40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 338 of 357  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tue Mar 24 13:10:07 2009, Alberto, Configuration, PSL, new mirror installed on the AP table 
Entry  Mon Mar 30 12:29:17 2009, Yoichi, Configuration, , MC1 glitches not seen during the weekend MC_drift.pdf
Entry  Mon Mar 30 12:46:36 2009, Yoichi, Configuration, IOO, IOO QPDs were missing the beam IOO-QPDs.pdf
Entry  Mon Mar 30 17:02:46 2009, Yoichi, Configuration, General, AP OSA aligned 
Entry  Tue Apr 7 21:39:57 2009, Yoichi, Configuration, Computers, LSC code recompiled with a fix for denormalization problem 
Entry  Wed Apr 8 09:36:20 2009, steve, Configuration, VAC, valve condition changed to BG to calibrate the RGA 
   +  Reply  Wed Apr 8 18:18:33 2009, rana, Configuration, Computers, LSC code recompiled with a fix for denormalization problem 
Entry  Wed Apr 8 18:46:50 2009, rana, Configuration, General, DMF, SVN, x2mc, and matlab 
Entry  Sun Apr 12 01:19:30 2009, Yoichi, Configuration, Computers, New FE codes for suspensions not successful 
Entry  Wed Apr 15 02:18:42 2009, rana, Configuration, Computers, nodus vfstab changed for rigel 
   +  Reply  Wed Apr 15 11:25:21 2009, steve, Configuration, VAC, RGA cal completed rga-090415-bg-d7-cald2.png
Entry  Thu Apr 16 17:48:00 2009, Yoichi, Configuration, Computer Scripts / Programs, AutoDTT 
   +  Reply  Fri Apr 17 11:37:32 2009, Yoichi, Configuration, Computer Scripts / Programs, AutoDTT 
Entry  Mon Apr 20 05:18:42 2009, Yoichi, Configuration, Locking, FM6 and FM10 of LSC-MC were restored 
Entry  Mon Apr 20 19:51:51 2009, Jenne, Configuration, PSL, PMC has new Level 13 Mixer installed PMColg20Apr2009.png
Entry  Mon Apr 20 20:00:44 2009, rana, Configuration, IOO, McWFS gains re-allocated 
Entry  Mon Apr 20 20:45:25 2009, rana, Configuration, General, SVN: project area added 
Entry  Wed Apr 22 11:16:26 2009, steve, Configuration, VAC, Cryo pump is ON and the Maglev is dead cryoOn.jpg
Entry  Sat Apr 25 00:45:31 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed 
   +  Reply  Sat Apr 25 02:54:25 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed 
Entry  Mon Apr 27 18:31:44 2009, steve, Configuration, VAC, VC1 closed 
Entry  Tue Apr 28 01:48:45 2009, pete, Configuration, VAC, VC1 open 
Entry  Tue Apr 28 09:27:32 2009, steve, Configuration, VAC, cryopump deserves some credit cryfl.jpgseiscryofl.jpg
Entry  Wed May 6 16:56:35 2009, rana, alex, joe, Configuration, Computers, daqd log, cront, etc. 
Entry  Thu May 7 12:21:36 2009, josephb, alex, Configuration, Computers, fb40m  
   +  Reply  Thu May 7 15:22:19 2009, josephb, alberto, Configuration, Computers, fb40m  
Entry  Thu May 7 17:59:23 2009, Alberto, Configuration, , MC WFS 
Entry  Mon May 18 19:44:52 2009, rana, steve, Configuration, VAC, Cryo Pump turned off and valved off: 1 beer can only 
   +  Reply  Mon May 18 20:16:20 2009, rana, Configuration, VAC, not it a.png
Entry  Mon May 18 21:34:18 2009, rana, Configuration, SUS, ETMY f2pRatio script run 
   +  Reply  Tue May 19 09:34:29 2009, steve, Configuration, VAC, IFO is not pumped & CRYO is being regenerated cryoreg.jpgcryo30d.jpg
   +  Reply  Tue May 19 12:30:41 2009, rob, Configuration, SUS, ETMY f2pRatio script run f2ademo.png
   +  Reply  Tue May 19 16:18:45 2009, steve, Configuration, VAC, IFO pressure is 4.2e-7 Torr with CRYO pump 
Entry  Thu May 21 12:58:32 2009, rob, Configuration, ALARM, PEM count-half disabled 
Entry  Fri May 22 00:43:24 2009, rob, Configuration, Computer Scripts / Programs, IFO configure scripts for XARM and YARM 
Entry  Sat May 30 11:24:56 2009, rob, Configuration, PSL, NPRO slow scan slowSCAN.png
Entry  Mon Jun 1 14:33:42 2009, rob, Configuration, Computer Scripts / Programs, op540m Monitor added to web status 
Entry  Tue Jun 2 23:12:08 2009, rob, Configuration, Computers, ntp on op440m 
Entry  Thu Jun 4 01:32:20 2009, rob, Configuration, LSC, AS port mode scan modes.png
Entry  Fri Jun 12 09:56:38 2009, steve, Configuration, VAC, new maglev installed m390pd.jpg
   +  Reply  Fri Jun 12 15:34:49 2009, steve, Configuration, VAC, maglev is running 
Entry  Mon Jun 15 15:17:33 2009, josephb, Steve, Configuration, VAC, Vacuum control and monitor screens 
   +  Reply  Mon Jun 15 16:31:36 2009, steve, Configuration, VAC, RGA is scanning new Maglev 
Entry  Tue Jun 16 09:02:30 2009, steve, Configuration, VAC, new maglev RGA scan nmagd4scan.jpgnmagd4.jpg
Entry  Wed Jun 17 01:07:50 2009, rob, Configuration, Computers, matapps on /cvs/cds 
Entry  Fri Jun 19 13:38:42 2009, Alberto, Configuration, Computers, elog rebooted 
   +  Reply  Fri Jun 19 14:30:47 2009, Alberto, Configuration, Computers, elog rebooted 
   +  Reply  Sun Jun 21 00:08:26 2009, rana, Configuration, Computers, elog rebooted 
   +  Reply  Tue Jun 23 15:19:42 2009, steve, Configuration, VAC, V1 is open V1_opennmag.jpg
Entry  Tue Jun 23 23:14:36 2009, Clara, Configuration, PEM, Accelerometers relocated 
ELOG V3.1.3-