40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 337 of 355  Not logged in ELOG logo
Entry  Sun May 17 21:45:40 2009, rob, Update, ASC, ITMX oplev centered 
Entry  Fri Oct 16 16:08:00 2009, rob, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm 
    Reply  Fri Oct 16 18:46:36 2009, rana, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm Untitled.png
    Reply  Sun Oct 18 16:09:34 2009, rana, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm a.png
Entry  Sun Nov 8 22:50:29 2009, Alberto, Update, ASC, IFO Alignment 
Entry  Mon Jul 12 02:21:01 2010, Koji, Configuration, ASC, Resurrection of MC WFS 
Entry  Wed Dec 22 15:30:47 2010, Osamu, Update, ASC, ETMY oplev fixed 
Entry  Sun Feb 13 16:50:17 2011, kiwamu, Update, ASC, IP_ANG was at wrong ADC xmen.jpg
    Reply  Mon Feb 14 12:37:23 2011, kiwamu, Update, ASC, no signal from IP_ANG_Seg1 
Entry  Tue Feb 15 02:13:16 2011, kiwamu, Summary, ASC, a daytime task : small signals on ETMX OL 
    Reply  Tue Feb 15 03:10:37 2011, kiwamu, Update, ASC, IR beam alignment for Xarm : TRX reduction 
    Reply  Tue Feb 15 06:15:07 2011, Suresh, Update, ASC, no signal from IP_ANG_Seg1 Y-end_beam.JPG
    Reply  Wed Feb 16 02:04:11 2011, kiwamu, Update, ASC, IR beam alignment 
Entry  Fri Feb 25 01:48:54 2011, valera, Update, ASC, mc auto alignment status mcditherlines.pdfmcdecenter.pdfmcmirror.pdf
Entry  Tue May 10 00:31:28 2011, kiwamu, Update, ASC, IFO alignment plan 
Entry  Wed May 11 00:23:21 2011, kiwamu, Update, ASC, Y arm and beam pointing alignment 
Entry  Mon May 30 23:14:27 2011, valera, Update, ASC, Y arm initial alignment 
Entry  Sat Jun 25 04:40:43 2011, Suresh, Update, ASC, WFS1 Transimpedance measurement WFS1_transimpedance.pdfP6250224.JPGP6250223.JPG
Entry  Fri Jul 29 16:25:06 2011, kiwamu, Update, ASC, beam axis and Y arm aligned 
    Reply  Sat Jul 30 06:24:06 2011, kiwamu, Update, ASC, Y arm ASS fixed 
Entry  Sat Jul 30 07:07:28 2011, kiwamu, Update, ASC, MCASS status 
    Reply  Sat Jul 30 21:04:23 2011, kiwamu, Update, ASC, Y arm ASS fixed 
Entry  Mon Aug 1 17:47:37 2011, steve, Update, ASC, what is not working 
Entry  Sat Sep 10 01:36:15 2011, kiwamu, Update, ASC, interferometer coarsely aligned 
Entry  Thu Sep 22 13:56:56 2011, kiwamu, Update, ASC, C1ASS : status update 
    Reply  Mon Sep 26 12:41:27 2011, kiwamu, Update, ASC, C1ASS : status update 
Entry  Thu Sep 29 03:43:20 2011, kiwamu, Update, ASC, wrong channel assignment on IPPOS 
    Reply  Fri Sep 30 01:18:39 2011, kiwamu, Update, ASC, C1ASS : status update 
    Reply  Mon Oct 3 17:57:12 2011, kiwamu, Update, ASC, IPPOS fixed 
Entry  Sat Nov 5 00:04:23 2011, kiwamu, Update, ASC, ASS scripts gone 
    Reply  Sat Nov 5 00:24:13 2011, Suresh, Update, ASC, ASS scripts gone 
    Reply  Sat Nov 5 14:54:59 2011, Koji, Update, ASC, ASS scripts gone 
Entry  Thu Feb 16 09:59:16 2012, steve, Update, ASC, IP- ANG  lastIPang.png
Entry  Tue Jul 17 02:17:50 2012, Jenne, Update, ASC, ASS gains wrong? 
    Reply  Fri Sep 14 18:15:43 2012, rana, Update, ASC, First In Vac Picture 
Entry  Wed Dec 5 03:25:32 2012, Den, Update, ASC, dithering 
Entry  Thu Jan 31 22:14:11 2013, rana, Summary, ASC, Optics lit 
    Reply  Fri Feb 1 12:22:27 2013, Zach, Summary, ASC, Optics lit 
Entry  Thu Apr 18 02:24:58 2013, Den, Update, ASC, dither alignment of yarm OL.pngdither_yarm.pngYARM_CTRL_DITHER.pdfTRY_DITHER.pdf
    Reply  Fri Apr 19 13:28:39 2013, Den, Update, ASC, dither alignment of yarm 
Entry  Fri Apr 19 16:58:59 2013, Jenne, Update, ASC, Arm A2L measurement scripts 90% working again 
Entry  Sat May 11 01:11:52 2013, Koji, Update, ASC, PRC mode stabilization with a shadow sensor at POP Screenshot.png130510_PRMI.pdf
Entry  Wed May 22 17:29:34 2013, Jenne, Update, ASC, QPD for POP ASC tested 
Entry  Tue May 28 17:00:50 2013, Jenne, Update, ASC, Proposed POP path, to be installed this evening CurrentPOPpath.pdfProposedPOPpath.pdf
    Reply  Thu May 30 17:18:58 2013, Jenne, Update, ASC, New POP path 
    Reply  Sat Jun 1 14:14:56 2013, Jenne, Update, ASC, New POP path POX_table_30May2013progress.pdfPOP_QPD_lensSolution.png
    Reply  Fri Jun 14 03:10:40 2013, Jenne, Update, ASC, New POP path - PDs in place, need cabling 
    Reply  Fri Jun 14 17:54:11 2013, Jenne, Update, ASC, New POP path - cabling work 
Entry  Wed Jun 19 01:12:42 2013, Jenne, Update, ASC, model name ASS -> ASC ??? 
    Reply  Wed Jun 19 04:56:07 2013, Koji, Update, ASC, model name ASS -> ASC ??? 
ELOG V3.1.3-