the pressure-sensor based interlocks to protect the main volume as well as pumps. While the extra redundancy from the readbacks from the controller is useful, clearly it isn't the first line of defense?
The main volume pressure is currently ~10mTorr. If we pump down before this reaches 500mTorr, the procedure is pretty straightforward. Otherwise, we have to do the dance with the manual throttling valve (judging by current rate of increase, unlikely to exceed this over the weekend, but I lose IFO time).
Obviously I don't want to rush this and have some permanent damage, so I'll stay out of this unless otherwise instructed. |
15398
|
Fri Jun 12 19:23:56 2020 |
Koji | Update | VAC | Pumpspool UPS needs battery replacement | The vacuum safety policy and design are not clear to me, and I don't know what the first and second defense is. Since we had limited time and bandwidth during the remotely-supported recovery work today, we wanted to work step by step.
The pressure rising rate is 20mtorr/day, and turning on TP3 early next week will resume the main-volume pumping without too much hustle. If you need the IFO time now, contact with Jon and use backing with TP3. |
15399
|
Fri Jun 12 19:33:31 2020 |
gautam | Update | VAC | Pumpspool UPS needs battery replacement | Didn't mean to sound whiny. I will wait until the vacuum team tells me it is okay.
Quote: |
The vacuum safety policy and design are not clear to me, and I don't know what the first and second defense is. Since we had limited time and bandwidth during the remotely-supported recovery work today, we wanted to work step by step.
The pressure rising rate is 20mtorr/day, and turning on TP3 early next week will resume the main-volume pumping without too much hustle. If you need the IFO time now, contact with Jon and use backing with TP3.
|
|
15402
|
Tue Jun 16 13:35:03 2020 |
Jon | Update | VAC | Temporary vac fix / IFO usable again | [Jon, Jordan, Koji]
Today Jordan reconfigured the vac system to allow pumping of the main volume resume, with Jon and Koji remotely advising. All clear to resume normal IFO activities. However, the vac system is operating in a temporary configuration that will have to be reverted as we locate replacement components. Details below.
Procedure
Since serial readback of the TP2 controller seems to be failing, we reconfigured the system with TP3 now backing for TP1. TP2 was valved off (at V4) and shut down until we can replace its controller.
TP3 has its own problems, however. It was valved off in January after its temperature readback began glitching and spuriously triggering the interlocks [ELOG 15140]. However the problem appears to be limited only one readback (rotation speed, current, voltage are fine) and there is enough redundancy in the pump-dependent interlock conditions to safely connect it to the main volume.
We also discovered that sometime since January, the TP3 dry pump has failed. The foreline pressure had risen to 165 torr. Since the TP2 and TP3 dry pumps are not interchangeable (Agilent vs. Varian), we instead valved in the auxiliary dry pump and disconnected the failed dry pump using a KF blank. This is a temporary arrangement until the permanent dry pump can be repaired. Jordan removed it to replace the tip seals and will test it in the bake lab before reinstalling.
With this configuration in place, we proceeded to pump down the main volume without issue (attachment 1). We monitored the pumpdown for about 45 min., until the pressure had reached ~1E-5 torr and TP3 had been transitioned to standby (low-speed) mode.
Summary of topology changes:
- TP2 valved off and shut down until controller can be replaced
- TP3 temporarily backing for TP1
- Auxiliary dry pump temporarily backing for TP3
- TP3 dry pump has been removed for repairs
|
Attachment 1: Pumpdown.png
|
|
15404
|
Wed Jun 17 16:27:51 2020 |
gautam | Update | VAC | Questions/comments on vacuum | I missed the vacuum discussion on the call today, but I have some questions/comments:
- Isn’t it true that we didn’t digitally monitor any of the TP diagnostic channels before 2018 December? I don’t have the full history but certainly there wasn’t any failure of the vacuum system connected to pump current/temp/speed from Sep 2015-Dec2018, whereas we have had 2 interruptions in 6 months because of flaky serial communications.
- According to the manuals, the turbo-pumps have their own internal logic to shut off the pump when either bearing temperature exceeds 60C or current exceeds 1.5A. I agree its good to have some redundancy, but do we really expect that our outer interlock loops will function if the internal ones fail?
- In what scenario do we expect that all our pressure gauge readbacks fail, but not the TP readbacks? If so, won’t the differential pressure conditions protect the vacuum envelope, and the TPs internal shutoffs will protect the pumps? Except during the pump down phase perhaps, when we want to give a little more headroom to the small TPs to stress them less?
At the very least, I think we should consider making the interlock code have levels (like interrupts on a micro controller). So if the pressure gauges are communicating and are reporting acceptable pressure readings, we should be able to reject unphysical readbacks from the TP controllers.
I still don’t understand why TP2 can’t back TP1, but we just disable all the software interlock conditions contingent on TP2 readbacks. This pump is far newer than TP3, and unless I’ve misunderstood something major about the vacuum infrastructure, I don’t really see why we should trust this flaky serial readbacks for any actionable interlocks, at least without some AND logic (since temperature, current and speed aren’t really independent variables).
I also think we should finally implement the email alert in the event the vacuum interlock is tripped. I can implement this if no one else volunteers.
This might also be a good reminder to get the documentation in order about the new vacuum system. |
15406
|
Thu Jun 18 11:00:24 2020 |
Jon | Update | VAC | Questions/comments on vacuum |
Quote: |
- Isn’t it true that we didn’t digitally monitor any of the TP diagnostic channels before 2018 December? I don’t have the full history but certainly there wasn’t any failure of the vacuum system connected to pump current/temp/speed from Sep 2015-Dec2018, whereas we have had 2 interruptions in 6 months because of flaky serial communications.
|
Looking at images of the old vac screens, the TP2/3 rotation speed and status string were digitally monitored. However I don't know if there were software interlocks predicated on those.
Quote: |
- According to the manuals, the turbo-pumps have their own internal logic to shut off the pump when either bearing temperature exceeds 60C or current exceeds 1.5A. I agree its good to have some redundancy, but do we really expect that our outer interlock loops will function if the internal ones fail?
|
The temperature and current interlocks are implemented precisely because the pumps can shut themselves off. The concern is not about damaging the pumps (their internal logic protects against that); it's that a pump could automatically shut down and back-vent the IFO to atmosphere. Another interlock (e.g., the pressure differentials) might catch it, but it would depend on the back-vent rate and the scenario has never been tested. The temperature and current interlocks are set to trip just before the pump reaches its internal shut-down threshold.
One way we might be able to reduce our reliance on the flaky serial readbacks is to implement rotation-speed hardware interlocks. The old vac documentation alludes to these, but as far as Chub and I could determine in 2018, they never actually existed. The older turbo controllers, at least, had an analog output proportional to speed which could be used to control a relay to interrupt the V4/5 control signals. I'll look into this for the new controllers. If it could be done, we could likely eliminate the layer of serial-readback interlocks altogether.
|
- I also think we should finally implement the email alert in the event the vacuum interlock is tripped. I can implement this if no one else volunteers.
|
That would be awesome if you're willing to volunteer. I agree this would be great to have. |
15407
|
Thu Jun 18 12:00:36 2020 |
gautam | Update | VAC | Questions/comments on vacuum | I agree there were MEDM fields, but I can't find any record of these channels being recorded till 2018 December, so I don't agree that they were being digitally monitored. You can also look back in the elog (e.g. here and here) and see that the display fields are just blank. I would then assume that no interlocks were dependent on these channels, because otherwise the vacuum interlocks would be perpetually tripped.
Looking at images of the old vac screens, the TP2/3 rotation speed and status string were digitally monitored. However I don't know if there were software interlocks predicated on those.
Sorry but I'm having trouble imagining a scenario how the pressure gauges wouldn't register this before the IFO volume is compromised. Is there some back of the envelope calculations I can do to understand this? Since both the pressure gauges and the TP diagnostic channels are being monitored via EPICS, the refresh rate is similar, so I don't see how we can have a pump temperature / speed / current threshold tripped but NOT have this be registered on all the pressure gauges, seems like a bit of a contrived scenario to me. Our thresholds currently seem to be arbitrary numbers anyway, or are they based on some expected backstreaming rate? Isn't this scenario degenerate with a leak elsewhere in the vacuum envelope that would be caught by the differential pressure interlocks?
The temperature and current interlocks are implemented precisely because the pumps can shut themselves off. The concern is not about damaging the pumps (their internal logic protects against that); it's that a pump could automatically shut down and back-vent the IFO to atmosphere. Another interlock (e.g., the pressure differentials) might catch it, but it would depend on the back-vent rate and the scenario has never been tested. The temperature and current interlocks are set to trip just before the pump reaches its internal shut-down threshold.
For the email alert, can you expose a soft channel that is a flag - if this flag is not 1, then the service will send out an email.
That would be awesome if you're willing to volunteer. I agree this would be great to have. |
15408
|
Thu Jun 18 14:13:03 2020 |
Jon | Update | VAC | Questions/comments on vacuum | I agree there were MEDM fields, but I can't find any record of these channels being recorded till 2018 December, so I don't agree that they were being digitally monitored. You can also look back in the elog (e.g. here and here) and see that the display fields are just blank. I would then assume that no interlocks were dependent on these channels, because otherwise the vacuum interlocks would be perpetually tripped.
Right, I doubt they were ever recorded or used for interlocks. But the readbacks did work at one point in the past. There's a photo of the old vac monitor screen on p. 19 of E1500239 (last updated 2017) which shows the fields once alive.
Sorry but I'm having trouble imagining a scenario how the pressure gauges wouldn't register this before the IFO volume is compromised. Is there some back of the envelope calculations I can do to understand this? Since both the pressure gauges and the TP diagnostic channels are being monitored via EPICS, the refresh rate is similar, so I don't see how we can have a pump temperature / speed / current threshold tripped but NOT have this be registered on all the pressure gauges, seems like a bit of a contrived scenario to me. Our thresholds currently seem to be arbitrary numbers anyway, or are they based on some expected backstreaming rate? Isn't this scenario degenerate with a leak elsewhere in the vacuum envelope that would be caught by the differential pressure interlocks?​
I don't disagree that the pressure gauges would register the change. What I'm not sure about is whether the change would violate any of the existing interlock conditions, triggering a shutdown. Looking at what we have now, the only non-pump-related conditions I see that might catch it are the diffpres conditions:
-
abs(P2 - PTP2) > 1 torr (for a TP2 failure)
-
abs(P3 - PTP3) > 1 torr (for a TP3 failure)
-
abs(P1a - P2) > 1 torr (for either a TP2 or TP3 failure)
For the P1a-P2 differential, the threshold of 1 torr is the smallest value that in practice still allows us to pump down the IFO without having to disable the interlocks (P1a-P2 is the TP1 intake/exhaust differential). The purpose of the P2-PTP2/P3-PTP3 differentials is to prevent V4/5 from opening and suddenly exposing the spinning turbo to high pressure. I'm not aware of a real damage threshold calculation that any one has done; I think < 1 torr is lore passed down by Steve.
If a turbo pump fails, the rate it would backstream is unknown (to me, at least) and likely depends on the failure mode. The scenario I'm concerned about is if the backstream rate is slower than the conduction time through the pumspool and into the main volume. In that case, the pressure gauges will rise more or less together all the way up to atmosphere, likely never crossing the 1 torr differential pressure thresholds.
For the email alert, can you expose a soft channel that is a flag - if this flag is not 1, then the service will send out an email.
There's already a channel C1:Vac-error_status, where if the value is anything other than an empty string, there is an interlock tripped. Does that work? |
15409
|
Thu Jun 18 15:25:08 2020 |
Jordan | Update | VAC | TP2 and TP3 Forepump removal | I removed the backing pumps for TP2 and TP3 today to test ultimate pressure and determine if they need a tip seal replacement. This was done with Jon backing me on Zoom. We closed off TP3 and powered down TP3 and the auxilliary pump, in order to remove the forepumps from the exhaust line.
- Close V1
- Close V5
- Turn off TP3
- Turn off aux dry pump (manually)
- Once the PTP3 foreline pressure has come up to atmosphere, you can disconnect the TP3 dry pump and cap the exhaust line with a KF blank.
- Restore the vac configuration in reverse order: dry pump ON, TP3 ON, open V5, open V1
Once pumps were removed I connected a Pirani gauge to the pump directly and pumped down, results as follows:
TP2 Forepump (Agilent IDP 7):
- Ultimate Pressure: 123 mtorr
- Hours: 10903
TP3 Forepump (Varian SH 110):
- Ultimate pressure: ~70 torr
- Hours: 60300
TP3 forepump defintely needs a new tip seal, and while the pressure on TP2 Forepump was good there was a significant amount of particulate that came out of the exhaust line, so a new tip seal might not be needed but it is recommeded. |
15410
|
Thu Jun 18 15:46:34 2020 |
gautam | Update | VAC | Questions/comments on vacuum | So why not just have a special mode for the interlock code during pumpdown and venting, and during normal operation we expect the main volume pressure to be <100uTorr so the interlock trips if this condition is violated? These can just be EPICS buttons on the Vac control MEDM screen. Both of these procedures are not "business as usual", and even if we script them in the future, it's likely to have some operator supervising, so I don't think it's unreasonable to have to switch between these modes. I just think the pressure gauges have demonstrated themselves to be much more reliable than these TP serial readbacks (as you say, they worked once upon a time, but that is already evidence of its flakiness?). The Pirani gauges are not ultra-reliable, they have failed in the past, but at least less frequently than this serial comm glitching. In fact, if these readbacks are so flaky, it's not impossible that they don't signal a TP shutdown? I just think the real power of having these multi-channel diagnostics is lost without some AND logic - a turbopump failure is likely to result in an increase in pump current and temperature increase and pump speed decrease, so it's not the individual channel values that should be determining if an interlock is tripped.
I definitely think that protecting the vacuum envelope is a priority - but I don't think it should be at the expense of commissioning time. But if you think these extra interlocks are essential to the safety of the vacuum system, I withdraw my request.
I don't disagree that the pressure gauges would register the change. What I'm not sure about is whether the change would violate any of the existing interlock conditions, triggering a shutdown. Looking at what we have now, the only non-pump-related conditions I see that might catch it are the diffpres conditions:
It would be better to have a flag channel, might be useful for the summary pages too. I will make it if it is too much trouble.
There's already a channel C1:Vac-error_status, where if the value is anything other than an empty string, there is an interlock tripped. Does that work? |
15411
|
Thu Jun 18 16:56:34 2020 |
Jordan | Update | VAC | TP2 and TP3 Forepump removal |
Quote: |
I removed the backing pumps for TP2 and TP3 today to test ultimate pressure and determine if they need a tip seal replacement. This was done with Jon backing me on Zoom. We closed off TP3 and powered down TP3 and the auxilliary pump, in order to remove the forepumps from the exhaust line.
- Close V1
- Close V5
- Turn off TP3
- Turn off aux dry pump (manually)
- Once the PTP3 foreline pressure has come up to atmosphere, you can disconnect the TP3 dry pump and cap the exhaust line with a KF blank.
- Restore the vac configuration in reverse order: dry pump ON, TP3 ON, open V5, open V1
Once pumps were removed I connected a Pirani gauge to the pump directly and pumped down, results as follows:
TP2 Forepump (Agilent IDP 7):
- Ultimate Pressure: 123 mtorr
- Hours: 10903
TP3 Forepump (Varian SH 110):
- Ultimate pressure: ~70 torr
- Hours: 60300
TP3 forepump defintely needs a new tip seal, and while the pressure on TP2 Forepump was good there was a significant amount of particulate that came out of the exhaust line, so a new tip seal might not be needed but it is recommeded.
|
I agree with your assessment, Jordan. If I'm not mistaken the scroll pump for TP2 is new; we had a very early failure with the last new scroll pump (the forepump for TP3) tip seals at just over 5000 hours. Glad to see my replacement seals held up for over 60K hours. If this is the trend with these pumps, we can simply run them to around 60000 hours and replace the seals at that time, rather than waiting for failure! - Chub |
15412
|
Thu Jun 18 22:33:57 2020 |
Jon | Omnistructure | VAC | Vac hardware purchase list | Replacement Hardware Purchase List
I've created a purchase list of hardware needed to restore the aging vacuum system. This wasn't planned as part of the BHD upgrade, but I've added it to the BHD procurement list since hardware replacements have become necessary.
The list proposes replacing the aging TP3 Varian turbo pump with the newer Agilent model which has already replaced TP2. It seems I was mistaken in believing we already had a second Agilent pump on hand. A thorough search of the lab has not turned it up, and Steve himself has told me he doesn't remember ordering a second one. Fortunately Steve did leave us a detailed Agilent parts list [ELOG 14322].
It also proposes replacing the glitching TP2 Agilent controller with a new one. The existing one can be sent back for repair and then retained as a spare. Considering that one of these controllers is already malfunctioning after < 2 years, I think it's a very good idea to have a spare on hand.
Known Hardware Issues
Below is our current list of vacuum hardware issues. Items that this purchase list will address (limited to only the most urgent) are highlighted in yellow.
- Replace the UPS
- Need a 240V socket for TP1 (currently TP1 is not protected from power loss)
- Need RS232/485 comms with the interlock server (current UPS: serial readbacks have failed, battery is failing)
- Remove/replace the failed pressure gauges (~5)
- Add more cold cathode sensors to the main volume for sensor redundancy (currently the main-volume interlocks rely on only 1 working sensor)
- Replace TP3 (controller is failing)
- Replace TP2 controller (serial interface has failed)
- Remove RP2
- Dead and also not needed. We already have to throttle the pumpdown rate with only two roughing pumps
- Remove/refurbish the cryopump
- Contamination risk to have it sitting connectable to the main volume
|
15413
|
Fri Jun 19 07:40:49 2020 |
Jon | Update | VAC | Questions/comments on vacuum | I think we should discuss interlock possibilities at a 40m meeting. I'm reluctant to make the system more complicated, but perhaps we can find ways to reduce the reliance on the turbo pump readbacks. I agree they've proven to be the least reliable.
While we may be able to improve the tolerance to certain kinds of hardware malfunctions (and if so, we should), I don't see interlocks triggering on abnormal behavior of critical equipment as the root problem. As I see it, our bigger problem is with all the malfunctioning, mostly end-of-lifetime pieces of vacuum equipment still in use. If we can address the hardware problems, as I'm trying to do with replacements [ELOG 15412], I think that in itself will make the interlocking much less of an issue.
Quote: |
So why not just have a special mode for the interlock code during pumpdown and venting, and during normal operation we expect the main volume pressure to be <100uTorr so the interlock trips if this condition is violated? These can just be EPICS buttons on the Vac control MEDM screen. Both of these procedures are not "business as usual", and even if we script them in the future, it's likely to have some operator supervising, so I don't think it's unreasonable to have to switch between these modes. I just think the pressure gauges have demonstrated themselves to be much more reliable than these TP serial readbacks (as you say, they worked once upon a time, but that is already evidence of its flakiness?). The Pirani gauges are not ultra-reliable, they have failed in the past, but at least less frequently than this serial comm glitching. In fact, if these readbacks are so flaky, it's not impossible that they don't signal a TP shutdown? I just think the real power of having these multi-channel diagnostics is lost without some AND logic - a turbopump failure is likely to result in an increase in pump current and temperature increase and pump speed decrease, so it's not the individual channel values that should be determining if an interlock is tripped.
|
Ok, this can be added pretty easily. Its value will just be toggled between 1 and 0 every time the interlock server raises/clears the existing string channel. Adding the channel will require restarting the whole vac IOC, so I'll do it at a time when Jordan is on hand in case something fails to come back up.
Quote: |
It would be better to have a flag channel, might be useful for the summary pages too. I will make it if it is too much trouble.
|
|
15415
|
Fri Jun 19 09:57:35 2020 |
gautam | Update | VAC | Questions/comments on vacuum | For this particular email service, ideally the email should be sent out as soon as the interlock is tripped, so this would require a line of code to be added to the main interlock code. Which I guess would require a restart of the interlock service. So let me know when you guys plan to do the dry-pump tip seal replacement operation (when I presume valves will be closed anyways) so that we can do this in a minimally invasive way.
Quote: |
Ok, this can be added pretty easily. Its value will just be toggled between 1 and 0 every time the interlock server raises/clears the existing string channel. Adding the channel will require restarting the whole vac IOC, so I'll do it at a time when Jordan is on hand in case something fails to come back up.
|
|
15417
|
Fri Jun 19 14:03:50 2020 |
Jordan | Update | VAC | Forepump Tip Seal Replacement | Tip Seals were replaced on the forepumps for TP2 and TP3, and both are ready to be installed back onto the forelines.
TP2 Forepump Ultimate Pressure: 180 mtorr
TP3 Forepump Ultimate Pressure: 120 mtorr |
15421
|
Mon Jun 22 10:43:25 2020 |
Jon | Configuration | VAC | Vac maintenance at 11 am | The vac system is going down at 11 am today for planned maintenance:
- Re-install the repaired TP2 and TP3 dry pumps [ELOG 15417]
- Incorporate an auto-mailer and flag channel into the controls code for signaling tripped interlocks [ELOG 15413]
We will advise when the work is completed. |
15424
|
Mon Jun 22 20:06:06 2020 |
Jon | Configuration | VAC | Vac maintenance complete | This work is finally complete. The dry pump replacement was finished quickly but the controls updates required some substantial debugging.
For one, the mailer code I had been given to install would not run against Python 3.4 on c1vac, the version run by the vac controls since about a year ago. There were some missing dependencies that proved difficult to install (related to Debian Jessie becoming unsupported). I ultimately solved the problem by migrating the whole system to Python 3.5. Getting the Python keyring working within systemd (for email account authentication) also took some time.
Edit: The new interlock flag channel is named C1:Vac-interlock_flag.
Along the way, I discovered why the interlocks had been failing to auto-close the PSL shutter: The interlock was pointed to the channel C1:AUX-PSL_ShutterRqst. During the recent c1psl upgrade, we renamed this channel C1:PSL-PSL_ShutterRqst. This has been fixed.
The main volume is being pumped down, for now still in a TP3-backed configuration. As of 8:30 pm the pressure had fallen back to the upper 1E-6 range. The interlock protection is fully restored. Any time an interlock is triggered in the future, the system will send an immediate notification to 40m mailing list. 👍
Quote: |
The vac system is going down at 11 am today for planned maintenance:
- Re-install the repaired TP2 and TP3 dry pumps [ELOG 15417]
- Incorporate an auto-mailer and flag channel into the controls code for signaling tripped interlocks [ELOG 15413]
|
|
Attachment 1: Pumpdown-6-22-20.png
|
|
15425
|
Tue Jun 23 17:54:56 2020 |
rana | Configuration | VAC | Vac maintenance complete | I propose we go for all CAPS for all channel names. The lower case names is just a holdover from Steve/Alan from the 90's. All other systems are all CAPS.
It avoids us having to force them all to UPPER in the scripts and channel lists. |
15446
|
Wed Jul 1 18:03:04 2020 |
Jon | Configuration | VAC | UPS replacements | I looked into how the new UPS devices suggested by Chub would communicate with the vac interlocks. There are several possible ways, listed in order of preference:
- Python interlock service directly queries the UPS via a USB link using the (unofficial) tripplite package. Direct communication would be ideal because it avoids introducing a dependency on third-party software outside the monitoring/control capability of the interlock manager. However the documentation warns this package does not work for all models...
- Configure Tripp Lite's proprietary software (PowerAlert Local) to send SYSLOG event messages (UDP packets) to a socket monitored by the Python interlock manager.
- Configure the proprietary software to execute a custom script upon an event occurring. The script would, e.g., set an EPICS flag channel which the interlock manager is continually monitoring.
I recommend we proceed with ordering the Tripp Lite 36HW20 for TP1 and Tripp Lite 1AYA6 for TP2 and TP3 (and other 120V electronics). As far as I can tell, the only difference between the two 120V options is that the 6FXN4 model is TAA-compliant. |
15465
|
Thu Jul 9 18:00:35 2020 |
Jon | Configuration | VAC | UPS replacements | Chub has placed the order for two new UPS units (115V for TP2/3 and a 220V version for TP1).
They will arrive within the next two weeks.
Quote: |
I looked into how the new UPS devices suggested by Chub would communicate with the vac interlocks. There are several possible ways, listed in order of preference:
- Python interlock service directly queries the UPS via a USB link using the (unofficial) tripplite package. Direct communication would be ideal because it avoids introducing a dependency on third-party software outside the monitoring/control capability of the interlock manager. However the documentation warns this package does not work for all models...
- Configure Tripp Lite's proprietary software (PowerAlert Local) to send SYSLOG event messages (UDP packets) to a socket monitored by the Python interlock manager.
- Configure the proprietary software to execute a custom script upon an event occurring. The script would, e.g., set an EPICS flag channel which the interlock manager is continually monitoring.
I recommend we proceed with ordering the Tripp Lite 36HW20 for TP1 and Tripp Lite 1AYA6 for TP2 and TP3 (and other 120V electronics). As far as I can tell, the only difference between the two 120V options is that the 6FXN4 model is TAA-compliant.
|
|
15499
|
Thu Jul 23 15:58:24 2020 |
Jon | Summary | VAC | Vacuum controls refurbishment plan | This year we've struggled with vacuum controls unreliability (e.g., spurious interlock triggers) caused by decaying hardware. Here are details of the vacuum refurbishment plan I described on the 40m call this week.
☑ Refurbish TP2 and TP3 dry pumps. Completed [ELOG 15417].
☑ Automated notifications of interlock-trigger events. Email to 40m list and a new interlock flag channel. Completed [ELOG 15424].
☐ Replace failing UPS.
- Two new Tripp Lite units on order, 110V and 230V [ELOG 15465].
- Jordan will install them in the vacuum rack once received.
- Once installed, Jon will come test the new units, set up communications, and integrate them into the interlock system following this plan [ELOG 15446].
- Jon will move the pumps and other equipment to the new UPS units only after completing the above step.
☐ Remove interlock dependencies on TP2/TP3 serial readbacks. Due to persistent glitching [ELOG 15140, ELOG 15392].
Unlike TP2 and TP3, the TP1 readbacks are real analog signals routed to Acromags. As these have caused us no issues at all, the plan is to eliminate dependence on the TP2/3 digital readbacks in favor of the analog controller outputs. All the digital readback channels will continue to exist, but the interlock system will no longer depend on them. This will require adding 2 new sinking BI channels each for TP2 and TP3 (for a total of 4 new channels). We have 8 open Acromag XT1111 channels in the c1vac system [ELOG 14493], so the new channels can be accommodated. The below table summarizes the proposed changes.
Channel |
Type |
Status |
Description |
Interlock |
C1:Vac-TP1_current |
AI |
exists |
Current draw (A) |
keep |
C1:Vac-TP1_fail |
BI |
exists |
Critical fault has occurred |
keep |
C1:Vac-TP1_norm |
BI |
exists |
Rotation speed is within +/-10% of set point |
new |
C1:Vac-TP2_rot |
soft |
exists |
Rotation speed (krpm) |
remove |
C1:Vac-TP2_temp |
soft |
exists |
Temperature (C) |
remove |
C1:Vac-TP2_current |
soft |
exists |
Current draw (A) |
remove |
C1:Vac-TP2_fail |
BI |
new |
Critical fault has occurred |
new |
C1:Vac-TP2_norm |
BI |
new |
Rotation speed is >80% of set point |
new |
C1:Vac-TP3_rot |
soft |
exists |
Rotation speed (krpm) |
remove |
C1:Vac-TP3_temp |
soft |
exists |
Temperature (C) |
remove |
C1:Vac-TP3_current |
soft |
exists |
Current draw (A) |
remove |
C1:Vac-TP3_fail |
BI |
new |
Critical fault has occurred |
new |
C1:Vac-TP3_norm |
BI |
new |
Rotation speed is >80% of set point |
new |
|
15500
|
Fri Jul 24 15:40:59 2020 |
Jordan | Update | VAC | Installation of two new UPS units | I installed the Tripp Lite SMX1000RT2U and Tripp Lite Smart1000LCD at the bottom of the 1x8 electronics rack. These are plugged in to power, and are ready for testing. All other cables (serial, usb, etc.) have been left on the table next to the 1x8 rack. |
Attachment 1: UPS.jpg
|
|
15501
|
Mon Jul 27 15:48:36 2020 |
Jon | Summary | VAC | Vacuum parts ordered | To carry out the next steps of the vac refurbishment plan [ELOG 15499], I've ordered parts necessary for interfacing the UPS units and the analog TP2/3 controller outputs with c1vac. The purchase list is appended to the main BHD list and is located here. Some parts we already had in the boxes of Acromag materials. Jordan is gathering what we do already have and staging it on the vacuum controls console table - please don't move them or put them away.
Quote: |
☐ Replace failing UPS.
☐ Remove interlock dependencies on TP2/TP3 serial readbacks. Due to persistent glitching [ELOG 15140, ELOG 15392].
|
|
|