40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 337 of 349  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  10071   Thu Jun 19 14:12:45 2014 steveUpdatesafetyoptical table scans 
 PSL, AP, ETMY and ETMX optical
tables were scanned for stay beam.
  
  10075   Thu Jun 19 17:11:52 2014 steveUpdatePEMit is warmer today The PSL HEPA was running at 30VAC-variac.
It is 1 degree C warmer than usual. The HEPA
fan motor turned up to 60 V
 warmertoday.png 
  10081   Fri Jun 20 14:42:57 2014 steveUpdateSUSvac illuminators turned off    
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework   8days.png 
  10350   Fri Aug 8 11:22:35 2014 steveSummarySUSoplev laser summary 
         
        2005             
  
  10362   Mon Aug 11 10:23:39 2014 steveSummarySUSoplev laser summary updated

    

       
            
  
  10518   Thu Sep 18 10:08:07 2014 steveSummarySUSoplev laser summary updated 




  
  10523   Mon Sep 22 10:18:58 2014 steveUpdatePEMlab temperatures 
 
 summerheat.png 
  10560   Thu Oct 2 14:36:52 2014 steveUpdatePEMoil drops on vertex crane

    

       
            
 VertexOilDrops.jpg 
  10665   Tue Nov 4 10:40:46 2014 steveUpdatePEMlab temperatures and particle counts 
 
 PEM100d.png 
  10761   Mon Dec 8 09:03:49 2014 steveUpdatePEMair cond maintenance tomorrow morning 
 AC maintenance is scheduled
from 8am till 11am tomorrow morning.
  
  10773   Wed Dec 10 14:26:13 2014 steveUpdatePEMair cond maintenance and particle plot

    

       
            
 05.png 
  11083   Fri Feb 27 10:25:24 2015 steveUpdateCamerasquad picture problemMUX input 7 to ITMXF camera cable was replaced
by temporary cable labeled as 888

The problem remains to be the same
 quadMUX.jpg 
  11148   Thu Mar 19 17:11:32 2015 steveSummarySUSoplev laser summary updated          
March  19, 2015   2 
new  JDSU 1103P, sn P919645 & P919639
  
  11178   Fri Mar 27 10:38:40 2015 steveUpdateVACvac rack UPS battery replacedBatteries replaced after 3.5 years with
Amstron AP-1250F2,  8x 12V 6Ah

 UPSvac.jpg 
  11227   Mon Apr 20 16:42:48 2015 steveUpdateSUSPRM and BS oplev laser replacedThe laser below is dead. JDSU 1103P, SN
P845655 lived for 3.5 years.

 newOplevLaser.png 
  11792   Fri Nov 20 09:45:39 2015 steveSummarySUSoplev laser summary  




 oplev_summery.png 
  12014   Tue Mar 1 09:37:15 2016 steveUpdateVACvac rack UPS batteries replacedAmstron batteries replaced after 11 months
with SP-12-5.5HR,  2 years warranty
from replaceUPSbattery.com
 vacRackBat.jpg 
  12054   Wed Mar 30 11:35:24 2016 steveUpdatesafetyBS visitor's viewport is protected with lexan[quote]The four horizontal viewports of arms
are protected 
by 3/8" thick, 8.5" OD Lexan disk of MR10
  
  12125   Mon May 23 10:55:49 2016 steveSummarySUSITMX oplev laser replaced 

     
May 23, 2016            
 ITMXoplev.png 
  12126   Mon May 23 15:51:32 2016 steveSummarySUSoplev laser summary updated 




 oplSum.png 
  12341   Wed Jul 27 11:40:48 2016 steveSummarySUSoplev laser summary updated 




  
  12498   Fri Sep 16 14:15:28 2016 steveUpdatePEMpartical countsSouth end flow bench and both clean room
assembly flow benches measured zero counts
for 0.3 and 0.5 micron size particales.
 80days.png 
  12553   Wed Oct 12 15:01:22 2016 steveUpdateSUSSOS ITM baffles plates are readyThe two 40 mm apeture baffles at the ends
were replaced by 50 mm one. ITM baffles with
50 mm apeture are baked ready for installation.
 baffle7x9_1.5.jpgbaffle_holder.jpgbaffle_top_view.jpg 
  12656   Fri Dec 2 10:57:08 2016 steveUpdatePEM door seal replacedThe south end door leaky weather seals
replaced.

The aim is here to get some overpressure
 1_year_PEM.png 
  12753   Wed Jan 25 10:46:58 2017 steveSummarySUSoplev laser summary updated                   
Oct.  5, 2015             
ETMY He/Ne
 oplev_sums.png 
  12811   Wed Feb 8 10:16:39 2017 steveUpdateSUSclipping ITMX oplevThe ITMX oplev beam is clipping. It will
be corected with locked arm

 
 ITMX_oplev_clipping.jpgITMX_clipping.jpg 
  12836   Fri Feb 17 10:56:12 2017 steveUpdatePEMparticle counter moved into PSL enclousureThe MET#1 particle counter was moved from
CES wall at ITMX to PSL enclousure south
west corner at 11am.
 from_here.jpgto_here.jpgPSL_particles.png 
  12841   Tue Feb 21 10:08:35 2017 steveUpdatePEMnoisy morningOur new janitor Francisco is started working
in IFO room today.

 outside_activity.png 
  12844   Wed Feb 22 08:54:17 2017 steveUpdatePEM PSL enclousure particle countETMX sus damping recovered.  PSL enclousure
is dusty at 20V rotation speed. Rainy days
as outside condition.
 dusty__PSL.png 
  12855   Tue Feb 28 08:04:48 2017 steveUpdatePEMETMX damping recoveredETMX sus damping recovered.

Note: The giant metal garbage container
was moved from the south west corner of CES
 ETMX.png 
  12895   Mon Mar 20 17:12:08 2017 steveUpdatePEMparticle counter inside of PSL enclousureThe logging script is multiplying by 100
instead of 10 !

 enclousure_partical_count.png 
  13181   Thu Aug 10 09:10:55 2017 steveUpdateGeneraldataviewer is recoveringIt can look back 7 days trends now. There
is still no vacuum channels. I can bring
back the channels through the restore directory,
 7dm.png 
  13261   Mon Aug 28 10:51:21 2017 steveUpdateSUSETMX damping recovered   ETMX_restored.png 
  13695   Wed Mar 21 10:00:35 2018 steveUpdateGeneralprojector light bulb replacedLight bulb replaced.




  
  13861   Fri May 18 07:41:01 2018 steveUpdateSUSclipping ITMX oplevThe ITMX oplev
still clipping

  
  14048   Tue Jul 10 14:20:09 2018 steveUpdateGeneralprojector light bulb replacedBulb replaced at day 110  We have
now spare now.

 
  
  4963   Tue Jul 12 17:30:24 2011 steve,UpdateSUSBS oplev spectra


   
        
            
 BS_oplev.jpg 
  4966   Thu Jul 14 09:38:50 2011 steve,UpdateSUSBS oplev spectra

    
        
 BS_oplev.jpg 
  4967   Thu Jul 14 15:27:08 2011 steve,UpdateSUSSUS oplev spectras

    
        
 7x 
  1964   Thu Sep 3 10:19:35 2009 steve, albertoUpdatePEMparticle counts and burning hillsidesThe San Gabriel mountain has been on fire
for  6 days. 144,000 acres of beautiful
hillsides burned down and it's still burning. 
 fire6d.jpg40mgarden.JPG40mgarden2.JPGRBLOG-FIRE-SKY.JPG 
  4947   Wed Jul 6 16:44:37 2011 steve, kiwamuUpdateSUSBS oplev spectraHealthy BS oplev  BS.jpg 
  5590   Fri Sep 30 18:35:42 2011 steve, kiwamuUpdateVACvacuum set for poweroutageWe did the following:
1, closed V1, VM1,  annuloses:
VASE, VASV, VABS, VAEV,  VAEE and VA6
 prepforpoweroutage.png 
  3138   Tue Jun 29 17:10:49 2010 steve, ranaUpdateVACslow pumpdown startedThe folding crane was fixed and tested
this morning by the NNN rigging company.
Pictures will be posted by Steve in the morning.
  
  3140   Tue Jun 29 23:49:18 2010 steve, ranaUpdateVACslow pumpdown started   Untitled.png 
  3169   Wed Jul 7 17:05:30 2010 steve, ranaUpdateSAFETYSummary of Crane Damage/MalfunctionThe 1 Ton yellow crane support beam
jammed up at Friday morning, June 25.
 
 10x 
  1857   Fri Aug 7 16:11:11 2009 steve, robConfigurationVACIFO pressure rose to 2.3 mTorr


   
        
            
  
  4301   Tue Feb 15 11:57:06 2011 steve, valeraConfigurationPSLPMC swap We swapped the PMC s/n 2677 for s/n
lho006.
The table below summarizes the power
 P1070421.JPGP1070423.JPG 
  3148   Wed Jun 30 15:24:04 2010 steve,kiwamuUpdateVACslow pumpdown copmlete


   
        
            
 slowpd.jpgbutterfly.JPG 
  539   Wed Jun 18 16:37:54 2008 steve,ranaUpdateSAFETYCO2 test in the east armThe CO2 laser and table are in the east arm
for characterization of the mechanics. We
will not be operating it until we have an
 co2.png 
ELOG V3.1.3-