40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 337 of 355  Not logged in ELOG logo
    Reply  Wed Mar 6 08:40:03 2013, Steve, Update, VAC, first scan of this pumpdown pd75m12d.pngpd75mRGA12d.png
Entry  Tue Mar 19 17:00:14 2013, Steve, Update, VAC, large window quote of Cascade  
    Reply  Mon Jun 3 09:46:40 2013, Steve, Update, VAC, RGA scan at day 100 d100Mpd75.pngd100Mpd75p.pngbadguys.png
    Reply  Mon Jul 15 14:12:15 2013, Steve, Update, VAC, RGA scan at day 144 pd75mRGA144d.pngpd75m144d.png
    Reply  Tue Jul 23 08:21:31 2013, Steve, Update, VAC, Vent has started beforVent.pngstartVent.png
    Reply  Tue Jul 23 14:00:03 2013, Steve, Update, VAC, the vent is completed Atm.png5cyl.pngventSum1d.png
Entry  Tue Jul 23 22:55:13 2013, Jenne, Update, VAC, BS, ITMY doors to be opened in the morning 
    Reply  Wed Jul 24 10:35:41 2013, Steve, Update, VAC, BS, ITMY doors are removed beforeDoorsOff.pngparticlecount10d.png
    Reply  Mon Jul 29 16:04:40 2013, Steve, Update, VAC, AC removed acout.pngAlAcACa.jpgAlAcACb.jpg
    Reply  Mon Jul 29 16:15:13 2013, Koji, Update, VAC, AC removed 
Entry  Wed Jul 31 10:27:00 2013, Steve, Update, VAC, instrument grade air is discontinoued 
    Reply  Mon Aug 5 10:50:48 2013, Steve, Update, VAC, RGA background v75bgMd12.png
    Reply  Tue Aug 6 10:06:29 2013, Steve, Update, VAC, Pumpdown is at 500Torr befPd.png
    Reply  Tue Aug 6 16:45:31 2013, Steve, Update, VAC, Pumpdown is completed 8hrPd76.png1mT.png
    Reply  Wed Aug 7 10:51:49 2013, Steve, Update, VAC, Pumpdown at 26hrs 26hr.png14datm.png
    Reply  Wed Aug 7 15:36:29 2013, Steve, Update, VAC, TP2 drypump replaced forelinesPs.jpg
    Reply  Thu Aug 8 07:57:23 2013, Steve, Update, VAC, pumpdown at 48 hrs 48hrsPd76.png
    Reply  Thu Aug 8 10:31:28 2013, Steve, Update, VAC, few reminders of this vent GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg
    Reply  Wed Aug 14 08:24:20 2013, Steve, Update, VAC, pumpdown at day 8 pd76md8.png
    Reply  Fri Aug 16 09:35:18 2013, Steve, Update, VAC, Vacuum Normal state recognition is back VacuumNormal.pngvacValvesDisabled.jpg
    Reply  Mon Aug 19 11:12:54 2013, Steve, Update, VAC, RGA scan at day 13 rgaScan13d.png
    Reply  Wed Aug 28 11:23:41 2013, Steve, Update, VAC, crane repair sheduled 
    Reply  Wed Aug 28 15:41:42 2013, Steve, Update, VAC, RGA scan at day 23 pd75md23.png
    Reply  Thu Sep 5 10:47:58 2013, Steve, Update, VAC, vertex crane folding issue 5mmLess.jpg
    Reply  Fri Sep 6 09:27:10 2013, Steve, Update, VAC, 31 days after pumpdown day31vac.png
    Reply  Mon Sep 9 15:33:06 2013, Steve, Update, VAC, vertex crane repair is scheduled 
    Reply  Tue Sep 10 09:18:22 2013, Steve, Update, VAC, dry pump is getting loud 
    Reply  Tue Sep 10 15:43:01 2013, Steve, Update, VAC, TP3' dry pump is replaced 
    Reply  Mon Sep 16 10:57:11 2013, Steve, Update, VAC, RGA scan at day 41 pd76m41dRGA.pngpd76m41d.png
    Reply  Wed Sep 18 14:57:12 2013, Steve, Update, VAC, vertex crane folding arm removed manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg
    Reply  Fri Sep 20 16:37:30 2013, Steve, Update, VAC, vertex crane folding arm is back on bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg
    Reply  Mon Sep 30 08:53:22 2013, Steve, Update, VAC, vertex crane repair schedule has changed 
    Reply  Wed Oct 2 14:25:39 2013, Steve, Update, VAC, vertex crane is still out of order grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg
    Reply  Wed Oct 9 11:48:10 2013, Steve, Update, VAC, RGA scan at day 65 scanRGApd76m65d.pngpd76m65d.png
    Reply  Thu Nov 7 11:19:04 2013, Steve, Update, VAC, crane work POSTPONED to Monday 
    Reply  Wed Nov 13 08:46:03 2013, Steve, Update, VAC, vertex crane repair completed 
    Reply  Fri Nov 22 16:32:08 2013, Steve, Update, VAC, RGA scan at day 108 RGAscanVacNormal108d.pngday108.pngpd76m110d.png
    Reply  Fri Dec 13 16:34:20 2013, Steve, Update, VAC, PS will be replaced next week hotPSvacRack.jpgfan1X8.jpg
    Reply  Fri Dec 20 20:04:01 2013, Steve, Update, VAC, power supply replaced with a short vent 4hrPumpdown.pngpumpdownAfterHickup.pngPSpumpdown.png
    Reply  Fri Dec 20 23:00:41 2013, Koji, Update, VAC, power supply replaced with a short vent 
    Reply  Sat Dec 21 10:53:35 2013, Steve, Update, VAC, power supply replaced with a short vent-pumpdown completed 20hrsVacNormal.png
    Reply  Thu Jan 2 10:50:24 2014, Steve, Update, VAC, vacuum monitor is still blank Help.pngvacation.png20131220lastRGAscan.png
    Reply  Thu Jan 2 13:35:06 2014, Koji, Update, VAC, vacuum monitor is still blank 
    Reply  Fri Jan 3 11:18:41 2014, Steve, Summary, VAC, power supply replaced with a short vent rebootVENT.png
    Reply  Mon Jan 13 16:50:55 2014, Steve, Update, VAC, Maglev controller needs service 
    Reply  Tue Jan 21 17:26:59 2014, Jenne, Summary, VAC, Rebooted RGA computer and reset RGA settings 
    Reply  Wed Jan 22 15:24:11 2014, Steve, Summary, VAC, Rga scan after reboot Rgascan169dwarmingup.pngBlankMedmMustBeFixed.png
    Reply  Thu Jan 23 08:04:04 2014, Steve, Update, VAC, vacuum control screen is blank pd76m170d2dRgaOn.png
    Reply  Thu Jan 23 13:23:10 2014, Steve, Update, VAC, 40m IFO is at atmosphere 
    Reply  Mon Jan 27 09:08:00 2014, Steve, Update, VAC, 4 days at atmosphere day4atm.pngvent76bgTp3d4.png
ELOG V3.1.3-