8976
|
Wed Aug 7 10:51:49 2013 |
Steve | Update | VAC | Pumpdown at 26hrs |
Cold cathode gauge CC1 -h (horizontal) just coming on 9.2e-5 Torr
P2 is the fore line pressure of the maglev. One can see the 4 Torr load during switching over to turbo pumping.
CC4 5e-9 Torr is the performance of the maglev pumping on the RGA only.
The annuloses are not pumped now. They are closed off to see how much outgassing plus leak they have.
Configuration: vacuum normal, annuloses not pumped
Condition: normal
Precondition: 14 days at atm, IOO chamber north door was taken off as a new entrance, the ETMX chamber was not opened.
What is new in the vacuum system: new P1 pirani gauge, gold plated clean allen wrench and ..........what else was dropped?
Note: the wireless laptop did not fail once all day yesterday. I want to give credit to the person who is responsible for this.
|
8978
|
Wed Aug 7 15:36:29 2013 |
Steve | Update | VAC | TP2 drypump replaced |
TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.
Where are the foreline pressure gauges? These values are not on the vac.medm screen.
The new tip seal dry pump lowered the small turbo foreline pressure 10x
TP2fl after 2 day of pumping 65mTorr |
8984
|
Thu Aug 8 07:57:23 2013 |
Steve | Update | VAC | pumpdown at 48 hrs |
Quote: |
TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.
|
|
8985
|
Thu Aug 8 10:31:28 2013 |
Steve | Update | VAC | few reminders of this vent |
1, Vacuum envelope grounds must be connected all times! After door removal reconnect both cables immediately.
2, The crane folding had a new issue of getting cut as picture shows.
3, Too much oplev light is scattered. This picture was taken just before we put on the heavy door.
4, We were unprepared to hold the smaller side chamber door 29" od of the IOC
5, Silicon bronze 1/2-13 nuts for chamber doors will be replaced. They are not smooth turning.
|
9011
|
Wed Aug 14 08:24:20 2013 |
Steve | Update | VAC | pumpdown at day 8 |
|
9017
|
Fri Aug 16 09:35:18 2013 |
Steve | Update | VAC | Vacuum Normal state recognition is back |
Quote: |
Quote: |
Quote: |
Quote: |
Apparently all of the ION pump valves (VIPEE, VIPEV, VIPSV, VIPSE) opened, which vented the main volume up to 62 mTorr. All of the annulus valves (VAVSE, VAVSV, VAVBS, VAVEV, VAVEE) also appeared to be open. One of the roughing pumps was also turned on. Other stuff we didn't notice? Bad.
|
Several of the suspensions were kicked pretty hard (600+ mV on some sensors) as a result of this quick vent wind. All of the suspensions are damped now, so it doesn't look like we suffered any damage to suspensions.
|
CLOSE CALL on the vacuum system:
Jamie and I disabled V1, VM2 and VM3 gate valves by disconnecting their 120V solenoid actuator before the swap of the VME crate.
The vacuum controller unexpectedly lost control over the swap as Jamie described it. We were lucky not to do any damage! The ion pumps were cold and clean. We have not used them for years so their outgassing possibly accumulated to reach ~10-50 Torr
I disconnected_ immobilized and labelled the following 6 valves: the 4 large ion pump gate valves and VC1, VC2 of the cryo pump. Note: the valves on the cryo pump stayed closed. It is crucial that a warm cry pump is kept closed!
This will not allow the same thing to happen again and protect the IFO from warm cryo contamination.
The down side of this that the computer can not identify vacuum states any longer.
This vacuum system badly needs an upgrade. I will make a list.
|
While I was doing the oil change of the roughing pumps I accidentally touched the 24 V adjustment knob on the power supply.
All valve closed to default condition. I realized that the current indicator was red at 0.2A and the voltage fluctuated from 3-13V
Increased current limiter to 0.4A and set voltage to 24V I think this was the reason for the caos of valve switching during the VME swap.
|
Based on the facts above I reconnected VC1 and VC2 valves. State recognition is working. Ion pumps are turned off and their gate valves are disabled.
We learned that even with closed off gate valves while at atmosphere ion pumps outgass hydrocarbons at 1e-6 Torr level. We have not used them for this reason in the passed 9 rears.
I need help with implementing V1 interlock triggered by Maglev failure signal and-or P2 pressure.
MEDM screen agrees with vacuum rack signs. |
9029
|
Mon Aug 19 11:12:54 2013 |
Steve | Update | VAC | RGA scan at day 13 |
|
9084
|
Wed Aug 28 11:23:41 2013 |
Steve | Update | VAC | crane repair sheduled |
Quote: |
1, Vacuum envelope grounds must be connected all times! After door removal reconnect both cables immediately.
2, The crane folding had a new issue of getting cut as picture shows.
3, Too much oplev light is scattered. This picture was taken just before we put on the heavy door.
4, We were unprepared to hold the smaller side chamber door 29" od of the IOC
5, Silicon bronze 1/2-13 nuts for chamber doors will be replaced. They are not smooth turning.
|
Fred Goldbar of KoneCranes will come 7:30am Wednesday, September 4 to look at this issue.
It is changed to Thursday morning. |
9085
|
Wed Aug 28 15:41:42 2013 |
Steve | Update | VAC | RGA scan at day 23 |
Valve configuration: Vacuum Normal
pd76-m-d23
|
9111
|
Thu Sep 5 10:47:58 2013 |
Steve | Update | VAC | vertex crane folding issue |
[Fred Goldbar, Mike Gerfen, Dennis Coyne and Steve]
We inspected the hinge, 1.25" cross pin and I-beams. It is hard to explain what is causing the folding I-beam corner to jam against the main I-beam.
To limit the motion of the folding I-beam cross pin bushing will be added. This will take a week to complete.
|
9115
|
Fri Sep 6 09:27:10 2013 |
Steve | Update | VAC | 31 days after pumpdown |
Quote: |
Valve configuration: Vacuum Normal
|
|
9117
|
Mon Sep 9 15:33:06 2013 |
Steve | Update | VAC | vertex crane repair is scheduled |
Quote: |
[Fred Goldbar, Mike Gerfen, Dennis Coyne and Steve]
We inspected the hinge, 1.25" cross pin and I-beams. It is hard to explain what is causing the folding I-beam corner to jam against the main I-beam.
To limit the motion of the folding I-beam cross pin bushing will be added. This will take a week to complete.
|
KoneCrane contact John McDaniel (562) 903 - 1371,
Wednesday, September 18, folding I-beam will be removed. KoneCrane will start working at 7:30am and they should be out by 12:30pm
Friday, September 20, reinstalling machined hinge on the I-beam. Same timing schedule as Wednesday. |
9119
|
Tue Sep 10 09:18:22 2013 |
Steve | Update | VAC | dry pump is getting loud |
TP3 foreline's dry pump is getting noisier and noisier. Turbo TP3 is pumping on the annulos. The foreline pressure is 7.2 mTorr and it is not degrading. It was swapped in March 5, 2013
The seal is very good, but the bearing is dying.
|
9120
|
Tue Sep 10 15:43:01 2013 |
Steve | Update | VAC | TP3' dry pump is replaced |
Quote: |
TP3 foreline's dry pump is getting noisier and noisier. Turbo TP3 is pumping on the annulos. The foreline pressure is 7.2 mTorr and it is not degrading. It was swapped in March 5, 2013
The seal is very good, but the bearing is dying.
|
The drypump is replaced at 95,781 hrs on TP3 controller time. The foreline pressure is 30 mTorr and dropping.
It is 13 mTorr after 17 hours of pumping. |
9129
|
Mon Sep 16 10:57:11 2013 |
Steve | Update | VAC | RGA scan at day 41 |
Quote: |
Valve configuration: Vacuum Normal
|
Finally we reached 1.0e-5 Torr, cc1 (h) at day 41. There must be a leak or cold cathode gauge is not reading correctly. The gauge is new. It should not take this long.
All chamber annulos pressures are normal. |
9139
|
Wed Sep 18 14:57:12 2013 |
Steve | Update | VAC | vertex crane folding arm removed |
The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
see elog #9111 |
9146
|
Fri Sep 20 16:37:30 2013 |
Steve | Update | VAC | vertex crane folding arm is back on |
Quote: |
The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
see elog #9111
|
Atm1, The folding arm is back on with 0.1" misalignment at no load in the trolly's way. The other side of the I beam is 0.02" higher than the main beam.. New bushing and pin were greased up with Krytox before installation.
The axial Zerk 1/8" pipe in the pin upper end can not take any fitting. There is no room. It is taped off.
This gap comes down to ~ 1/16" at fully extended arm with 225 lbs load at the end of it.
The present plan is to grind down the the misalignment of 0.1" for a slow-loaded trolly.
Steve Baker of Konacranes will be back to grind down this ridge and load test at 500 lbs on Tuesday, OCT 1, 2013
|
9173
|
Mon Sep 30 08:53:22 2013 |
Steve | Update | VAC | vertex crane repair schedule has changed |
Quote: |
Quote: |
The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
see elog #9111
|
Atm1, The folding arm is back on with 0.1" misalignment at no load in the trolly's way. The other side of the I beam is 0.02" higher than the main beam.. New bushing and pin were greased up with Krytox before installation.
The axial Zerk 1/8" pipe in the pin upper end can not take any fitting. There is no room. It is taped off.
This gap comes down to ~ 1/16" at fully extended arm with 225 lbs load at the end of it.
The present plan is to grind down the the misalignment of 0.1" for a slow-loaded trolly.
Steve Baker of Konecranes will be back to grind down this ridge and load test at 500 lbs on Tuesday, OCT 1, 2013
|
Konecranes rescheduled the completion of the Vertex crane to Wednesday, Oct. 2 |
9185
|
Wed Oct 2 14:25:39 2013 |
Steve | Update | VAC | vertex crane is still out of order |
The smoke alarms were turned off and surrounding areas were covered with plastic.
The folding I-beam was ground down to be in level with the main beam.
Load bearing cable moved into correct position. New folding spring installed.
Crane calibration was done at 500 lbs at the end of the fully extended jib.
Than we realized that the rotating wheel limit switch stopped working.
This means that the crane is still out of order. 
|
9223
|
Wed Oct 9 11:48:10 2013 |
Steve | Update | VAC | RGA scan at day 65 |
Valve configuration: Vacuum Normal |
9359
|
Thu Nov 7 11:19:04 2013 |
Steve | Update | VAC | crane work POSTPONED to Monday |
Quote: |
The smoke alarms were turned off and surrounding areas were covered with plastic.
The folding I-beam was ground down to be in level with the main beam.
Load bearing cable moved into correct position. New folding spring installed.
Crane calibration was done at 500 lbs at the end of the fully extended jib.
Than we realized that the rotating wheel limit switch stopped working.
This means that the crane is still out of order. 
|
New limit switch will be installed tomorrow morning
Konecranes postponed installation Friday morning Nov. 8
Friday 5pm : Konacranes promising to be here 8am Monday, Nov 11
It was rescheduled on Tuesday again for Wednesday, Nov 13 |
9372
|
Wed Nov 13 08:46:03 2013 |
Steve | Update | VAC | vertex crane repair completed |
nullQuote: |
The smoke alarms were turned off and surrounding areas were covered with plastic.
The folding I-beam was ground down to be in level with the main beam.
Load bearing cable moved into correct position. New folding spring installed.
Crane calibration was done at 500 lbs at the end of the fully extended jib.
Than we realized that the rotating wheel limit switch stopped working.
This means that the crane is still out of order. 
|
New limit switch installed and tested. The crane is back in full operational mode. Two spare limit switches on hand. |
9424
|
Fri Nov 22 16:32:08 2013 |
Steve | Update | VAC | RGA scan at day 108 |
Quote: |
Valve configuration: Vacuum Normal
|
|
9467
|
Fri Dec 13 16:34:20 2013 |
Steve | Update | VAC | PS will be replaced next week |
Quote: |
Instrument rack power supplies checked and labeled at present loads.
The vacuum rack Sorensen is running HOT! Their is only 0.3A load at 24V There is plenty of space around it.
It is alarming to me because all vacuum valve positions are controlled by this 24V
|
The temperature went down to room temp with temporary fan in the back. Voltage and current are stable.
Regardless, it will be replaced early next week. |
9506
|
Fri Dec 20 20:04:01 2013 |
Steve | Update | VAC | power supply replaced with a short vent |
Quote: |
Quote: |
Instrument rack power supplies checked and labeled at present loads.
The vacuum rack Sorensen is running HOT! Their is only 0.3A load at 24V There is plenty of space around it.
It is alarming to me because all vacuum valve positions are controlled by this 24V
|
The temperature went down to room temp with temporary fan in the back. Voltage and current are stable.
Regardless, it will be replaced early next week.
|
Koji, Steve
It was a bad experience again with our vacuum system. The valves went crazy as we rebooted the computer. This was required for the swap in of a good 24V power supply.
The IFO was vented to 27 Torr through the annuloses, VA6, V7, Maglev,VM2 and VM1 (VC2 was open too)
I just opened the PSL shutter after a 4 hours pumpdown.
Condition: annuloses are not pumped, the IFO and the RGA are pumped as Atm2 shows
I will be here tomorrow morning to switch over to vacuum normal.
More details later
|
9508
|
Fri Dec 20 23:00:41 2013 |
Koji | Update | VAC | power supply replaced with a short vent |
I'm leaving the 40m now. IFO is aligned. Everything look good.
- The main volume P1=5e-4, CC1=1.4e-5 is still pumped by TP1 and TP2
- RGA P4<0e-4, CC4 2.1e-7, is pumped by TP3
- The annuluses are isolated.
- RP1/2/3 are off. |
9510
|
Sat Dec 21 10:53:35 2013 |
Steve | Update | VAC | power supply replaced with a short vent-pumpdown completed |
The recovery- pumpdown reached valve configuration vacuum normal at 20 hours, cc1 7.7e-6 Torr
Lesson learned: turn all pumps off, close all valves before you reboot ! like you would prepare for AC power shut down.
|
9514
|
Thu Jan 2 10:50:24 2014 |
Steve | Update | VAC | vacuum monitor is still blank |
The date is correct on this monitor.
Last stored RGA scan data Dec 20, 2013
IFO pressure at CC1 5.8e-6 Torr
Valve configuration: Vacuum Normal, confirmable only by manual checking of position indicators and pressure gauge controllers readouts
|
9515
|
Thu Jan 2 13:35:06 2014 |
Koji | Update | VAC | vacuum monitor is still blank |
We probably need to restart the machine, but I didn't want to touch c1vac1 and c1vac2. |
9516
|
Fri Jan 3 11:18:41 2014 |
Steve | Summary | VAC | power supply replaced with a short vent |
Quote: |
Quote: |
The temperature went down to room temp with temporary fan in the back. Voltage and current are stable.
Regardless, it will be replaced early next week.
|
Koji, Steve
It was a bad experience again with our vacuum system. The valves went crazy as we rebooted the computer. This was required for the swap in of a good 24V power supply.
The IFO was vented to 27 Torr through the annuloses, VA6, V7, Maglev,VM2 and VM1 (VC2 was open too)
I just opened the PSL shutter after a 4 hours pumpdown.
Condition: annuloses are not pumped, the IFO and the RGA are pumped as Atm2 shows
I will be here tomorrow morning to switch over to vacuum normal.
More details later
|
Events of the power supply swap:
1, Tested 24V DC ps from Todd
2, Closed V1, VM1 and all annulos valves to create safety net for the reboot. Turbo pumps left on running.
3, Turned computer off
4, Swap power supplies and turned it on
5, Turning the power on of c1vac2 created caos switching of valves. This resulted in a air vent as shown below.
6, VM1 was jammed and it was unable to close. The IOO beam shutter closed and the IFO was venting with air for a few minutes. Maglev did an emergency shut down. TP2's V4 and TP3' V5 closed. RP1 and RP3 roughing pumps turned on, their hose was not connected as usual. The RGA shut down to protect itself.
7, Closed annulos valves, stoped the vent at P1 27 torr as the vacuum control was manually recovered
8, The Maglev and the annuloses were roughed out 500 mtorr . The Maglev was restarted.
9, The IFO pump down followed std procedure from 27 torr. VM1 was moving again as the pressure differential was removed from it.
Remember: next time at atm .....rough down the cryo volume from 27 torr ! |
9550
|
Mon Jan 13 16:50:55 2014 |
Steve | Update | VAC | Maglev controller needs service |
Quote: |
The date is correct on this monitor.
Last stored RGA scan data Dec 20, 2013
IFO pressure at CC1 5.8e-6 Torr
Valve configuration: Vacuum Normal, confirmable only by manual checking of position indicators and pressure gauge controllers readouts
|
The Osaka TG390MCAB maglev turbo pump's controller TC010M has passed the 40,000 hrs of operation. This triggered the " alarm" LED warning light to come on.
It is normal maintenance. Maglev TP-1 is running perfectly. Osaka will send us a loaner-controller that we can use while they do the std maintenance.
I'm thinking of ~ February to do this. |
9562
|
Tue Jan 21 17:26:59 2014 |
Jenne | Summary | VAC | Rebooted RGA computer and reset RGA settings |
[Jenne, Steve]
Steve noticed that the RGA was not logging data and that not all the correct connection lights were on, and he wasn't able to run the "RGAset.py" script (in ...../scripts/RGA/) that sets up the proper parameters.
I looked, and the computer was not mounting the file system. I did a remote shutdown, then Steve went in and pushed the power button to turn the machine back on. After it booted up, it was able to talk to the file system, so I started ..../scripts/RGA/RGAset.py . The first 2 times I ran the script, it reported errors, but the 3rd time, it reported no communication errors. So, now that the computer can again talk to the file system, it should be able to run the cronjob, which is set to take data at 4am every day. Steve will check in the morning to confirm that the data is there. (The last data that's logged is 22Dec2013, 4am, which is right around when Koji reported and then fixed the file system).
|
9565
|
Wed Jan 22 15:24:11 2014 |
Steve | Summary | VAC | Rga scan after reboot |
Quote: |
[Jenne, Steve]
Steve noticed that the RGA was not logging data and that not all the correct connection lights were on, and he wasn't able to run the "RGAset.py" script (in ...../scripts/RGA/) that sets up the proper parameters.
I looked, and the computer was not mounting the file system. I did a remote shutdown, then Steve went in and pushed the power button to turn the machine back on. After it booted up, it was able to talk to the file system, so I started ..../scripts/RGA/RGAset.py . The first 2 times I ran the script, it reported errors, but the 3rd time, it reported no communication errors. So, now that the computer can again talk to the file system, it should be able to run the cronjob, which is set to take data at 4am every day. Steve will check in the morning to confirm that the data is there. (The last data that's logged is 22Dec2013, 4am, which is right around when Koji reported and then fixed the file system).
|
We are venting tomorrow. This give us an opportunity to fix sick vacuum controller computer. Jamie volunteered.
Remember to rough down cryo and ion pump volumes. Their pressure can be at 1 Torr range after years of accumulated outgassing. Without total valve controls it is dangerous to have these air pockets. Some of their gate valves can be leaking and that would explane the slower pumpdown speed.
|
9570
|
Thu Jan 23 08:04:04 2014 |
Steve | Update | VAC | vacuum control screen is blank |
There is BLANK VacControl_BAK.adl screen only.
I can move a valve by disconnecting it's solenoid power if it's position is normally open.
I will close V1 and check computer cable connections and move on with manual - hand disconnect ea valve to be moved into the right position for vent. Valve positions will be confirmed by looking manual indicators on valves. |
9571
|
Thu Jan 23 13:23:10 2014 |
Steve | Update | VAC | 40m IFO is at atmosphere |
Quote: |
There is BLANK VacControl_BAK.adl screen only.
I can move a valve by disconnecting it's solenoid power if it's position is normally open.
I will close V1 and check computer cable connections and move on with manual - hand disconnect ea valve to be moved into the right position for vent. Valve positions will be confirmed by looking manual indicators on valves.
|
The 40m vacuum envelope vent is completed with instrument grade air.
Valve configuration: chamber open, RGA is pumped through VM3 by TP3, |
9576
|
Mon Jan 27 09:08:00 2014 |
Steve | Update | VAC | 4 days at atmosphere |
|
9581
|
Tue Jan 28 11:13:50 2014 |
Koji | Update | VAC | vacuum monitor is still blank |
[Steve Koji]
We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.
First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back. |
9582
|
Tue Jan 28 16:26:40 2014 |
Steve | Update | VAC | vacuum computers are back without safety |
Quote: |
[Steve Koji]
We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.
First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back.
|
1, Reset works
2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!
It's may be the time to go back to an isolated, vacuum controller only computer.
The present valve configuration at Atm1
a, all annuloses are vented
b, valve cables disconnected at: VC1 and 4 IP gate valves
c, the RGA is off and it is pumped by the Maglev through VM2
d, cryo pump is being roughed with TP3 It's outgassing rate was 25 mTorr / min
e, Roughing hose is disconnected |
9599
|
Wed Feb 5 08:14:59 2014 |
Steve | Update | VAC | vacuum computers are back without safety |
Quote: |
1, Reset works
2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!
It's may be the time to go back to an isolated, vacuum controller only computer.
The present valve configuration at Atm1
a, all annuloses are vented
b, valve cables disconnected at: VC1 and 4 IP gate valves
c, the RGA is off and it is pumped by the Maglev through VM2
d, cryo pump is being roughed with TP3 It's outgassing rate was 25 mTorr / min
e, Roughing hose is disconnected
|
Vacuum checks before pump down:
1, check intermittent contact issue in black relay box
2, reconnect cable to ion pumps and vent them to atm before pump down
3, repeat power shutdown-reboot at atmosphere |
9604
|
Wed Feb 5 19:36:50 2014 |
Steve | Update | VAC | pumpdown at 25 Torr |
Quote: |
[Steve, Manasa]
I checked the alignment one last time. The arms locked, PRM aligned, oplevs centered.
We went ahead and put the heavy doors ON. Steve is pumping down now!
|
The ion pumps were vented just before pumpdown and their gate valves were opened.
This is an effort to minimize a possible leak through their gates.
Is there a volunteer who goes home late and would close off the roughing? tonight |
9605
|
Wed Feb 5 19:53:51 2014 |
Steve | Update | VAC | pumpdown stops for the day at 14 Torr |
|
9607
|
Thu Feb 6 11:14:07 2014 |
Steve | Update | VAC | pumpdown completed |
Pumpdown completed. IR shutter opened at P1 1 mTorr The block is still in the beam path.
Remember to protect MCR pd before crack up the PSL power.
The ion pump gate valves were just closed by cc1 triggered interlock
The cry pump was "regenerated" during the vent and it's outgassing rate minimized.
CC3 cold cathode gauge was replaced.
Valve configuration for week end:
1, VA6 disconnected to avoid accidental venting the IFO through the annulos
2, VC2 disconnected to insure that the cryo stays closed
3, RGA is not running, It's pressure limit 1e-5 Torr
|
9615
|
Mon Feb 10 09:45:53 2014 |
Steve | Update | VAC | vacuum normal is reached |
Quote: |
Pumpdown completed. IR shutter opened at P1 1 mTorr The block is still in the beam path.
Remember to protect MCR pd before crack up the PSL power.
The ion pump gate valves were just closed by cc1 triggered interlock
The cry pump was "regenerated" during the vent and it's outgassing rate minimized.
CC3 cold cathode gauge was replaced.
Valve configuration for week end:
1, VA6 disconnected to avoid accidental venting the IFO through the annulos
2, VC2 disconnected to insure that the cryo stays closed
3, RGA is not running, It's pressure limit 1e-5 Torr
|
Valve configuration: Vacuum Normal is reached in really 4 days if we do not count overnight rest of roughing.
VA6 and VC2 are reconnected. I'm turning on the RGA next
All 4 ion pumps were vented with air and pumped down to ~ 1e-4 Torr
Ion pumps gate valve control cables are connected and their pumps are disconnected.
The black relay box was tested repeatedly and it stopped misbehaiving.
We were at atmosphere for 13 days. Chamber BS, ITMX, ITMY and ETMY were opened.
Al foil "cups" were placed on the back side OSEMs of PRM. |
9622
|
Tue Feb 11 10:44:15 2014 |
Steve | Update | VAC | RGA scan at day 6 |
|
9644
|
Tue Feb 18 10:38:55 2014 |
Steve | Update | VAC | RGA scan at day 13 |
All normal.
|
9703
|
Fri Mar 7 16:13:03 2014 |
Steve | Update | VAC | pumping speed is recovered |
Quote: |
Valve configuration: Vacuum Normal is reached in really 4 days if we do not count overnight rest of roughing.
VA6 and VC2 are reconnected. I'm turning on the RGA next
All 4 ion pumps were vented with air and pumped down to ~ 1e-4 Torr
Ion pumps gate valve control cables are connected and their pumps are disconnected.
The black relay box was tested repeatedly and it stopped misbehaiving.
We were at atmosphere for 13 days. Chamber BS, ITMX, ITMY and ETMY were opened.
Al foil "cups" were placed on the back side OSEMs of PRM.
|
Pd 76 and 77 are compared at 30 days of pumping. We spend 13-14 days at atmosphere before each.
Pump down 76 was with leaky ion pump gate valve. The ion pumps are not in use for years so they accumulated some higher pressure PLUS the valve switching caos at computer reboot most likely
increased the ion pumps pressures to about 10-20 torr
I think one of the ion pump gate valve was not sealing well. This leak was holding back pump down speed at pd76 |
9723
|
Wed Mar 12 08:40:42 2014 |
Steve | Update | VAC | RGA scan at day 35 |
|
9745
|
Mon Mar 24 10:41:46 2014 |
Steve | Update | VAC | RGA scan at day 50 |
|
9746
|
Mon Mar 24 19:42:12 2014 |
Charles | Frogs | VAC | Power Failure |
The 40m experienced a building-wide power failure for ~30 seconds at ~7:38 pm today.
Thought that might be important... |
9749
|
Tue Mar 25 14:52:57 2014 |
steve | Update | VAC | vacuum is recovered |
Out gassing plus leak rate 0.15 mTorr / hour
The pressure rose to 2.5 mTorr in 17 hours
V1 was opened at 1:56pm
VM2 opened at 2:10 so the RGA region is back to 1e-5 torr
|