Sat Jul 31 14:59:33 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown
|
Sat Jul 31 22:35:01 2010, Koji, Update, VAC, Vac-P1 still 1.2mtorr
|
Sun Aug 1 18:50:35 2010, Koji, Update, VAC, P1 = 0.48 torr
|
Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed
|
Mon Sep 27 08:59:50 2010, steve, Configuration, VAC, slow vent has started
|
Tue Sep 28 00:07:45 2010, kiwamu, Configuration, VAC, Re: slow vent has started
|
Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened
|
Mon Oct 4 19:48:00 2010, yuta, Update, VAC, several mirrors installed to ITMX/BS chamber 
|
Tue Oct 5 17:39:21 2010, steve, Configuration, VAC, west access connector removed
|
Tue Oct 5 21:22:46 2010, yuta, Update, VAC, green beam reached PSL table
|
Mon Nov 15 16:09:44 2010, Jenne, Update, VAC, ETMX, ETMY, ITMY chambers opened
|
Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition
|
Tue Dec 21 16:20:09 2010, steve, Configuration, VAC, pumpdown has started
|
Tue Dec 21 16:34:42 2010, kiwamu, Summary, VAC, All the test masses have been wiped
|
Wed Dec 22 15:47:22 2010, Koji, Update, VAC, Tank closing procedure
|
Wed Dec 22 17:24:50 2010, steve, Configuration, VAC, slow pumpdown at 12 hours
|
Wed Dec 22 21:38:47 2010, kiwamu, Configuration, VAC, Re:slow pumpdown at 12 hours
|
Thu Dec 23 13:30:09 2010, steve, Configuration, VAC, slow pumpdown complete
|
Tue Jan 11 11:39:45 2011, steve, Update, VAC, RGA is turned on
|
Mon Jan 31 16:12:11 2011, steve, Update, VAC, Vertex crane upgrade shorth coming 
|
Fri Feb 11 09:27:03 2011, steve, Configuration, VAC, RGA scan 
|
Wed Mar 9 17:29:11 2011, steve, Summary, VAC, single O-ring protection 
|
Fri May 6 15:59:40 2011, steve, Update, VAC, TP3 fore pump replaced
|
Fri Jul 22 10:13:41 2011, steve, Update, VAC, RGA scan at day 213
|
Fri Jul 22 10:24:34 2011, steve, Update, VAC, pressure plot at day 213
|
Wed Jul 27 15:38:01 2011, steve, Update, VAC, beam traps for vacuum
|
Mon Aug 1 08:52:37 2011, steve, Update, VAC, preparation to vent  
|
Wed Aug 3 09:40:13 2011, steve, Update, VAC, vent
|
Wed Aug 3 11:34:59 2011, kiwamu, Update, VAC, Re: vent
|
Wed Aug 3 16:18:30 2011, steve, Update, VAC, vent is almost finished
|
Mon Aug 8 15:52:39 2011, steve, Update, VAC, back ground rga scan 
|
Tue Aug 9 16:54:47 2011, steve, Update, VAC, scratch on vac door
|
Wed Aug 10 22:47:22 2011, rana, Summary, VAC, Vacuum Workstation (linux3) re-activated
|
Mon Aug 22 11:40:08 2011, steve, Update, VAC, cranes checked
|
Tue Aug 23 16:23:33 2011, Jenne, Update, VAC, Access connector in place
|
Thu Aug 25 17:14:49 2011, steve, Update, VAC, clean room fashion changes 
|
Thu Sep 1 11:03:22 2011, steve, Update, VAC, back ground rga scan 
|
Wed Sep 7 00:47:51 2011, Jenne, Update, VAC, PUMP is a GO!
|
Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started
|
Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight
|
Wed Sep 7 21:45:16 2011, kiwamu, Update, VAC, pump stopped. Pressure is at 450 mtorr
|
Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted 
|
Wed Sep 21 11:35:07 2011, steve, Update, VAC, RGA scan
|
Fri Sep 23 16:25:01 2011, steve, Update, VAC, vac rack UPS battery replaced 
|
Fri Sep 30 18:35:42 2011, steve, kiwamu, Update, VAC, vacuum set for poweroutage
|
Mon Oct 3 08:38:21 2011, steve, Summary, VAC, Recovery from the power shutdown is completed
|
Thu Oct 13 21:40:59 2011, rana, Summary, VAC, Recovery from the power shutdown is completed
|
Fri Oct 28 18:33:59 2011, steve, Update, VAC, leaking nitrogen line fixed
|
Mon Oct 31 08:55:19 2011, steve, Update, VAC, pressure plot at day 53
|
Mon Nov 14 15:46:14 2011, steve, Update, VAC, TP2's forepump changed
|
|