    Reply  Tue Aug 25 21:36:28 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 2009-08-25_PSLtrend.png
 
 Is that the reason of the PSL craziness tonight? See attachment.
    Reply  Tue Aug 25 21:55:11 2009, rana, Update, PSL, reference cavity temp box temporarly out of order Untitled.pngrc-heater.jpg
There's no elog entry about what work has gone on today, but it looks like Peter took apart the reference cavity temperature control around 2PM.
I touched the reference cavity by putting my finger up underneath its sweater and it was nearly too hot to keep my finger in there. I looked at
the heater power supply front panel and it seems that it was railed at 30 V and 3 A. The nominal value according to the sticker on the front is 11.5 V
    Reply  Wed Aug 26 15:42:17 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 


    
        
            Quote:
        
        
            
            There's no elog entry about what work has gone on today, but it looks like Peter took apart the reference cavity temperature
    Reply  Wed Aug 26 16:11:41 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 
It turned out that half an hour was too long. In less than that the reference cavity temperature passed the critical point when the temperature controller
(located just below the ref cav power supply in the same rack) disables the input power to the reference cavity power supply.
The controller's display in the front shows two numbers. The first goes with the temperature of the reference cavity; the second is a threshold
    Reply  Wed Aug 26 16:31:34 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 


    
        
            Quote:
        
        
            
            It turned out that half an hour was too long. In less than that the reference cavity temperature passed the critical
Entry  Thu Oct 20 12:43:19 2011, steve, Update, SAFETY, refilled first aid kits & their locations 8x
First aid kits are located close vicinity of entry doors and under circuit breaker panels.
 
Entry  Sun May 16 12:51:08 2010, kiwamu, Update, Green Locking, reflected beam at PD 
Mode matching to the cavity has been done.
Now the reflection from the cavity is successfully going into the PD.
However I could not see any obvious error signal.
    Reply  Sun May 16 19:25:45 2010, Koji, Update, Green Locking, reflected beam at PD 
Don't make a short cut. The beam size at a single place does not tell you anything. 
Measure the mode of of the beam at multiple points. Calculate the mode matching ratio.
Align the mirrors precisely. Try to see the DC fringe. Predict the size of the DC fringe.
Entry  Mon Apr 7 18:58:49 2008, steve, Update, General, reflectivity of SS304 ss304s8refl.pdf
The reflectivity of stainless steel 304 super polished # 8 was measured the same way as elog entry 409

The reflectivity: 74 +- 1 % from incident angle 10 to 80 degrees
Entry  Wed Apr 2 15:03:51 2008, steve, Update, General, reflectivity of black glass  bg12refl.pdfbg12refsetup.pdf
The reflectivity of black glass, shade 12 was supplied by Donald O'Shea
of Emerald Glass Inc., Westlake, OH 44145
    Reply  Tue Feb 14 17:09:05 2012, steve, Update, General, reflectivity of green welding glass gg#14ref.pdfgg14refl1Wps.png
 Schott, Athermal green welding glass, shade #14 reflectivity was measured in 1.2W,  ~1 mm diameter  beam of MC reflected.
The P polarization measurement  was done with the help of half wave plate and PBC
 
Entry  Fri Dec 9 15:14:41 2011, Den, Update, CDS, release 2.4 
Alex has created a 2.4 branch of the RCD. Jamie, we can try to compile and install it. As a test a did it for c1oaf, it compiles, installs and runs once
variables SITE, IFO, RCD_LIBRARY_PATH are properly defined. As we do not want to run one model at 2.4 code and others at 2.1, I recompiled c1oaf back to
2.1. Jamie, please, let me know when you are ready to upgrade to 2.4 release.
Entry  Thu Mar 7 18:48:43 2013, yuta, Update, Computer Scripts / Programs, releasing my secret scripts 
I released/updated my secret scripts to real scripts directory.
I checked they run correctly (but maybe not working correctly).
Entry  Fri Sep 18 09:06:26 2015, rana, Frogs, Computer Scripts / Programs, remote data access: volume 1, Inferno 
Trying to download some data using matlab today, I found that my ole mDV stuff doesn't work because its MEX files were built for AMD64...

Tried to rebuild the NDS1 MEX according to 7 year old instructions didn't work; our GCC is 'too' new.

From the Remote Data Access wiki (https://wiki.ligo.org/RemoteAccess/MatlabTools) I got the new 'get_data.m' and 'GWdata.m'.
    Reply  Fri Sep 18 19:19:49 2015, rana, Frogs, Computer Scripts / Programs, remote data access: volume 1, Inferno 
NDS2 restarted after hours long upgrade process; testing has begun. Let's try to get some long stretches of MC locked with MCL FF ON this weekend
so's I can test out the angular FF idea.
Entry  Wed Nov 25 22:37:12 2015, yutaro, Update, LSC, removal of Gautam's cable in 1Y2 and restoration of POYDC 
[yutaro, Koji]

We disconnected the cable that was connected to CH5 of the whitening filter in 1Y2, then connected POYDC cable to there (CH5). This channel
is where POYDC used to connect.
Entry  Fri May 7 21:55:59 2010, kiwamu, Update, PSL, remove Mach-Zehnder  NO_MachZehnder_s.jpg
[Koji, Kiwamu]
The Mach-Zehnder on the PSL table was removed.
A path for 166 MHz modulation in the Mach-Zehnder (MZ) was completely removed, the setup for another path remains the same as before.
Entry  Tue Feb 26 10:17:44 2013, Jamie, Update, SUS, removed global/local switch from sus_single_control 
[jamie, brett]
Yesterday we added some new control logic to the sus_single_control part to allow for
global damping.  Today we decided that a binary switch between local/global damping was probably a bit extreme since we might want to smoothly ramp
Entry  Mon Nov 2 13:34:36 2009, kiwamu, Configuration, PSL, removed multiply resonant EOM 
I removed the multiply resonant EOM that has been set by a SURF student from PSL table.
I will use it for checking the resonant circuit.
    Reply  Thu Aug 1 16:03:52 2013, Steve, Update, General, reopen BS & IOO IOOnorth.jpg


    
        
            Quote:
        
        
            

           [Koji, Manasa]
    Reply  Mon Mar 18 14:58:15 2013, Steve, Update, Green Locking, repair or replace dead NPRO 
 
 JDSU can repair the Lightwave M126-1064-700 NPRO, sn 415  They do not need the Controller sn 516 
 Posted in the 40m Wiki_ PSL_ NPRO  cost repair and/or option to buy Innolight laser as replacement
    Reply  Fri Dec 2 16:21:12 2016, gautam, Update, General, repaired projector, new mixer arrived and installed 
The most recent power outage took out our projector and mixer. The projector was sent for repair while we ordered a new mixer. Both arrived today. Steve
is working on re-installing the projector right now, and I installed the mixer which was verified to be working with our DAFI system (although the 60Hz
issue still remains to be sorted out). The current channel configuration is:
Entry  Tue Jan 11 17:08:43 2011, Suresh, Configuration, PSL, replaced the pzt-steering mirror on PSL 
[Rana, Jenne, Suresh]
Yesterday, We replaced the existing beam steering mirror and the PZT it was mounted on with a Gooch and Housego
mirror (20ppm transmission at < 30deg incidence @1064nm) and a Polaris-K
Entry  Tue Feb 12 16:39:52 2008, rob, Update, Locking, report 

Did some locking work on DRFPMI on sunday and (with John) on monday nights.  So far progress has not been terribly encouraging.  
Entry  Thu Jun 12 01:51:23 2008, rob, Update, Locking, report lock_control_sequence.png
[I]rob, john[/I]

We've been working (nights) on getting the IFO locked this week.  There's been fairly steady incremental progress each night, and tonight we managed to
    Reply  Thu Jun 12 15:09:33 2008, alan, Update, Locking, report 
Rob: Awesome figure. As you can imagine, I have lots of questions, and hope that you will consider this figure to be the beginning, leading to ever-more
detailed versions. But for now, I just want to ask whether you understand *what* is twitchy, and what the twitchiness does to prevent you from taking this
further?
    Reply  Thu Jun 12 15:55:15 2008, rob, Update, Locking, report 
[quote]Rob: Awesome figure. As you can imagine, I have lots of questions, and hope that you will consider this figure to be the beginning, leading to ever-more
detailed versions. But for now, I just want to ask whether you understand *what* is twitchy, and what the twitchiness does to prevent you from taking this
further?[/quote]
Entry  Wed Aug 12 02:00:32 2009, rob, Update, Locking, report 
Spent a lot of time aligning tonight.  The BS is not staying put--sometimes after a lock loss it gets badly mis-aligned. 
DD handoff is working, after putting beam on REFL diodes and running senseDRM script.
Entry  Wed Aug 19 23:57:35 2009, rob, Update, Locking, report 
 
locking work proceeding apace tonight.
diagonalized DRM with setDDphases & senseDRM. 
Entry  Tue Jun 21 00:38:21 2011, Sonali, Update, Green Locking, repositioned "QPDY_PD" ETMY_table_2011_June20.pngETMY_table_change1.jpg
1.The aim is the laser frequency stabilisation of PSL and AUX.
2.As a first step we want to couple some of the AUX laser beam into a single mode optical fibre and route the fibre to the PSL table.
3.The position of the optical fibre on the ETMY table is shown by the coupler in the attached picture. The yellow lines show the new scheme we
Entry  Tue Jun 2 23:53:12 2009, pete, DAQ, Computers, reset c1susvme1 
rob, alberto, rana, pete
we reset this computer, which was out of sync (16384 in the FE_SYNC field instead of 0)
    Reply  Tue Sep 9 09:19:21 2014, Steve, Update, safety, response to fried Sorensen friedSorenson.pngsmokeAlarm1a.jpgsmokeAlarm2a.jpg


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Thu Aug 12 23:17:54 2010, Zach, Update, elog, restarted 
 script
    Reply  Thu Aug 12 23:41:48 2010, Jenne, Update, elog, restarted 


    
        
            Quote:
        
        
            
             script
    Reply  Fri Aug 13 13:11:30 2010, Dmass, Update, elog, restarted 


    
        
            Quote:
        
        
            
            
            
  
Entry  Thu Aug 19 21:56:02 2010, Zach, Update, elog, restarted 
 script
Entry  Tue Aug 24 17:57:57 2010, Zach, Update, elog, restarted 
 Restarted the elog using the script. I had to do it twice for it to work. This is not the first time this has happened---does anyone know why this
might be?
    Reply  Tue Aug 24 22:26:16 2010, Zach, Update, elog, restarted 
took two again


    
        
            Quote:
        
        
            
Entry  Tue Dec 14 09:26:17 2010, Zach, Update, elog, restarted 
 Restarted the elog with the script
Entry  Sat Dec 18 06:24:49 2010, rana, Update, elog, restarted 
The process was taking up 100% of the CPU and not responding via web. The .log file showed the last action was somebody reading/editing one of Jenne's
entries from August regarding TT ECD. The restart script didn't work, so I had to do a 'kill -9' to get it to die.
    Reply  Sat Dec 18 23:33:06 2010, Koji, Update, elog, restarted 
Did the same.


    
        
            Quote:
        
        
            
    Reply  Sun Dec 19 11:19:42 2010, Koji, Update, elog, restarted 
Did it again. It seemed that Google bot came to the elog and tried to obtain  "http://nodus.ligo.caltech.edu:8080/robots.txt". That was the
last of the log.
Bot came from the AJW's homepage. Also Google FeedFecther came to the elog.
    Reply  Sun Dec 19 22:45:28 2010, rana, Update, elog, restarted 
I deleted the yellow box which showed up by default when making an elog entry. Would be nice if we could make it so that you have to click a button to
'opt-in' for the yellow box rather than get it by default.
I added a 'robots.txt' file to the /users/public_html/ area using Google's
    Reply  Wed Jan 5 10:45:51 2011, Koji, Update, elog, restarted 
Google bot  crashed the elog again. Then, I found that Google bot (and I) can crash elogd by trying to show the threaded view.
There looks similar issue reported to the elog forum, the author did not think this is a true bag.
Note: This happens only for the 40m elog. The other elogs (ATF/PSL/TCS/SUS/Cryo) are OK for the threaded view.
Entry  Wed Jan 5 21:19:29 2011, Zach, Update, elog, restarted 
 Restarted the elog with the script
Entry  Mon Feb 21 11:05:51 2011, Zach, Update, elog, restarted 
 I restarted the elog using the script.
Entry  Mon Feb 21 23:00:06 2011, Zach, Summary, elog, restarted 
 again
Entry  Fri Mar 4 13:25:04 2011, Zach, Update, elog, restarted 
with script
Entry  Fri Apr 22 02:10:53 2011, Zach, Update, elog, restarted 
Restarted the elog with the script.
Entry  Tue Apr 26 22:56:35 2011, Zach, Update, elog, restarted 
 with script
ELOG V3.1.3-