40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 336 of 350  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subjectup Text Attachments
  2757   Thu Apr 1 20:29:02 2010 HartmutUpdateGreen Lockingsimple PD test circuitI made a simple PD test circuit which may
allow to test PD response up to few 100MHz.
Its not for low noise, only for characterising
 pdtest.png 
  3048   Thu Jun 3 22:33:31 2010 valeraSummaryCDSsimulated plant work I put matlab files and a summary
into the 40m wiki for the fitting of the
40m Optickle transfer functions and generating
  
  6874   Tue Jun 26 01:30:13 2012 yutaSummaryGreen Lockingsimultaneous hold and release of the arm (aka two arm ALS)To get the feeling of the master of IFO,
I;
 ALSboth20120625_2withAS.png 
  4391   Wed Mar 9 17:29:11 2011 steveSummaryVACsingle O-ring protectionWe have one single O-ring on the 40m vacuum
envelope. It is on the OOC west side, facing
the AP table. This O-ring has to be protected
 so1.jpgP1070458.JPG 
  6046   Tue Nov 29 22:54:49 2011 DenUpdatedigital noisesingle precision In the previous elog we've proved
that signals C1:SUS-MC3_LSC_EXCMON and  C1:SUS-MC3_LSC_OUTMON
are in single precision. Now we try to understand
 filter_coherence.jpgchby1_coherence.jpgbutter8_coherence.jpgbutter2_coherence.jpg 
  6717   Wed May 30 18:16:44 2012 JamieUpdateLSCskeleton of new c1cal calibration model created[Jamie, Xavi Siemens, Chris Pankow]
We built the skeleton of a new calibration
model for the LSC degrees of freedom. 
  
  617   Tue Jul 1 21:27:27 2008 robHowToComputer Scripts / Programsslider twiddling after reboot
Sometimes after we reboot the front-end machines,
some of the hardware gets stuck in an unknown
  
  9824   Thu Apr 17 16:59:45 2014 jamieUpdateCDSslightly more successful attempt to get Dolphin working on c1iooSo it turns out that the card that Rolf
had given me was not a Dolphin host adapter
after all.  He did have an actual host
  
  3728   Fri Oct 15 15:32:35 2010 josephbUpdateCDSslow DAQ channels addedI
added all the _OUT16, _INMON, _EXCMON channels
associated with the BS, ITMX, and ITMY channels
  
  3732   Mon Oct 18 08:44:36 2010 ranaUpdateCDSslow DAQ channels addedWhy EXCMON? I think that we should
modify the filter coefficients so that the
decimation filter that makes OUT16 is a 2nd
  
  6915   Thu Jul 5 01:20:58 2012 yutaSummaryCDSslow computers, 0x4000 for all DAQ statusALS looks OK. I tried to lock FPMI using
ALS, but I feel like I need 6 hands to do
it with current ALS stability. Now I have
  
  12754   Wed Jan 25 14:30:20 2017 gautamUpdateCDSslow machine bootfest[gautam, lydia]

We rebooted c1psl,
  
  12762   Fri Jan 27 17:07:52 2017 LydiaUpdateCDSslow machine bootfestRebooted c1iscaux,
c1auxex and c1auxey which were all
not reponding to telnet. The watchdogs for
  
  12803   Mon Feb 6 15:18:08 2017 gautamUpdateCDSslow machine bootfestHad to reboot c1psl,
c1susaux, c1auxex, c1auxey 
  
  13012   Thu May 25 12:22:59 2017 gautamUpdateCDSslow machine bootfestAfter ~3months without any problems on
the slow machine front, I had to reboot 
  
  13028   Thu Jun 1 15:37:01 2017 gautamUpdateCDSslow machine bootfestSteve alerted me that the IMC wouldn't
lock. Reboots for
  
  13059   Mon Jun 12 10:34:10 2017 gautamUpdateCDSslow machine bootfestReboots for
c1susaux, c1iscaux, c1auxex
  
  13069   Fri Jun 16 13:53:11 2017 gautamUpdateCDSslow machine bootfestReboots for
c1psl, c1iool0, c1iscaux
  
  13096   Wed Jul 5 16:09:34 2017 gautamUpdateCDSslow machine bootfestReboots for
c1susaux, c1iscaux
  
  13273   Wed Aug 30 10:54:26 2017 gautamUpdateCDSslow machine bootfestMC autolocker and FSS loops were stuck
because c1psl
  
  13297   Tue Sep 5 23:02:37 2017 gautamUpdateCDSslow machine bootfestMC autolocker was not working - PCdrive was railed
at its upper rail for ~2 hours judging by
  
  13355   Tue Oct 3 19:39:10 2017 gautamUpdateCDSslow machine bootfestEurocrate key turning reboots for c1susaux,   
  13360   Thu Oct 5 11:46:15 2017 gautamUpdateCDSslow machine bootfestMC Autolocker was umnhappy because c1iool0   
  13379   Thu Oct 12 14:42:45 2017 gautamUpdateCDSslow machine bootfestSteve reported problems getting the X arm
locked. Alignment sliders were inaccessible.
Eurocrate key turning reboots for 
  
  13399   Tue Oct 24 16:43:11 2017 SteveUpdateCDSslow machine bootfest[ Gautam , Steve ]

c1susaux
  
  13518   Tue Jan 9 11:52:29 2018 gautamUpdateCDSslow machine bootfestEurocrate key turning reboots today morning
for and
  
  13522   Wed Jan 10 12:24:52 2018 gautamUpdateCDSslow machine bootfestMC autolocker got stuck (judging by wall
StripTool traces, it has been this way for
~7 hours) because 
  
  13558   Fri Jan 19 11:13:21 2018 gautamUpdateCDSslow machine bootfestc1psl, c1susaux,
and
  
  13727   Wed Apr 4 16:23:39 2018 gautamUpdateCDSslow machine bootfest[johannes, gautam]

It's been a while - but today,
all slow machines (with the exception of
  
  13758   Wed Apr 18 10:44:45 2018 gautamUpdateCDSslow machine bootfestAll slow machines (except c1auxex)
were dead today, so I had to key them all.
 MCautolocker_MEDM_revamp.png 
  13812   Thu May 3 12:19:13 2018 gautamUpdateCDSslow machine bootfestReboot for c1susaux
and 
  
  13925   Thu Jun 7 12:20:53 2018 gautamUpdateCDSslow machine bootfestFSS slow wasn't running so PSL PZT
voltage was swinging around a lot. Reason
was that was 
 ITMX_stuck.png 
  13410   Mon Nov 6 11:15:43 2017 gautamUpdateCDSslow machine bootfest + IFO re-alignmentEurocrate key turning reboots today morning
for
  
  13408   Mon Oct 30 11:15:02 2017 gautamUpdateCDSslow machine bootfest + vacuum snafuEurocrate key turning reboots today morning
for c1psl
  
  3138   Tue Jun 29 17:10:49 2010 steve, ranaUpdateVACslow pumpdown startedThe folding crane was fixed and tested
this morning by the NNN rigging company.
Pictures will be posted by Steve in the morning.
  
  3140   Tue Jun 29 23:49:18 2010 steve, ranaUpdateVACslow pumpdown started   Untitled.png 
  3141   Wed Jun 30 00:45:26 2010 ranaUpdateVACslow pumpdown stopped for the nightAs per Steve's instructions, at 12:43 AM,
I used the following steps to stop the pumpdown
until the morning:
  
  4089   Wed Dec 22 17:24:50 2010 steveConfigurationVACslow pumpdown at 12 hoursWe have reached 200 Torr at 12 hours of
slow pumping speed. Kiwamu stopped the pumping
for 11 hrs last night .and I restarted it
 slowpd12h.jpg 
  4094   Thu Dec 23 13:30:09 2010 steveConfigurationVACslow pumpdown completeThe pump down continued this morning by
the removal of the butterfly valve. Two roughing
pumps were used to reach 500 mTorr
 slow2dpd.jpg 
  3148   Wed Jun 30 15:24:04 2010 steve,kiwamuUpdateVACslow pumpdown copmlete


   
        
            
 slowpd.jpgbutterfly.JPG 
  3331   Fri Jul 30 09:55:34 2010 steveConfigurationVACslow pumpdown has startedBob and Steve closed BS chamber with the
help of the manual Genie lift and the pump
down started. The PSL shutter was closed
 slowpd5hr.jpg 
  2573   Fri Feb 5 11:01:49 2010 steveConfigurationVACslow pumpdown valve I have installed a slow start throttle
valve in front of V3  This spring loaded
valve will cut down on the flow at high pressures.
 slow.JPG 
  3248   Tue Jul 20 08:04:31 2010 steveConfigurationVACslow vent has startedThe PSL shutter was closed. The beam path 
blocked two places. High voltage power supplies
to IOO and OMC PZT were checked to be off.
  
  3611   Mon Sep 27 08:59:50 2010 steveConfigurationVACslow vent has startedBlocked PSL output beam  into IFO
Checked: HV at IOO & OMC are
off, jam nuts in position,
  
  6836   Wed Jun 20 00:02:16 2012 yutaUpdateGreen Lockingslower scan using phase tracking ALSFor those of you who want to see plots
from slower scan.
 YarmScan20120619.png 
  14182   Fri Aug 24 08:04:37 2018 SteveUpdateGeneralsmall earth quake 

 
 small_EQ.png 
  14185   Mon Aug 27 09:14:45 2018 SteveUpdatePEMsmall earth quakes Small earth quakes and suspensions. Which
one is the most free and most sensitive:
ITMX
 small_EQs_vs_SUSs.png 
  7950   Mon Jan 28 21:36:44 2013 tall guyFrogsGeneralsmall people on noticeIf I catch anyone putting small booties
into the large bootie bin, I will make said
person eat small booties.
  
  13047   Wed Jun 7 11:32:56 2017 SteveUpdateVACsmooth vac rebootGautam and Steve,

 

The medm monitor & vac control
 vac_reboot.png 
  16237   Fri Jul 2 12:42:56 2021 Anchal, Paco, GautamSummaryLSCsnap file changed for MICHWe corrected the MICH locking snap file
C1configure_MI.req and saved an updated C1configure_MI.snap.
Now the 'Restore MICH' script in
  
ELOG V3.1.3-