  16557   Fri Jan 7 18:24:25 2022 KojiUpdateBHDSOS assembly -- SR2Vacseal in the freezer. It could have been
expired sooooo many years ago, We need some
cure testing.
  
  16558   Fri Jan 7 18:28:13 2022 KojiUpdateBHDPR2 Sat Amp has a bad channelLeave the unit to me. I can look it at
on Mon. For a while, you can take a replacement
unit from the electronics stack.
  
  16560   Mon Jan 10 13:35:52 2022 AnchalUpdateBHDPR2 Sat Amp has a bad channelThe unit was tested before by Tege. The
test included testing the testpoint voltages
only. He summarized his work in
  
  16561   Mon Jan 10 14:00:44 2022 not KojiUpdateBHDSOS assembly -- SR2Yes,

For the thin optics adapter design,
we want Peek 1/4-20 screw (part # 98885A131)
  
  16563   Mon Jan 10 15:45:55 2022 PacoUpdateElectronicsITMY feedthroughs and in-vac cables installed - part IThe ITMY 10" flange with 10 DSUB-25
feedthroughs has been installed with the
cables connected at the in-vac side. 
  
  16564   Mon Jan 10 15:59:46 2022 KojiUpdateBHDPR2 Sat Amp has a bad channelThe issue was present in the cable between
the small adapter board and the rear panel.
The cable and the Dsub 25 connectors were
 6x 
  16565   Mon Jan 10 17:04:47 2022 AnchalUpdateBHDAS1 Sat Amp CH2 had offsetWe found that there was a small offset
(~300 mV) at TP6 and TP8, in PD2 circuit
(CH2 of the board). I replaced U3 AD822ARZ
  
  16566   Mon Jan 10 18:20:45 2022 AnchalUpdateBHDTested 2" PR2 candidates transmissionI tested 2 more optics found by Paco and
Yehonathan in QIL.

  
  16568   Tue Jan 11 09:53:14 2022 not KojiUpdateBHDSOS assembly -- Peek screws and nutsI handed the Peek parts we got from McMaster
to Jordan for C&B.
  
  16569   Tue Jan 11 10:23:18 2022 PacoUpdateElectronicsITMY feedthroughs and in-vac cables installed - part II[Paco, Chub]

The ITMY 10" flange with 4
DSUB-25 feedthroughs has been installed with
  
  16570   Tue Jan 11 10:46:07 2022 TegaUpdateCDSSUS screen debuggingSeen. Thanks.

Red Arrow: The channel was labeled
incorrectly as INMON instead of OUTPUT
  
  16571   Tue Jan 11 10:58:58 2022 TegaUpdateSUSTemporary watchdogStarted working on this. First created
a git repo for tracking https://git.ligo.org/40m/susaux.git

I have looked through the folder
  
  16573   Tue Jan 11 13:43:14 2022 KojiUpdateSUSTemporary watchdogI don't remember the syntax of the
db file, but here this calc channel computes
A&B. And A&B corresponds to INPA
  
  16574   Tue Jan 11 14:21:53 2022 PacoUpdateElectronicsBS feedthroughs and in-vac cables installed[Paco, Yehonathan, Chub]

The BS chamber 10" flange
with 4 DSUB-25 feedthroughs has been installed
  
  16575   Tue Jan 11 15:21:16 2022 AnchalUpdateBHDPR2 transmission calculationI did this simple calculation where I assumed
1W power from laser and 10% transmission
past IMC. We would go ahead with V6-704/V6-705
 LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPRS_Trans_Calc.ipynb.zip 
  16582   Thu Jan 13 16:08:00 2022 YehonathanUpdateBHDgluing magnets after AS1/4 misfortune{Yehonathan, Anchal, Paco}

In the cleanroom, we removed AS1
and AS4 from their SOS towers. We removed
  
  16583   Thu Jan 13 17:10:55 2022 AnchalUpdateBHDPR2 transmission calculationI corrected the calculation by adding losses
by the arm cavity ends times the arm cavity
finesse and also taking into account the
 LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPR2_Trans_Calc.ipynb.zip 
  16584   Fri Jan 14 03:07:04 2022 KojiUpdateBHDPR2 transmission calculationI opened the notebook but I was not sure
where you have the loss per bounce for the
arm cavity.
  
  16585   Fri Jan 14 11:00:29 2022 AnchalUpdateBHDPR2 transmission calculationYeah, I counted the loss from arm cavities
as the transmission from ETMs on each bounce.
I assumed Michelson to be perfectly aligned
  
  16586   Fri Jan 14 12:01:21 2022 AnchalUpdateElectronicsBS & ITMY feedthroughs labeled and connected to Sat AmpsI labeled all the newly installed flanges
and connected the in-air cables (40m/16530)
to appropriate ports. These cables are connected
  
  16587   Fri Jan 14 13:46:25 2022 AnchalUpdateBHDPR2 transmission calculation updatedI updated the arm cavity roundtrip losses
due to scattering. Yehonathan told me that
arm cavity looses 50ppm every roundtrip other
 LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPR2_Trans_Calc.ipynb.zip 
  16588   Fri Jan 14 14:04:51 2022 PacoUpdateElectronicsRFSoC 2x2 board arrivedThe Xilinx RFSoC 2x2 board arrived right
before the winter break, so this is kind
of an overdue elog. I unboxed it, it came
 PXL_20220114_211249499.jpg 
  16589   Fri Jan 14 17:33:10 2022 YehonathanUpdateBHDAS4 resurrection{Yehonathan, Anchal}

Came this morning, the gluing of
the magnets was 100% successful. Side blocks,
 AS4_roll_balance2.pngAS4_magnet_height2.pngFreeSwingingSpectra.pdf 
  16597   Wed Jan 19 14:41:23 2022 KojiUpdateBHDSuspension StatusIs this the correct status? Please
directly update this entry.


  
  16598   Wed Jan 19 16:22:48 2022 AnchalUpdateBHDPR2 transmission calculation updatedI have further updated my calculation.
Please find the results in the attached pdf.

Following is the description of
 PR2transmissionSelectionAnalysis.pdfPR2_Trans_Calc.ipynb.zip 
  16599   Wed Jan 19 18:15:34 2022 YehonathanUpdateBHDAS1 resurrectionToday I suspended AS1. Anchal helped me
with the initial hanging of the optics. Attachments
1,2 show the roll balance and side magnet
 AS1_roll_balance2.pngAS1_magnet_heigh2.pngFreeSwingingSpectra.pdfIMG_6324.JPG 
  16600   Wed Jan 19 21:39:22 2022 TegaUpdateSUSTemporary watchdogAfter some work on the reference database
file, we now have a template for temporary
watchdog implementation for LO1 located here
  
  16601   Thu Jan 20 00:26:50 2022 KojiUpdateSUSTemporary watchdogAs the new db is made for c1susaux, 1)
it needs to be configured to be read by c1susaux
2) it requires restarting c1susaux 3) it
  
  16602   Thu Jan 20 01:48:02 2022 KojiUpdateBHDPR2 transmission calculation updatedIMC is not such lossy. IMC output is supposed
to be ~1W.

The critical coupling condition
  
  16603   Thu Jan 20 12:10:51 2022 YehonathanUpdateBHDAS1 resurrectionI was wondering whether I should take AS1
down to redo the wire clamping on the side
blocks. I decided to take the OpLev spectrum
 FreeSwingingSpectra.pdfFreeSwingingSpectra_div_20mV.pdfFreeSwingingSpectra_div_50mV.pdf 
  16604   Thu Jan 20 16:42:55 2022 PacoUpdateBHDAS4 OSEMs installation - part 2[Paco]

Turns out, the shifting was likely
due to the table level. Because I didn't
  
  16606   Thu Jan 20 17:21:21 2022 TegaUpdateSUSTemporary watchdogTemp software watchdog now operational
for LO1 and the remaining optics!

Koji helped me understand how to
  
  16607   Thu Jan 20 17:34:07 2022 KojiUpdateBHDV6-704/705 Mirror now @DownsThe PR2 candidate V6-704/705 mirrors (Qty2)
are now @Downs. Camille picked them up for
the measurements.
 PXL_20220120_225248265_2.jpgPXL_20220120_225309361_2.jpg 
  16608   Thu Jan 20 18:16:29 2022 AnchalUpdateBHDAS4 set to trigger free swing testAS4 is set to go through a free swinging
test at 10 pm tonight. We have used this
script (Git/40m/scripts/SUS/InMatCalc/
  
  16611   Fri Jan 21 12:46:31 2022 TegaUpdateCDSSUS screen debuggingAll done (almost)! I still have not sorted
the issue of pitch and yaw gains growing
together when modified using ramping time.
 Custom_ADC_DAC_monitors.png 
  16612   Fri Jan 21 14:51:00 2022 KojiUpdateBHDV6-704/705 Mirror now @DownsCamille@Downs measured the surface of these
M1 and M2 using Zygo.
 M1.PNGM1_30mm.PNGM2.PNGM2_30mm.PNG 
  16613   Fri Jan 21 16:40:10 2022 AnchalUpdateBHDAS4 Input Matrix Diagonalization performed. The free swinging test was successful.
I ran the input matrix diagonalization code
(/opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/sus_diagonalization.py)
 AS4_SUS_InpMat_Diagnolization_20220121.pdfAS4_FreeSwingData_PeakFitting_20220121.pdf 
  16616   Mon Jan 24 17:12:27 2022 ranaUpdateBHDAS4 Input Matrix Diagonalization performed. I think our
suspension input matrix diagonalization is
not so robust usually because
  
  16617   Mon Jan 24 17:58:21 2022 YehonathanUpdateBHDPR2 SuspensionI picked up the PR2 mirrors (labeled M1,
M2) from Anchel's table and took them
to the cleanroom. By inspection, I spotted
  
  16619   Mon Jan 24 20:48:48 2022 AnchalUpdateBHDAS4 Input Matrix Diagonalization performed. I agree. That's an interesting idea.
But does that mean that there is an always
working inverse matrix solution or that any
  
  16624   Tue Jan 25 18:37:12 2022 TYehonathanUpdateBHDPR2 SuspensionPR2's side magnet height was adjusted
and its roll was balanced (attachment 1,2).
I verified that the OpLev beam is still aligned.
 PR2_magnet_height.pngPR2_roll_balance.pngFreeSwingingSpectra_div_50mV.pdf 
  16634   Mon Jan 31 10:39:19 2022 JordanUpdateVACTP1 and Manual Gate Valve RemovalJordan, Chub

Today, Chub and I removed TP1 and
the failed manual gate valve off of the pumping
 20220131_100637.jpg20220131_102807.jpg20220131_102818.jpg20220131_100647.jpg 
  16636   Tue Feb 1 20:16:09 2022 TegaUpdateBHDPR2 candidate mirror analysisgit repo: git@git.ligo.org:tega-edo/charmirrormap.git

The analysis code takes in a set
of raw images, 10 in our case,  for
 PR2_M2_data.pngPR2_M2_recon_FoV_10mm.pngPR2_M2_residual_FoV_10mm.png 
  16643   Thu Feb 3 10:25:59 2022 JordanUpdateVACTP1 and Manual Gate Valve InstallJordan, Chub

Chub and I installed the new manual
gate valve (Nor-Cal GVM-6002-CF-K79) and
 20220203_101455.jpg20220203_094831.jpg20220203_094823.jpg 
  16644   Thu Feb 3 14:47:12 2022 ChubUpdateElectronicsnew UPS in placeReceived the new 1100VA APC UPS today and
placed it at the bottom of the valve rack. 
I'd connected the battery and plugged
  
  16646   Fri Feb 4 10:04:47 2022 ChubUpdateGeneraldish soap and clean scrub sponges!Bought dish soap and scrub sponges today
and placed them under the sink with the other
dish supplies.
 40m_supplies.jpg 
  16648   Mon Feb 7 09:00:26 2022 PacoUpdateGeneralScheduled power outage recovery[Paco]

Started recovering from scheduled
(Feb 05) power outage. Basically, time-reversing
  
  16649   Mon Feb 7 15:32:48 2022 YehonathanUpdateGeneralY End laser controllerI went to the Y end. The AUX laser was
on Standby. I pushed the Standby button.
The laser turned on and there was some green
  
  16650   Mon Feb 7 16:14:37 2022 TegaUpdateComputersrealtime system reboot problemI was looking into plotting temperature
sensor data trend and why we currently do
not have frame data written to file (on /frames)
  
  16651   Mon Feb 7 16:53:02 2022 KojiUpdateGeneralScheduled power outage recoveryI went to the X end and found it was warm.
Turned out that not all the A/Cs were on.
They were turned on now.
 PXL_20220208_001646282.jpgPXL_20220208_001657871.jpg 