40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 337 of 354
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17698 Entries
Goto page
Previous
1
,
2
,
3
...
336
, 337,
338
...
352
,
353
,
354
Next
ID
Date
Author
Type
Category
Subject
Text
8970
Tue Aug 6 10:06:29 2013
Steve
Update
VAC
Pumpdown is at 500Torr
The pumpdown has started at 8:38am
Manasa was here to confirm good alignment
of the IFO
8973
Tue Aug 6 16:45:31 2013
Steve
Update
VAC
Pumpdown is completed
IFO P1=1mT PSL shutter is opened
8976
Wed Aug 7 10:51:49 2013
Steve
Update
VAC
Pumpdown at 26hrs
Cold cathode gauge CC1 -h (horizontal)
just coming on 9.2e-5 Torr
P2 is the fore line pressure of the
8978
Wed Aug 7 15:36:29 2013
Steve
Update
VAC
TP2 drypump replaced
TP2's fore line - dry pump
replaced at performance level 600 mTorr after
8984
Thu Aug 8 07:57:23 2013
Steve
Update
VAC
pumpdown at 48 hrs
8985
Thu Aug 8 10:31:28 2013
Steve
Update
VAC
few reminders of this vent
1, Vacuum envelope grounds must be
connected all times! After door removal
reconnect both cables immediately.
9011
Wed Aug 14 08:24:20 2013
Steve
Update
VAC
pumpdown at day 8
9017
Fri Aug 16 09:35:18 2013
Steve
Update
VAC
Vacuum Normal state recognition is back
9029
Mon Aug 19 11:12:54 2013
Steve
Update
VAC
RGA scan at day 13
9084
Wed Aug 28 11:23:41 2013
Steve
Update
VAC
crane repair sheduled
9085
Wed Aug 28 15:41:42 2013
Steve
Update
VAC
RGA scan at day 23
Valve configuration: Vacuum Normal
pd76-m-d23
9111
Thu Sep 5 10:47:58 2013
Steve
Update
VAC
vertex crane folding issue
[Fred Goldbar, Mike Gerfen,
Dennis Coyne and Steve]
9115
Fri Sep 6 09:27:10 2013
Steve
Update
VAC
31 days after pumpdown
9117
Mon Sep 9 15:33:06 2013
Steve
Update
VAC
vertex crane repair is scheduled
9119
Tue Sep 10 09:18:22 2013
Steve
Update
VAC
dry pump is getting loud
TP3 foreline's dry pump is
getting noisier and noisier. Turbo
9120
Tue Sep 10 15:43:01 2013
Steve
Update
VAC
TP3' dry pump is replaced
9129
Mon Sep 16 10:57:11 2013
Steve
Update
VAC
RGA scan at day 41
9139
Wed Sep 18 14:57:12 2013
Steve
Update
VAC
vertex crane folding arm removed
The folding beam removed as shown.
Two man supporting it while I hammering it
out. Pin was dry and it gulled into supporting
9146
Fri Sep 20 16:37:30 2013
Steve
Update
VAC
vertex crane folding arm is back on
9173
Mon Sep 30 08:53:22 2013
Steve
Update
VAC
vertex crane repair schedule has changed
9185
Wed Oct 2 14:25:39 2013
Steve
Update
VAC
vertex crane is still out of order
The smoke alarms were turned off
and surrounding areas were covered with plastic.
9223
Wed Oct 9 11:48:10 2013
Steve
Update
VAC
RGA scan at day 65
Valve configuration: Vacuum
Normal
9359
Thu Nov 7 11:19:04 2013
Steve
Update
VAC
crane work POSTPONED to Monday
9372
Wed Nov 13 08:46:03 2013
Steve
Update
VAC
vertex crane repair completed
9424
Fri Nov 22 16:32:08 2013
Steve
Update
VAC
RGA scan at day 108
9467
Fri Dec 13 16:34:20 2013
Steve
Update
VAC
PS will be replaced next week
9506
Fri Dec 20 20:04:01 2013
Steve
Update
VAC
power supply replaced with a short vent
9508
Fri Dec 20 23:00:41 2013
Koji
Update
VAC
power supply replaced with a short vent
I'm leaving the 40m now. IFO is aligned. Everything
look good.
9510
Sat Dec 21 10:53:35 2013
Steve
Update
VAC
power supply replaced with a short vent-pumpdown completed
The recovery- pumpdown reached valve configuration
vacuum normal at 20 hours, cc1 7.7e-6 Torr
9514
Thu Jan 2 10:50:24 2014
Steve
Update
VAC
vacuum monitor is still blank
The date is correct on this monitor.
Last stored RGA scan data Dec 20,
2013
9515
Thu Jan 2 13:35:06 2014
Koji
Update
VAC
vacuum monitor is still blank
We probably need to restart the machine,
but I didn't want to touch c1vac1 and c1vac2.
9516
Fri Jan 3 11:18:41 2014
Steve
Summary
VAC
power supply replaced with a short vent
9550
Mon Jan 13 16:50:55 2014
Steve
Update
VAC
Maglev controller needs service
9562
Tue Jan 21 17:26:59 2014
Jenne
Summary
VAC
Rebooted RGA computer and reset RGA settings
[Jenne, Steve]
Steve noticed that the RGA was not
logging data and that not all the correct
9565
Wed Jan 22 15:24:11 2014
Steve
Summary
VAC
Rga scan after reboot
9570
Thu Jan 23 08:04:04 2014
Steve
Update
VAC
vacuum control screen is blank
There is
9571
Thu Jan 23 13:23:10 2014
Steve
Update
VAC
40m IFO is at atmosphere
9576
Mon Jan 27 09:08:00 2014
Steve
Update
VAC
4 days at atmosphere
9581
Tue Jan 28 11:13:50 2014
Koji
Update
VAC
vacuum monitor is still blank
[Steve Koji]
We
pushed the reset button of c1vac1 and c1vac2
9582
Tue Jan 28 16:26:40 2014
Steve
Update
VAC
vacuum computers are back without safety
9599
Wed Feb 5 08:14:59 2014
Steve
Update
VAC
vacuum computers are back without safety
9604
Wed Feb 5 19:36:50 2014
Steve
Update
VAC
pumpdown at 25 Torr
9605
Wed Feb 5 19:53:51 2014
Steve
Update
VAC
pumpdown stops for the day at 14 Torr
9607
Thu Feb 6 11:14:07 2014
Steve
Update
VAC
pumpdown completed
Pumpdown completed. IR shutter opened
at P1 1 mTorr The block is still in
the beam path.
9615
Mon Feb 10 09:45:53 2014
Steve
Update
VAC
vacuum normal is reached
9622
Tue Feb 11 10:44:15 2014
Steve
Update
VAC
RGA scan at day 6
9644
Tue Feb 18 10:38:55 2014
Steve
Update
VAC
RGA scan at day 13
All normal.
9703
Fri Mar 7 16:13:03 2014
Steve
Update
VAC
pumping speed is recovered
9723
Wed Mar 12 08:40:42 2014
Steve
Update
VAC
RGA scan at day 35
9745
Mon Mar 24 10:41:46 2014
Steve
Update
VAC
RGA scan at day 50