40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 338 of 355
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17707 Entries
Goto page
Previous
1
,
2
,
3
...
337
, 338,
339
...
353
,
354
,
355
Next
Wed Oct 13 11:25:14 2021, Anchal, Summary, CDS, Ran c1sus2 models in martian CDS. All good!
Fri Oct 15 16:46:27 2021, Anchal, Summary, Optical Levers, Vent Prep
Wed Oct 20 11:16:21 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber
Wed Oct 20 11:48:27 2021, Anchal, Summary, CDS, Power supple configured correctly.
Thu Oct 21 11:41:31 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber
Mon Oct 25 13:23:45 2021, Anchal, Summary, BHD, Before photos of BSC
Mon Oct 25 17:37:42 2021, Anchal, Summary, BHD, Part I of BHR upgrade - Removed optics from BSC
Wed Oct 27 16:27:16 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Prep
Wed Oct 27 16:31:35 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Removal of PR2 Small Suspension
Wed Oct 27 16:38:02 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment
Thu Oct 28 17:01:54 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Adding temp fixed flat mirror for PR2
Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE.
Fri Nov 5 12:21:16 2021, Anchal, Summary, BHD, Part VI of BHR upgrade - Removal of ITMYC optics
Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered
Wed Nov 17 17:37:53 2021, Anchal, Update, General, Placed Nodus and fb1 on UPS power
Thu Nov 18 15:16:10 2021, Anchal, Update, General, Moved Chiara to 1X7 above nodus powered with same UPS
Mon Nov 22 17:42:19 2021, Anchal, Update, General, Connected Megatron to battery backed ports of another UPS
Tue Nov 23 18:02:05 2021, Anchal, Update, IMC, MC autolocker shifted to python3 script running in docker
Wed Dec 15 16:11:38 2021, Anchal, Summary, BHD, Part VIII of BHR upgrade - Placed LO1
Thu Dec 16 12:21:16 2021, Anchal, Update, BHD, Coil driver test failed for S2100619-v1
Thu Dec 16 15:32:59 2021, Anchal, Update, BHD, Finished Coil driver (odd serial number) units tests
Thu Dec 16 17:57:17 2021, Anchal, Update, BHD, Finished Coil driver (odd serial number) units tests
Sun Dec 19 07:52:51 2021, Anchal, Update, SUS, Remaining task for 2021
Mon Dec 20 14:10:56 2021, Anchal, Update, BHD, All coil drivers ready to be used, modified and tested
Tue Dec 21 16:52:39 2021, Anchal, Summary, Electronics, In-air Sat Amp to Vacuum Flange cables laid for 7 new SOS
Wed Dec 22 17:40:22 2021, Anchal, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs
Tue Jan 4 18:26:59 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission
Wed Jan 5 17:46:04 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission
Thu Jan 6 11:54:20 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4
Thu Jan 6 12:52:49 2022, Anchal, Update, CDS, Yearly DAQD fix 2022!
Thu Jan 6 21:04:41 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO1 OSEMs inserted
Fri Jan 7 16:17:42 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4 filters
Fri Jan 7 17:54:13 2022, Anchal, Update, BHD, PR2 Sat Amp has a bad channel
Mon Jan 10 13:35:52 2022, Anchal, Update, BHD, PR2 Sat Amp has a bad channel
Mon Jan 10 14:52:51 2022, Anchal, Summary, BHD, LO1 OSEMs roughly calibrated and noise measured
Mon Jan 10 17:04:47 2022, Anchal, Update, BHD, AS1 Sat Amp CH2 had offset
Mon Jan 10 18:20:45 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission
Mon Jan 10 18:36:41 2022, Anchal, Summary, BHD, LO1 free swinging test set to trigger
Tue Jan 11 12:19:12 2022, Anchal, Summary, BHD, LO1 Input Matrix Diagonalization performed.
Tue Jan 11 15:21:16 2022, Anchal, Update, BHD, PR2 transmission calculation
Tue Jan 11 18:18:29 2022, Anchal, Summary, BHD, Attempted OSEM installation on AS1
Tue Jan 11 18:40:25 2022, Anchal, Summary, BHD, AS1 Sat Amp has a PCB issue
Thu Jan 13 09:48:41 2022, Anchal, Summary, BHD, AS1 Sat Amp fixed
Thu Jan 13 12:24:08 2022, Anchal, Summary, BHD, AS1 SD and LR magnets broke
Thu Jan 13 12:29:27 2022, Anchal, Summary, BHD, AS4 LR magnet broke
Thu Jan 13 17:10:55 2022, Anchal, Update, BHD, PR2 transmission calculation
Fri Jan 14 11:00:29 2022, Anchal, Update, BHD, PR2 transmission calculation
Fri Jan 14 12:01:21 2022, Anchal, Update, Electronics, BS & ITMY feedthroughs labeled and connected to Sat Amps
Fri Jan 14 13:46:25 2022, Anchal, Update, BHD, PR2 transmission calculation updated
Fri Jan 14 18:12:47 2022, Anchal, Summary, BHD, AS4 placed in ITMY Chamber, OSEMs connected
Goto page
Previous
1
,
2
,
3
...
337
, 338,
339
...
353
,
354
,
355
Next
ELOG V3.1.3-