ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
1946
|
Tue Aug 25 21:55:11 2009 |
rana | Update | PSL | reference cavity temp box temporarly out of order | There's no elog entry about what work has
gone on today, but it looks like Peter took
apart the reference cavity temperature control |
 |
1949
|
Wed Aug 26 15:42:17 2009 |
Alberto | Update | PSL | reference cavity temp box temporarly out of order |
|
|
1951
|
Wed Aug 26 16:11:41 2009 |
Alberto | Update | PSL | reference cavity temp box temporarly out of order | It turned out that half an hour was too
long. In less than that the reference cavity
temperature passed the critical point when |
|
1952
|
Wed Aug 26 16:31:34 2009 |
steve | Update | PSL | reference cavity temp box temporarly out of order |
|
|
5712
|
Thu Oct 20 12:43:19 2011 |
steve | Update | SAFETY | refilled first aid kits & their locations | First aid kits are located close vicinity
of entry doors and under circuit breaker
panels. |
8x |
2936
|
Sun May 16 12:51:08 2010 |
kiwamu | Update | Green Locking | reflected beam at PD | Mode matching
to the cavity has been done. |
|
2937
|
Sun May 16 19:25:45 2010 |
Koji | Update | Green Locking | reflected beam at PD | Don't
make a short cut. The beam size at a single
place does not tell you anything. |
|
417
|
Mon Apr 7 18:58:49 2008 |
steve | Update | General | reflectivity of SS304 | The reflectivity of stainless steel 304 super
polished # 8 was measured the same way as
elog entry 409
|
|
409
|
Wed Apr 2 15:03:51 2008 |
steve | Update | General | reflectivity of black glass | The reflectivity of black glass, shade 12
was supplied by Donald O'Shea
of Emerald Glass Inc., Westlake, OH 44145
|
 |
6280
|
Tue Feb 14 17:09:05 2012 |
steve | Update | General | reflectivity of green welding glass | Schott, Athermal green welding glass,
shade #14 reflectivity was measured in 1.2W,
~1 mm diameter beam of MC reflected. |
 |
6095
|
Fri Dec 9 15:14:41 2011 |
Den | Update | CDS | release 2.4 | Alex has created a 2.4 branch of the RCD.
Jamie, we can try to compile and install
it. As a test a did it for c1oaf, it compiles, |
|
8254
|
Thu Mar 7 18:48:43 2013 |
yuta | Update | Computer Scripts / Programs | releasing my secret scripts | I released/updated my secret scripts to
real scripts directory.
I checked they run correctly (but |
|
11618
|
Fri Sep 18 09:06:26 2015 |
rana | Frogs | Computer Scripts / Programs | remote data access: volume 1, Inferno | Trying to download some data using matlab
today, I found that my ole mDV stuff doesn't
work because its MEX files were built for |
|
11623
|
Fri Sep 18 19:19:49 2015 |
rana | Frogs | Computer Scripts / Programs | remote data access: volume 1, Inferno | NDS2 restarted after hours long upgrade
process; testing has begun. Let's try
to get some long stretches of MC locked with |
|
11813
|
Wed Nov 25 22:37:12 2015 |
yutaro | Update | LSC | removal of Gautam's cable in 1Y2 and restoration of POYDC | [yutaro, Koji]
We disconnected the cable that
was connected to CH5 of the whitening filter in |
|
2898
|
Fri May 7 21:55:59 2010 |
kiwamu | Update | PSL | remove Mach-Zehnder | [Koji, Kiwamu]
The |
|
8168
|
Tue Feb 26 10:17:44 2013 |
Jamie | Update | SUS | removed global/local switch from sus_single_control | [jamie, brett]
Yesterday
we added some new control logic to the sus_single_control |
|
2169
|
Mon Nov 2 13:34:36 2009 |
kiwamu | Configuration | PSL | removed multiply resonant EOM | I removed the multiply resonant EOM that
has been set by a SURF student from PSL table.
I will use it for checking the resonant |
|
8953
|
Thu Aug 1 16:03:52 2013 |
Steve | Update | General | reopen BS & IOO |
|
|
8307
|
Mon Mar 18 14:58:15 2013 |
Steve | Update | Green Locking | repair or replace dead NPRO |
JDSU can repair the Lightwave
M126-1064-700 NPRO, sn 415 They do |
|
12659
|
Fri Dec 2 16:21:12 2016 |
gautam | Update | General | repaired projector, new mixer arrived and installed | The most recent power outage took out our
projector and mixer. The projector was sent
for repair while we ordered a new mixer. |
|
4137
|
Tue Jan 11 17:08:43 2011 |
Suresh | Configuration | PSL | replaced the pzt-steering mirror on PSL | [Rana,
Jenne, Suresh]
Yesterday, |
|
313
|
Tue Feb 12 16:39:52 2008 |
rob | Update | Locking | report |
Did some locking work on DRFPMI on sunday
and (with John) on monday nights. So far |
|
531
|
Thu Jun 12 01:51:23 2008 |
rob | Update | Locking | report | [I]rob, john[/I]
We've been working (nights) on getting the |
|
532
|
Thu Jun 12 15:09:33 2008 |
alan | Update | Locking | report | Rob: Awesome figure. As you can imagine, I
have lots of questions, and hope that you
will consider this figure to be the beginning, |
|
533
|
Thu Jun 12 15:55:15 2008 |
rob | Update | Locking | report | [quote]Rob: Awesome figure. As you can imagine,
I have lots of questions, and hope that you
will consider this figure to be the beginning, |
|
1889
|
Wed Aug 12 02:00:32 2009 |
rob | Update | Locking | report | Spent a lot of time aligning tonight.
The BS is not staying put--sometimes after
a lock loss it gets badly mis-aligned. |
|
1930
|
Wed Aug 19 23:57:35 2009 |
rob | Update | Locking | report |
locking work proceeding apace tonight.
diagonalized DRM with setDDphases |
|
4846
|
Tue Jun 21 00:38:21 2011 |
Sonali | Update | Green Locking | repositioned "QPDY_PD" | 1.The aim is the laser frequency stabilisation
of PSL and AUX.
2.As a first step we want to couple |
 |
1643
|
Tue Jun 2 23:53:12 2009 |
pete | DAQ | Computers | reset c1susvme1 | rob, alberto, rana, pete
we reset this computer, which was
out of sync (16384 in the FE_SYNC field instead |
|
10476
|
Tue Sep 9 09:19:21 2014 |
Steve | Update | safety | response to fried Sorensen |
|
  |
3415
|
Thu Aug 12 23:17:54 2010 |
Zach | Update | elog | restarted | script |
|
3416
|
Thu Aug 12 23:41:48 2010 |
Jenne | Update | elog | restarted |
|
|
3420
|
Fri Aug 13 13:11:30 2010 |
Dmass | Update | elog | restarted |
|
|
3445
|
Thu Aug 19 21:56:02 2010 |
Zach | Update | elog | restarted | script |
|
3465
|
Tue Aug 24 17:57:57 2010 |
Zach | Update | elog | restarted | Restarted the elog using the script.
I had to do it twice for it to work. This
is not the first time this has happened---does |
|
3466
|
Tue Aug 24 22:26:16 2010 |
Zach | Update | elog | restarted | took two again
|
|
4052
|
Tue Dec 14 09:26:17 2010 |
Zach | Update | elog | restarted | Restarted the elog with the script |
|
4071
|
Sat Dec 18 06:24:49 2010 |
rana | Update | elog | restarted | The process was taking up 100% of the CPU
and not responding via web. The .log file
showed the last action was somebody reading/editing |
|
4072
|
Sat Dec 18 23:33:06 2010 |
Koji | Update | elog | restarted | Did the same.
|
|
4073
|
Sun Dec 19 11:19:42 2010 |
Koji | Update | elog | restarted | Did it again. It seemed that Google bot
came to the elog and tried to obtain "http://nodus.ligo.caltech.edu:8080/robots.txt".
That was the last of the log. |
|
4074
|
Sun Dec 19 22:45:28 2010 |
rana | Update | elog | restarted | I deleted the yellow box which showed up
by default when making an elog entry. Would
be nice if we could make it so that you have |
|
4111
|
Wed Jan 5 10:45:51 2011 |
Koji | Update | elog | restarted | Google bot crashed the elog again.
Then, I found that Google bot (and I) can
crash elogd by trying to show the threaded |
|
4114
|
Wed Jan 5 21:19:29 2011 |
Zach | Update | elog | restarted | Restarted the elog with the script |
|
4332
|
Mon Feb 21 11:05:51 2011 |
Zach | Update | elog | restarted | I restarted the elog using the script. |
|
4334
|
Mon Feb 21 23:00:06 2011 |
Zach | Summary | elog | restarted | again |
|
4378
|
Fri Mar 4 13:25:04 2011 |
Zach | Update | elog | restarted | with script |
|
4556
|
Fri Apr 22 02:10:53 2011 |
Zach | Update | elog | restarted | Restarted the elog with the script. |
|
4571
|
Tue Apr 26 22:56:35 2011 |
Zach | Update | elog | restarted | with script |
|
5362
|
Wed Sep 7 20:44:11 2011 |
Suresh | Update | elog | restarted | Elog crashed / dormant for long time.
A look at the log file indicated that it
was busy generating png thumbnails for pdf |
|