ID |
Date |
Author |
Type |
Category |
Subject |
10075
|
Thu Jun 19 17:11:52 2014 |
steve | Update | PEM | it is warmer today | The PSL HEPA was running at 30VAC-variac. It is 1 degree C warmer than usual. The HEPA fan motor turned up to 60 V |
Attachment 1: warmertoday.png
|
|
10081
|
Fri Jun 20 14:42:57 2014 |
steve | Update | SUS | vac illuminators turned off | |
10131
|
Mon Jul 7 08:13:41 2014 |
steve | Update | General | yes,there was firework | |
Attachment 1: 8days.png
|
|
10350
|
Fri Aug 8 11:22:35 2014 |
steve | Summary | SUS | oplev laser summary |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
10362
|
Mon Aug 11 10:23:39 2014 |
steve | Summary | SUS | oplev laser summary updated |
Quote: |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
May 13, 2014 ETMX, .............laser in place 90 d
May 22, 2012 ETMY,
Oct. 7, 2013 ETMY, LT 503 d or 1.4 y............bad beam quality ?
Aug. 8, 2014 ETMY, .............laser in place 425 days or 1.2 y
|
10518
|
Thu Sep 18 10:08:07 2014 |
steve | Summary | SUS | oplev laser summary updated |
Quote: |
Quote: |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
May 13, 2014 ETMX, .............laser in place 90 d
May 22, 2012 ETMY,
Oct. 7, 2013 ETMY, LT 503 d or 1.4 y............bad beam quality ?
Aug. 8, 2014 ETMY, .............laser in place 425 days or 1.2 y
|
Sept. 5, 2014 new 1103P, sn P893516 installed at SP table for aLIGO oplev use qualification
|
10523
|
Mon Sep 22 10:18:58 2014 |
steve | Update | PEM | lab temperatures |
|
Attachment 1: summerheat.png
|
|
10560
|
Thu Oct 2 14:36:52 2014 |
steve | Update | PEM | oil drops on vertex crane |
Quote: |
KroneCrane Fred inspected and certified the 3 40m cranes for 2014. The vertex crane crane was load tested at fully extended position.
|
Small oil drops were found during prevent inspection of the vertex crane. They were wiped off. It took 231 days to grow this size. |
Attachment 1: VertexOilDrops.jpg
|
|
10665
|
Tue Nov 4 10:40:46 2014 |
steve | Update | PEM | lab temperatures and particle counts |
|
Attachment 1: PEM100d.png
|
|
10761
|
Mon Dec 8 09:03:49 2014 |
steve | Update | PEM | air cond maintenance tomorrow morning |
AC maintenance is scheduled from 8am till 11am tomorrow morning. |
10773
|
Wed Dec 10 14:26:13 2014 |
steve | Update | PEM | air cond maintenance and particle plot |
Quote: |
AC maintenance is scheduled from 8am till 11am tomorrow morning.
|
IFO air condition maintenance will continue tomorrow morning and it should be finished by 11:30AM
We have new guys taking over this job: Sal and Chris so it takes longer. The units will be shut down for a bit.
They will not enter the IFO lab. The CES housed units will be worked on. |
Attachment 1: 05.png
|
|
11083
|
Fri Feb 27 10:25:24 2015 |
steve | Update | Cameras | quad picture problem | MUX input 7 to ITMXF camera cable was replaced by temporary cable labeled as 888
The problem remains to be the same black stripe at the bottom of the image The single picture is OK. |
Attachment 1: quadMUX.jpg
|
|
11148
|
Thu Mar 19 17:11:32 2015 |
steve | Summary | SUS | oplev laser summary updated | March 19, 2015 2 new JDSU 1103P, sn P919645 & P919639 received from Thailand through Edmond Optics. Mfg date 12/2014............as spares |
11178
|
Fri Mar 27 10:38:40 2015 |
steve | Update | VAC | vac rack UPS battery replaced | Batteries replaced after 3.5 years with Amstron AP-1250F2, 8x 12V 6Ah
Quote: |
APC Smart -UPS 2200 model: SUA2200RM2U batteries were replaced by compatible RBC43, 8x 12V5A
|
|
Attachment 1: UPSvac.jpg
|
|
11227
|
Mon Apr 20 16:42:48 2015 |
steve | Update | SUS | PRM and BS oplev laser replaced | The laser below is dead. JDSU 1103P, SN P845655 lived for 3.5 years.
Quote: |
JDSU 1103P died after 4 years of service. It was replaced with new identical head of 2.9 mW output. The power supply was also changed.
The return spots of 0.04 mW 2.5 mm diameter on qpds are BS 3,700 counts and PRM 4,250 counts.
|
It was replaced by JDSU P/N 22037130,( It has a new name for 1103P Uniphase ) sn P919639 of mfg date 12-2014
Beam shape at 5 m nicely round. Output power 2.8 mW of 633 nm
BS spot size on qpd ~1 mm & 60 micro W
PRM spot size on qpd ~1 mm & 50 micro W |
Attachment 1: newOplevLaser.png
|
|
11792
|
Fri Nov 20 09:45:39 2015 |
steve | Summary | SUS | oplev laser summary |
Quote: |
Quote: |
May 13, 2014 ETMX, .............laser in place 90 d
May 22, 2012 ETMY,
Oct. 7, 2013 ETMY, LT 503 d or 1.4 y............bad beam quality ?
Aug. 8, 2014 ETMY, .............laser in place 425 days or 1.2 y
|
Sept. 5, 2014 new 1103P, sn P893516 installed at SP table for aLIGO oplev use qualification
|
|
Attachment 1: oplev_summery.png
|
|
12014
|
Tue Mar 1 09:37:15 2016 |
steve | Update | VAC | vac rack UPS batteries replaced | Amstron batteries replaced after 11 months with SP-12-5.5HR, 2 years warranty from replaceUPSbattery.com
Quote: |
Batteries replaced after 3.5 years with Amstron AP-1250F2, 8x 12V 6Ah
Quote: |
APC Smart -UPS 2200 model: SUA2200RM2U batteries were replaced by compatible RBC43, 8x 12V5A
|
|
Note: the replace battery LED did not go out ( well pasted 24 hrs ) till the self test bottom was hold down for 2-3 sec |
Attachment 1: vacRackBat.jpg
|
|
12054
|
Wed Mar 30 11:35:24 2016 |
steve | Update | safety | BS visitor's viewport is protected with lexan |
Quote: | The four horizontal viewports of arms are protected
by 3/8" thick, 8.5" OD Lexan disk of MR10 Polycarbonate.
ITMX, ETMX, ITMY and ETMY ccd cameras are not focused now. |
BS visitor's viewport glass is now covered with Lexan MR10
Note:
this Lexan cover is in vertical orientation so becomes lose when the black anodized cover is removed.
It needs to be held in place while it's housing is taken off. |
12125
|
Mon May 23 10:55:49 2016 |
steve | Summary | SUS | ITMX oplev laser replaced |
May 23, 2016 ITMX dead He/Ne laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output 2.6 mW, nicely round beam quality at 15 meters.
Power just before viewport 1 mW, returning light on qpd 154 microW = 7,500 counts
|
Attachment 1: ITMXoplev.png
|
|
12126
|
Mon May 23 15:51:32 2016 |
steve | Summary | SUS | oplev laser summary updated |
Quote: |
Quote: |
Quote: |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
May 13, 2014 ETMX, .............laser in place 90 d
May 22, 2012 ETMY,
Oct. 7, 2013 ETMY, LT 503 d or 1.4 y............bad beam quality ?
Aug. 8, 2014 ETMY, .............laser in place 425 days or 1.2 y
|
Sept. 5, 2014 new 1103P, sn P893516 installed at SP table for aLIGO oplev use qualification
|
May 23, 2016 ITMX dead laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output output 2.6 mW, nicely round beam quality at 15 meters. |
Attachment 1: oplSum.png
|
|
12341
|
Wed Jul 27 11:40:48 2016 |
steve | Summary | SUS | oplev laser summary updated |
Quote: |
Quote: |
Quote: |
Quote: |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
May 13, 2014 ETMX, .............laser in place 90 d
May 22, 2012 ETMY,
Oct. 7, 2013 ETMY, LT 503 d or 1.4 y............bad beam quality ?
Aug. 8, 2014 ETMY, .............laser in place 425 days or 1.2 y
|
Sept. 5, 2014 new 1103P, sn P893516 installed at SP table for aLIGO oplev use qualification
|
May 23, 2016 ITMX dead laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output output 2.6 mW, nicely round beam quality at 15 meters.
|
July 27, 2016 2 new 1103P from Edmonds in: P947034 & P947039, manf. date April 2016, |
12498
|
Fri Sep 16 14:15:28 2016 |
steve | Update | PEM | partical counts | South end flow bench and both clean room assembly flow benches measured zero counts for 0.3 and 0.5 micron size particales.
The counting efficiency of 0.5 micron is 100%
location
|
0.3 micron particles / cf min
|
0.5 micron particles / cf min
|
counter
MET
ONE
|
effect |
ITMY table |
35,000 |
3,000 |
#3 |
|
ETMY table |
35,000 |
3,000 |
#3 |
|
ITMX table |
24,000 |
2,400 |
#3 |
PSL HEPA at 50V |
ITMX wall mounted |
- |
2,500 |
#1 |
|
ETMX work bench |
5,000 |
600 |
#3 |
flow bench on |
The PSL HEPA performance was measured at the center of the table with MET ONE #3
Voltage Variac |
particles /cf min |
particles /cf min |
particle size |
0.3 micron |
0.5 micron |
60 |
0 |
0 |
50 |
10 |
0 |
40 |
1,400 |
110 |
20 |
1,400 |
100 |
|
Attachment 1: 80days.png
|
|
12553
|
Wed Oct 12 15:01:22 2016 |
steve | Update | SUS | SOS ITM baffles plates are ready | The two 40 mm apeture baffles at the ends were replaced by 50 mm one. ITM baffles with 50 mm apeture are baked ready for installation.
Quote: |
Green welding glass 7" x 9" shade #14 with 40 mm hole and mounting fixtures are ready to reduce scatter light on SOS
PEEK 450CA shims and U-shaped clips will keep these plates damped.
|
|
Attachment 1: baffle7x9_1.5.jpg
|
|
Attachment 2: baffle_holder.jpg
|
|
Attachment 3: baffle_top_view.jpg
|
|
12656
|
Fri Dec 2 10:57:08 2016 |
steve | Update | PEM | door seal replaced | The south end door leaky weather seals replaced.
The aim is here to get some overpressure inside / outside so the lab partical count would not depend on outside condition.
|
Attachment 1: 1_year_PEM.png
|
|
12753
|
Wed Jan 25 10:46:58 2017 |
steve | Summary | SUS | oplev laser summary updated | Oct. 5, 2015 ETMY He/Ne replaced by 1103P, sr P919645, made Dec 2014, after 2 years
Jan. 24, 2017 ETMY He/Ne replaced by 1103P, sr P947049, made Apr 2016, after 477 hrs running hot |
Attachment 1: oplev_sums.png
|
|
12811
|
Wed Feb 8 10:16:39 2017 |
steve | Update | SUS | clipping ITMX oplev | The ITMX oplev beam is clipping. It will be corected with locked arm
|
Attachment 1: ITMX_oplev_clipping.jpg
|
|
Attachment 2: ITMX_clipping.jpg
|
|
12836
|
Fri Feb 17 10:56:12 2017 |
steve | Update | PEM | particle counter moved into PSL enclousure | The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.
The HEPA filter speed at the Variac was turned down to 20V from 40
This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.
|
Attachment 1: from_here.jpg
|
|
Attachment 2: to_here.jpg
|
|
Attachment 3: PSL_particles.png
|
|
12841
|
Tue Feb 21 10:08:35 2017 |
steve | Update | PEM | noisy morning | Our new janitor Francisco is started working in IFO room today.
Quote: |
The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.
The HEPA filter speed at the Variac was turned down to 20V from 40
This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.
|
Large film crews are working just out side the north west corner of the lab. They started around ~ 5:30am Do not plan on working late tonight.
ETMX sus damping restored.
C1:PSL-FSS_RMTEMP, C1:PSL-PMC_PMCTRANSPD and C1:PEM-count_temp channels are not reading since Friday
|
Attachment 1: outside_activity.png
|
|
12844
|
Wed Feb 22 08:54:17 2017 |
steve | Update | PEM | PSL enclousure particle count | ETMX sus damping recovered. PSL enclousure is dusty at 20V rotation speed. Rainy days as outside condition.
Quote: |
The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.
The HEPA filter speed at the Variac was turned down to 20V from 40
This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.
|
|
Attachment 1: dusty__PSL.png
|
|
12855
|
Tue Feb 28 08:04:48 2017 |
steve | Update | PEM | ETMX damping recovered | ETMX sus damping recovered.
Note: The giant metal garbage container was moved from the south west corner of CES months ago.
Quote: |
ETMX sus damping recovered. PSL enclousure is dusty at 20V rotation speed. Rainy days as outside condition.
|
|
Attachment 1: ETMX.png
|
|
12895
|
Mon Mar 20 17:12:08 2017 |
steve | Update | PEM | particle counter inside of PSL enclousure | The logging script is multiplying by 100 instead of 10 !
Quote: |
The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.
The HEPA filter speed at the Variac was turned down to 20V from 40
This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.
|
|
Attachment 1: enclousure_partical_count.png
|
|
13181
|
Thu Aug 10 09:10:55 2017 |
steve | Update | General | dataviewer is recovering | It can look back 7 days trends now. There is still no vacuum channels. I can bring back the channels through the restore directory, but there are no data. |
Attachment 1: 7dm.png
|
|
13261
|
Mon Aug 28 10:51:21 2017 |
steve | Update | SUS | ETMX damping recovered | |
Attachment 1: ETMX_restored.png
|
|
13695
|
Wed Mar 21 10:00:35 2018 |
steve | Update | General | projector light bulb replaced | Light bulb replaced.
Quote: |
Bulb went out ~10am today. Looks like the lifetime of this bulb was <100 days.
Steve: bulb is arriving next week
|
|
13861
|
Fri May 18 07:41:01 2018 |
steve | Update | SUS | clipping ITMX oplev | The ITMX oplev still clipping
Quote: |
The ITMX oplev beam is clipping. It will be corected with locked arm
|
|
14048
|
Tue Jul 10 14:20:09 2018 |
steve | Update | General | projector light bulb replaced | Bulb replaced at day 110 We have now spare now.
|
4963
|
Tue Jul 12 17:30:24 2011 |
steve, | Update | SUS | BS oplev spectra |
I repeated the BS oplev spectrum today and I do not understand why it does look different. I did it as Kiwamu describes it in entry#4948 The oplev servo was left ON! |
Attachment 1: BS_oplev.jpg
|
|
4966
|
Thu Jul 14 09:38:50 2011 |
steve, | Update | SUS | BS oplev spectra |
Quote: |
I repeated the BS oplev spectrum today and I do not understand why it does look different. I did it as Kiwamu describes it in entry#4948 The oplev servo was left ON!
|
It is working today! Finally I repeated the BS spectra, that we did with Kiwamu last week |
Attachment 1: BS_oplev.jpg
|
|
4967
|
Thu Jul 14 15:27:08 2011 |
steve, | Update | SUS | SUS oplev spectras |
Quote: |
Quote: |
I repeated the BS oplev spectrum today and I do not understand why it does look different. I did it as Kiwamu describes it in entry#4948 The oplev servo was left ON!
|
It is working today! Finally I repeated the BS spectra, that we did with Kiwamu last week
|
The optical levers were centered during these measurements without the reference of locked cavities. They have no reference value now.
SRM sus need some help. ITMX is showing pitch/yaw modes of the pendulum .....OSEM damping is weak? |
Attachment 1: BS_oplev.jpg
|
|
Attachment 2: PRM_oplev.jpg
|
|
Attachment 3: ITMX_oplev.jpg
|
|
Attachment 4: ETMX_oplev.jpg
|
|
Attachment 5: ETMY_oplev.jpg
|
|
Attachment 6: SRM_oplev.jpg
|
|
Attachment 7: ITMY_oplev_b.jpg
|
|
1964
|
Thu Sep 3 10:19:35 2009 |
steve, alberto | Update | PEM | particle counts and burning hillsides | The San Gabriel mountain has been on fire for 6 days. 144,000 acres of beautiful hillsides burned down and it's still burning. Where the fires are.
The 40m lab particle counts are more effected by next door building-gardening activity than the fire itself.
This 100 days plot shows that. |
Attachment 1: fire6d.jpg
|
|
Attachment 2: 40mgarden.JPG
|
|
Attachment 3: 40mgarden2.JPG
|
|
Attachment 4: RBLOG-FIRE-SKY.JPG
|
|
4947
|
Wed Jul 6 16:44:37 2011 |
steve, kiwamu | Update | SUS | BS oplev spectra | Healthy BS oplev |
Attachment 1: BS.jpg
|
|
5590
|
Fri Sep 30 18:35:42 2011 |
steve, kiwamu | Update | VAC | vacuum set for poweroutage | We did the following:
1, closed V1, VM1, annuloses: VASE, VASV, VABS, VAEV, VAEE and VA6
2, stop rotation of Maglev-TP1, waited to decellerate and turned off power to it
3, closed V4, stoped rotation of TP2, waited to decellerate and turned power off
4, opened VM3 to RGA that is still running
I will come in tomorrow 9-10am to restart pumping. |
Attachment 1: prepforpoweroutage.png
|
|
3138
|
Tue Jun 29 17:10:49 2010 |
steve, rana | Update | VAC | slow pumpdown started | The folding crane was fixed and tested this morning by the NNN rigging company. Pictures will be posted by Steve in the morning.
Afterwards, the ITM-east door was installed, jam-nuts checked. No high voltage was on for the in-vac PZTs.
The annulus spaces were roughed down to 350mTorr by Roughing Pump RP1. For this operation, we removed the low flow valve from the RP1 line.
After the spaces came down to ~400 mTorr, we closed their individual valves.
Warning: The VABSSC1 and VABSSC0 valves are incorrect and misleadingly drawn on the Vacuum overview screen.
We then:
- Closed V6 (valve between RP1 and the annulus line).
- Turned off RP1 from the MEDM screen.
- Installed the soft -starting butterfly valve.
- Turned on RP1.
- Opened V3.
- Closed VV1 (at the last minute - this is a vent valve and must be checked before each pumpdown)
- and pumpdown was started with a 3/4 turn opening of manual valve RV1.
Our idea is to have a much slower pumpdown this time than the last time when we had a hurricane kick up the dust. Looks like it worked, but next time we should do only 1/2 turn. |
3140
|
Tue Jun 29 23:49:18 2010 |
steve, rana | Update | VAC | slow pumpdown started | 
The pumpdown started at 4 PM (2300 UTC). At 10 PM, we (Jenne, Jan, and I) opened up the RV1 valve to full open. That's the second inflection point in the plot. |
3169
|
Wed Jul 7 17:05:30 2010 |
steve, rana | Update | SAFETY | Summary of Crane Damage/Malfunction | The 1 Ton yellow crane support beam jammed up at Friday morning, June 25.
The 40m vertex crane has a folding I-beam support to reach targeted areas. The rotating I-beam is 8 ft long. The folding extension arm gives you another 4 ft.
The 12 ft full reach can be achieved by a straightening of the 4 ft piece. There is a spring loaded latch on the top of the I-beam that locks down when the two I-beams align.
This lock joins the two beams into one rigid support beam for the jib trolley to travel. The position of this latch is visible when standing below, albeit not very well.
To be safe it is essential that this latch is locked down fully before a load is put on the crane.
We were preparing to pump down the 40m vacuum system on Friday morning. The straight alignment of the 8 and 4 ft piece made us believe that
the support beams were locked. In reality, the latch was not locked down. The jib trolley was driven to the end of the 12 ft I-beam. The 200 lbs ITM-east door was lifted
when the 4 ft section folded 50 degrees around the pivot point. This load of door + jib-trolley + 4 ft I-beam made the support beam sag about 6 inches
The door was removed from the jib hoist with the blue Genie-lift. The sagging was reduced to ~3".
The Genie-lift platform was raised to support the sagging crane jib-trolley. The lab was closed off to ensure safety and experts were called in for consultation. It was decided to bring in professional riggers.
Halbert Brothers, Inc. rigging contractor came to the lab Tuesday morning to fix the crane. The job was to unload the I-beam with safety support below. They did a very good job.
The static deformation of I-beams sprung back to normal position. There are some deformation of the I-beam ~2 mm where the beams were jammed under load.
It is not clear if this is a new deformation or if the crane sections have always been mis-aligned by a couple of mm.
The crane was tested with 450 lbs load at 12 ft horizontal travel position. The folding of I-beams were repeatedly tested for safe operation. Its a 1 ton crane, but we tested it with 450 lbs because that's what we had on hand.
We're working on the safety upgrade of this lift to prevent similar accident from happening.
Pictures below:
Atm 1) load testing 2007
Atm 2) jammed-sagging under ~400 lbs, horizontal
Atm.3) jammed-folded 50 degrees, vertical
Atm.4) static deformation of I-beams
Atm.5) unloading in progress with the help of two A-frames
Atm.6) it is unloaded
Atm.7-8) load testing
Atm.9) latch locked down for safe operation
Atm.9) zoom in of the crane sections misalignment |
Attachment 1: DSC_0026_00.JPG
|
|
Attachment 2: P1060408.JPG
|
|
Attachment 3: P1060415.JPG
|
|
Attachment 4: P1060413.JPG
|
|
Attachment 5: P1060421.JPG
|
|
Attachment 6: P1060423.JPG
|
|
Attachment 7: P1060441.JPG
|
|
Attachment 8: P1060436.JPG
|
|
Attachment 9: P1060425.JPG
|
|
Attachment 10: P1060432.JPG
|
|
1857
|
Fri Aug 7 16:11:11 2009 |
steve, rob | Configuration | VAC | IFO pressure rose to 2.3 mTorr |
Quote: |
IFO pressure was 2.3 mTorr this morning,
The Maglev's foreline valve V4 was closed so P2 rose to 4 Torr. The Maglev was running fine with V1 open.
This is a good example for V1 to be closed by interlock, because at 4 Torr foreline pressure the compression ratio for hydrocarbones goes down.
V4 was closed by interlock when TP2 lost it's drypump. The drypump's AC plug was lose.
To DO: set up interlock to close V1 if P2 exceeds 1 Torr
|
We added C1:Vac-CC1_pressure to the alarm handler, with the minor alarm at 5e-6 torr and the major alarm at 1e-5 torr. |
4301
|
Tue Feb 15 11:57:06 2011 |
steve, valera | Configuration | PSL | PMC swap | We swapped the PMC s/n 2677 for s/n lho006.
The table below summarizes the power levels before and after the PMC swap.
|
old |
new |
Ptrans |
1.32 W |
1.42 W |
Transmission |
85 % |
91.5 % |
Refl PDDC locked/unlocked |
5.0 % |
4.3 % |
Loss |
7-8 % |
2-3 % |
Leakage out of the back |
10 mW |
0.3 mW |
- The power into the PMC (1.67 W) was measured with Scietech bolometer before the first steering PMC mirror. The leakage through the steering mirrors was measured with Ophir power meter to be 12+8 mW. There is also a lens between the mirrors which was not measured.
- The power through the PMC was measured after the doubler pick off (105 mW), steering mirror (4 mW), and lens (not measured).
- The estimated reflection from four lens surfaces is 1-2% hence 1% uncertainty in the losses in the table.
- The beams into the PMC and on REFL PD were realigned. The beams downstream of the PMC are blocked as we did not realigned the PMC and doubler paths.
- The trans PD ND filters were removed. The VDC=1.28 V now.
- The NPRO current is 2.102 A
Atm 1 old
Atm2 new |
Attachment 1: P1070421.JPG
|
|
Attachment 2: P1070423.JPG
|
|
3148
|
Wed Jun 30 15:24:04 2010 |
steve,kiwamu | Update | VAC | slow pumpdown copmlete |
Quote: |

The pumpdown started at 4 PM (2300 UTC). At 10 PM, we (Jenne, Jan, and I) opened up the RV1 valve to full open. That's the second inflection point in the plot.
|
Atm 2 is showing the butterfly valve that closes down down the orifice at higher pressure to slow down the pumping speed.
See elog entry #2573
|
Attachment 1: slowpd.jpg
|
|
Attachment 2: butterfly.JPG
|
|
539
|
Wed Jun 18 16:37:54 2008 |
steve,rana | Update | SAFETY | CO2 test in the east arm | The CO2 laser and table are in the east arm for characterization of the mechanics. We
will not be operating it until we have an SOP (which is being written). No worries. |
Attachment 1: co2.png
|
|
549
|
Fri Jun 20 08:30:27 2008 |
stiv | Update | Photos | 40m summer line up 2008 | atm1: John, Alberto, Yoichi, Koji, Masha, and Sharon
atm2: surf students Max of CIT, Sharon of MIT, Masha of Harvard, Eric of CIT not shown |
Attachment 1: P1020559.png
|
|
Attachment 2: P1020560.png
|
|
|