  13637   Fri Feb 16 15:57:58 2018 SteveUpdateVACTP3 drypump replacedThe forline pressure of TP3 was 399 mTorr

It was replaced this morning at 
TP3 controller 134,638hrs with the "failed
  
  13647   Wed Feb 21 17:20:32 2018 johannesUpdateVACHornet gauge connected to DAQ.I wired the six available BNC connectors
on the front panel of the new XEND slow DAQ
to physical Acromag channels. There were
 VacLog.png 
  13653   Fri Feb 23 07:47:54 2018 SteveUpdateVACCC1 HornetWe have the IFO pressure logged again!
Thanks Johannes and Gautam

This
 InstruTech_Hornet_CC1.pngCC1_readback_updated.png 
  13664   Mon Mar 5 10:13:21 2018 gautamUpdateVACvacuum healthIn Steve's absence, I've tried
to keep an eye on the health of the vacuum
system. From Attachment #1, the pressure
 VacuumStatus.png 
  13685   Fri Mar 16 09:36:56 2018 SteveUpdateVACRGA scan at day 511,218dPumpdown 80 at 511 days and pd80b at 218
days

Valve configuration:  special
 RgaScan511d.png08.png 
  13702   Mon Mar 26 09:25:18 2018 SteveUpdateVACVM1 openedCC1 old MKS cold cathode gauge randomly
turns on- off. This makes software interlock
close VM1 to protect RGA  So the closed
 CC4VM1.png 
  13709   Tue Mar 27 08:58:21 2018 SteveUpdateVACVM1 opened.......scan fine 




 rga2018march27.png 
  13918   Wed Jun 6 10:02:52 2018 SteveUpdateVACRGA scan   RGA302d.pngannuloses_NOT_pumped.pngtemp_vac.png 
  13919   Wed Jun 6 10:44:52 2018 gautamUpdateVACAnnulus pressure channels added to frames[steve,
gautam]

We added the following channels
 AnsPressureLogged.png 
  14059   Thu Jul 12 16:18:22 2018 SteveUpdateVACVent preparationsWe are getting ready to vent.

 
 before_Vent.pngbefore_Vent_cond.png 
  14064   Fri Jul 13 10:54:55 2018 aaronUpdateVACVent 80[aaron, steve]

Steve gave me a venting tutorial.
I'll record this in probably a bit more
 vent80wtiptilts.png 
  14066   Fri Jul 13 16:26:52 2018 SteveUpdateVACVent 80 is completing...Steve and Aaron,

6 hrs vent is reaching equlibrium
to room air. It took 3 and a half instrument
 @atm.pngvent80_7h.pngventregN2&Air_c.jpg 
  14073   Mon Jul 16 15:07:19 2018 KojiSummaryVACOven C vent[Steve Koji]

- Attachment1: Removed the thermal
cap. Checked the temperature of the oven.
 P_20180716_141512.jpgP_20180716_141601.jpgP_20180716_141610.jpgP_20180716_141827.jpgP_20180716_143901.jpg 
  14074   Mon Jul 16 18:12:00 2018 KojiUpdateVACAdding a manual gate valve between TP1 and V1/VM2[Steve Koji]

We are in the process of adding
a manual gate valve between TP1 (Osaka Maglev)
 P_20180716_155413.jpgP_20180716_155645.jpgP_20180716_155738.jpgP_20180716_162307.jpgP_20180716_172000.jpg 
  14079   Tue Jul 17 18:16:38 2018 SteveSummaryVACpumpdown 81 at 6 hrsPrecondition:  4 days at atm.  
Atm5

HEPA tent used during the vent
 6x 
  14080   Tue Jul 17 22:25:41 2018 KojiSummaryVACpumpdown 81 at 6 hrs10:20PM


Opened VM2 to pump down
the RGA section with TP1
Stopped
  
  14082   Wed Jul 18 12:49:08 2018 SteveSummaryVACpumpdown 81 at 6 +4.5hrsThe manual gate valve scan was clean. Atm1
    TP1 was pumping on it overnight.

         
 manlGateScan.pnghanding_over_Mag.pngTGVw2auxfans_.jpg 
  14083   Wed Jul 18 17:36:50 2018 SteveSummaryVACpumpdown 81 at 6 +9 hrs completedIFO P1 6e-4 Torr,  manual gate valve
is fully open

The annuloses will be pumped down
 pd81completed.pngpd81@30hrs.png 
  14085   Thu Jul 19 01:56:25 2018 gautamSummaryVACAUX pump shutdown[koji,
gautam]

Per Steve's instructions, we
  
  14087   Thu Jul 19 11:01:03 2018 SteveSummaryVACpd81 @ 2e-5 TorrCold cathode gauge just turned on.  pd81@2days.png 
  14088   Thu Jul 19 13:35:30 2018 SteveSummaryVACannuloses pumped Roughing down the annuloses required closing
V1 for 13 minutes

IFO is 2.2e-5 Torr
 AnsPumped.png 
  14098   Mon Jul 23 09:58:52 2018 SteveSummaryVACRGA scan at day 6 

 
 pd81-560Hz-d6.png 
  14137   Mon Aug 6 09:34:02 2018 SteveUpdateVACRGA scan at day 20 

 
 pd81d20.png 
  14167   Thu Aug 16 07:50:28 2018 SteveUpdateVACpumpdown 81 at day 30 

 
 pd81d30.png 
  14168   Thu Aug 16 14:48:14 2018 SteveUpdateVACwhy do we need a root pump?

Basic Pump Throughput Concepts

What
is Pump Throughput?

The manufacturer
 6x 
  14183   Fri Aug 24 10:51:23 2018 SteveUpdateVACpumpdown 81 at day 38 

 
 d38.png 
  14189   Wed Aug 29 09:56:00 2018 SteveUpdateVACMaglev controller needs serviceTP-1 Osaka maglev controller  [ 
model TCO10M,  ser V3F04J07 ] 
needs maintenance. Alarm led  on indicating 
  
  14207   Fri Sep 21 16:51:43 2018 gautamUpdateVACc1vac1 is unresponsiveSteve pointed out that some of the vacuum
MEDM screen fields were reporting "NO
COMM". Koji confirmed that this is a
  
  14215   Mon Sep 24 15:06:10 2018 gautamUpdateVACc1vac1 reboot + TP1 controller replacement[steve, gautam]

Following the procedure in this
 beforeReboot.pngafterReboot.pngCC1.png 
  14217   Wed Sep 26 10:07:16 2018 SteveUpdateVACwhy reboot c1vac1Precondition: c1vac1 & c1vac2 all LED
warning lights green [ atm3 ], the only error
message is in the gauge readings NO COMM,
 NOcomm.pngReboot_&_sawp.pngc1vac1&2_.jpg 
  14229   Thu Oct 4 08:25:50 2018 SteveUpdateVACrga scan pd81 at day 78 

 
 pd81d78.png 
  14244   Fri Oct 12 08:27:05 2018 SteveUpdateVACdrypumpGautam and Steve,

Our TP3 drypump seal is at 360
mT [0.25A load on small turbo]  after
 forepump.png 
  14247   Fri Oct 12 17:37:03 2018 SteveUpdateVACpressure gauge choices We want to measure the pressure gradient
in the 40m IFO

Our old MKS cold cathodes are out
  
  14256   Mon Oct 15 13:59:42 2018 SteveUpdateVACdrypump replacedSteve & Bob,

Bob removed the head cover from
the housing to inspect the condition of the
 drypump_swap.png 
  14262   Mon Oct 22 15:19:05 2018 SteveUpdateVACMaglev controller servicedGautam & Steve,

Our controller is back with Osaka
maintenace completed. We swapped it in this
 our_controller_is_back.png 
  14264   Wed Oct 31 17:54:25 2018 gautamUpdateVACCC1 hornet power connection restoredSteve reported to me that the CC1 Hornet
gauge was not reporting the IFO pressure
after some cable tracing at EX. I found that
 cc1_Hornet.png 
  14279   Tue Nov 6 23:19:06 2018 gautamUpdateVACc1vac1 FAIL lights on (briefly)Jon and I stuck a extender card into the
eurocrate at 1X8 earlier today (~5pm PT),
to see if the box was getting +24V DC from
 Screenshot_from_2018-11-06_23-18-23.pngScreenshot_from_2018-11-06_23-19-26.png 
  14281   Wed Nov 7 08:32:32 2018 SteveUpdateVACc1vac1 FAIL lights on (briefly)...checkedThe vacuum and MC are OK




 Vac_MC_OK.png 
  14291   Tue Nov 13 16:15:01 2018 SteveUpdateVACrga scan pd81 at day 119 

 
 pd81-d119.pngpd81-560Hz-d119.png 
  14299   Fri Nov 16 10:26:12 2018 SteveUpdateVAC single viton O-ringsThe 40m vacuum envelope has one large single
O-ring on the OOC west side. All other doors
have double O-ring with annuloses.
 Single-O-ring.png 
  14301   Fri Nov 16 15:09:31 2018 SteveConfigurationVACnot venting cryo and ion pumpsNotes on the ion pumps and cryo pump:



Our
4 ion pumps were closed off for a lomg time.
I estmated their pressure to be around ~1
  
  14305   Mon Nov 19 14:59:48 2018 ChubUpdateVACVent 81Vent 80 is nearly complete; the instrument
is almost to atmosphere.  All four ion
pump gate valves have been disconnected,
  
  14306   Mon Nov 19 17:09:00 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub and Steve,




 beforeVent82.pngvent81completed.png 
  14307   Mon Nov 19 22:01:50 2018 gautamUpdateVACLoose nut on valveAs I was turning off the lights in the
VEA, I heard a rattling sound from near the
PSL enclosure. I followed it to a valve -
 IMG_7171.JPG 
  14310   Tue Nov 20 13:13:01 2018 gautamUpdateVACIMC alignment is okayI checked the IMC alignment following the
vent, for which the manual beam block placed
on the PSL table was removed. The alignment
  
  14318   Mon Nov 26 15:58:48 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub & Steve,

ETMY heavy door replaced by light
one.
  
  14322   Tue Nov 27 17:06:51 2018 SteveConfigurationVACAgilent 84FS turbo installed as TP2Chub & Steve,   
  14367   Wed Dec 19 14:19:15 2018 KojiSummaryVACPlan for pumpoing down testWe
still need elaborated test procedure posted

12/29 Wed
 Screenshot_from_2018-12-19_14-49-34.png 
  14370   Wed Dec 19 21:14:50 2018 gautamUpdateVACPumpdown tomorrow I just spoke to Jon who asked me to make
this elog - we will be ready to test one
or more parts of the pumpdown procedure tomorrow
  
  14372   Thu Dec 20 08:38:27 2018 JonUpdateVACPumpdown tomorrow Linked is the pumpdown
procedure, contained in the old 40m documentation.
The relevant procedure is "All Off -->
  
ELOG V3.1.3-