    Reply  Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  Piezo-mirror_2.JPG
 
I mounted the second PZT in a modified mount, and then glued a 1-inch Y2 mirror on
    Reply  Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT QPD-XCalib.pdfQPD-YCalib.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Pitch_tilt.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Yaw_tilt.pdf
 I recalibrated the QPD today as I had shifted its position a little. I then identified the linear range of the QPD
and performed a preliminary calibration of the Piezo tip-tilt within this range.
 
Entry  Mon Jul 22 17:17:30 2013, annalisa, Update, endtable upgrade, End table picture YendTable.jpg
 
    Reply  Tue Jul 23 00:51:46 2013, Koji, Update, endtable upgrade, End table picture P7224222.JPGP7224223.JPGP7224224.JPGP7224238.JPG
The spot on the IPANG QPD was checked. The spot is higher than the center and South side of the lens.
Some photos are found below.
The spot on the IPANG steering mirrors in the ETMY chamber was also checked.
    Reply  Tue Jul 23 19:37:08 2013, Annalisa, Update, endtable upgrade, End table picture IMG950073.jpgIMG950072.jpg


    
        
            Quote:
        
        
            

           The spot on the IPANG QPD was checked. The spot is higher than the center and South side of the lens.
    Reply  Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf
 Given that the green beam is to be used as the reference during the vent,
it was decided to first test the PZT mounted mirrors at the X-endtable rather than the Y-endtable as originally planned. Yesterday, I prepared a second
PZT mounted mirror, completed the full range calibration, and with Manasa, installed the mirrors on the X-endtable as mentioned in this 
Entry  Sun Jul 28 19:39:04 2013, Annalisa, Update, endtable upgrade, Picture 
 Yend table picture updated on the wiki page
    Reply  Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes D980323-C-modified.pdfD980323-C-modified-pg2.pdf
 
 
I have updated the schematic of the D980323 PZT driver boards to reflect the changes
    Reply  Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9 
 The following hardware
has been installed on rack 1X9;

    KEPCO high voltage power supply
    Reply  Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested 
 
 [Alex, Gautam]
The signal chain from the DAC output to the output of the PZT driver
    Reply  Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  
 
 I have glued a fourth mirror to a PZT (using superglue) and inserted
it into a modified mount. This is to be used together with the 1-inch Laseroptik mirror I had glued a couple of weeks back at the Y-endtable.
    Reply  Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf
 I had prepared two more PZT mounted mirrors for the Y-end some time back. These are:

    A 2-inch CVI mirror (45 degree, HR and AR for 532nm, was originally
one of the steering mirrors at the X-endtable, and was removed while switching those out for the PZT mounted mirrrors).
    
Entry  Mon Dec 9 11:44:08 2013, Steve, Update, endtable upgrade, ETMY optable got new beam dump ETMYoptBefore.jpgETMYoptAfter.jpg
Aluminum shield replaced by razor beam dump.
    Reply  Mon May 12 14:42:25 2014, steve, Update, endtable upgrade, optical table enclosure wall proposal and table at ETMY Hilite70.jpgETMY-ISCT.jpgRoscoThermashield.pdf


    
        
            Quote:
        
        
            

            Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of  0.007"
    Reply  Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMY-Nfeedt.jpg
The ETMY enclosure feedthrough - north is installed. The sealing material is hard to work with.

The upper empty blocks will be replaced by something soft to make changing cables easy.

 
    Reply  Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMYsFeedt.jpg
ETMY optical table enclosure feedthrough- south is in. Now it is time to see how air tightness increases performance.




Quote:



The ETMY enclosure feedthrough
    Reply  Thu Sep 17 02:22:53 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough 
I doubt we'll see any effect until we carefully seal the holes. If there's 1 hole in your boat it still sinks.




Quote:



ETMY optical table enclosure
    Reply  Tue Dec 22 16:39:42 2015, Steve, Update, endtable upgrade, ETMY optical table enclosure IMG_0028.JPGIMG_0027.JPGETMY-ISCT_EISOL.jpg
I think there should be a scientifically based aveluation of the ETMY enclosure so we can make the ETMX better.

Meanwhile I'm counting pieces to move on with the south end table cover.

 
Entry  Thu Mar 10 16:29:32 2016, gautam, Update, endtable upgrade, Inventory check Inventory_check.pdfDoubler_comparison.pdf
I did a quick sweep of the lab to find out what hardware has already been acquired for the X-end table upgrade. The attached PDF is an inventory check
in the spirit of this elog.

Some things we have to decide:
    Reply  Thu Mar 10 16:32:45 2016, rana, Update, endtable upgrade, Inventory check 
Its not a good idea to use green mounts with green lasers. Steve should be able to get another copy of the EY doubler mount made up if we really don't
have another one sitting in the Manasa end table box which Koji mentioned.
    Reply  Mon Mar 14 22:42:23 2016, gautam, Update, endtable upgrade, Inventory check 



Quote:



Steve should be able
to get another copy of the EY doubler mount made up if we really don't have another one sitting in the Manasa end table box which Koji mentioned.
    Reply  Mon Mar 28 10:43:18 2016, Steve, Update, endtable upgrade, ETMX 4'x2' optical table pictures ETMX4x2Layout.jpgETMX_4x2.JPGETMXopt_4x2.JPG
 

 
    Reply  Wed Mar 30 17:38:52 2016, gautam, Update, endtable upgrade, X end table proposed layout  ETMX_3x2.JPGlayout_details_20160328.pdfETMX_proposed_layout.pdf
Attachment 1: This is a photo of the current X end table optical layout with the beampaths of the various sub-systems
overlaid. For the labels, see Attachment #2.

Attachment 2: This is a summary of all the optical components that are currently being used. I've noted some
    Reply  Thu Mar 31 09:38:41 2016, Steve, Update, endtable upgrade, Y end 4x3 existing layout ETMY4x3layout.jpg
Beam colors: 1064 nm red, 514 nm green and 633 nm yellow.

There should be room for lens in front of the pd at red3 and a mirror for alignment in the new layout.

This picture may help you how to improve the new ETMX 4' x 3' optical layout.
    Reply  Thu Mar 31 19:49:31 2016, gautam, Update, endtable upgrade, proposed layout v2 ETMX_proposed_layout_v2.pdf
The major changes from the previous layout:


I've depicted the Green reflected beam path more accurately - I approximately measured the angle of the rejected beam from the
faraday from the Y-end setup. This looks like a workable solution, and is similar to what we have currently at the Y-end
I've added some
    Reply  Mon Apr 4 10:59:12 2016, gautam, Update, endtable upgrade, proposed layout v3 ETMX_proposed_layout_v3.pdfIR_modematch.pdfGreen_modematch.pdfXendALaMode.zipETMX_proposed_layout_dimensions.dwg
I realized I had overlooked an important constraint in the layout, which is that the enclosure will have two supports that occupy some region of the
table - these are denoted in blue in v3 of the layout (Attachment #1). I measured the dimensions for these from the existing Y-endtable. The main subsystem
this has affected is the IR transmission monitors, but I've been able to move the photodiodes a little to accommodate this constraint.
    Reply  Mon Apr 4 15:04:14 2016, gautam, Update, endtable upgrade, COMPONENT REMOVAL 

I'm planning to start removing components from the X endtable tomorrow morning at ~10AM - if anyone
thinks I should hold off and do some further checks/planning, let me know before this so that I can do the needful.
    Reply  Tue Apr 5 11:42:17 2016, gaericqutam, Update, endtable upgrade, TABLE REMOVAL 
There is currently no table at the X end! 

We have moved the vast majority of the optics to a temporary storage breadbord, and moved the end table itself to the workbench at the end. 

Steve says Transportation is coming at 1PM to put the new table in.
    Reply  Wed Apr 6 17:52:21 2016, gautam, Update, endtable upgrade, First contact cleaning commenced 
I've begun cleaning the optics that will eventually go back onto the newly installed X-endtable. We decided that First Contact was the way to go
(as opposed to methanol drag wiping). Koji demonstrated the application of the (red) First Contact solution onto a 2" mirror - I then proceeded to
work on the rest of the optics. We are broadly following the procedure in E1000079 - first one coat of First Contact solution is applied, then a small
    Reply  Thu Apr 7 12:51:24 2016, gautam, Update, endtable upgrade, Beam height differences 
Steve has finished installing the enclosure on the new endtable. So Eric and I decided to try and lock the X arm and measure the beam height of the transmitted
IR beam relative to the endtable. We initially thought of using POX DC as a the LSC trigger but this did not work as there was no significant change in
it when the arm was flashing. Eric then tried misaligning the ITM and using AS110 as a trigger - this worked. We then recompiled the ASS model to take
    Reply  Thu Apr 7 14:30:58 2016, Steve, Update, endtable upgrade, ETMX table height ETMXbrs.pngETMX.jpgIMG_0618.JPGETMX.jpgETMXwc.jpg
 




Quote:



Steve has finished installing
    Reply  Fri Apr 8 09:13:20 2016, Steve, Update, endtable upgrade, ETMX-T beam height ETMXalignedT.pngETMXF.jpg
X arm resonating after alignment, beam height on ETMX optical table ~4.75"

 
Entry  Wed Apr 13 00:56:07 2016, gautam, Update, endtable upgrade, X endtable repopulation 
Over the last couple of days, I've been working on restoring the optical layout on the X-endtable. Some notes about the status as of today:

Lightwave NPRO output power

The output power from the lightwave NPRO is about 210mW (as measured with the calorimeter). This is significantly lower than the value of ~300mW
    Reply  Wed Apr 13 11:00:28 2016, Steve, Update, endtable upgrade, X endtable repopulation 
ETMX optical table is grounded to ETMX chamber through 1 Mohms

The doubling oven temp controller is installed to reach its cable.

 
    Reply  Wed Apr 13 18:25:07 2016, gautam, Update, endtable upgrade, Lightwave health check 
[Koji,gautam]

Lightwave NPRO information:

Model: 126-1064-700
    Reply  Fri Apr 15 18:38:12 2016, gautam, Update, endtable upgrade, Lightwave health check - NO IMPROVEMENT 
I re-measured the power levels today.

We have ~205mW out of the NPRO, and ~190mW after the Faraday. It doesn't look like the situation is going to improve dramatically. I'm
going to work on a revised layout with the Innolight as soon as I've profiled the beam from it, and hopefully, by Monday, we can decide that we are
    Reply  Tue Apr 19 18:37:29 2016, gautam, Update, endtable upgrade, Laser swap + optical layout IR_modematch_19April2016_2.pdf
Summary of work done over the last two days


Lightwave NPRO + controller moved to PSL table


​​The interlock is not connected
to the controller
Controller is not powered


Innolight NPRO + controller installed at endtable

​​​​Interlock
    Reply  Thu Apr 21 14:25:52 2016, gautam, Update, endtable upgrade, Green light recovered IMG_6567.JPGIMG_6568.JPGCVI_reflectivity.jpeg
I've made progress on the new layout up to the doubling oven. After doing the coarse alignment with the diode current to the NPRO at ~1A, I turned
it back up to the nominal 2A. I then rotated the HWP before the IR Faraday such that only ~470mW of IR
power is going into the doubler (the rest is being dumped on razor beam dumps). After tuning the alignment of the IR into the doubling oven using the steering
    Reply  Tue Apr 26 15:22:35 2016, Steve, Update, endtable upgrade, Cleaning ETMX vacuum dirty window ETMX-Tvp.jpgETMX-TvpDetail.jpg
Gautom is progressing with the layout nicely. The X-arm transmission window have not seen cleaning for decades. This should be the time to do it. Here
is picture of dirtiness.

It is not that simple... How much effort should we put in it? The hole table with 1W inno laser plus... set up now about ~500 lbs  We can
    Reply  Tue Apr 26 23:19:42 2016, gautam, Update, endtable upgrade, Green aligned to arm - high order mode flashes seen IMG_2219.JPGIMG_2220.JPG
Attachment #1

Layout as of today. Most of the green path is done. The Green REFL PD + PZT mirrors have not been hooked up to their respective power sources
yet (I wonder if it's okay to start laying cables through the feedthroughs on either end of the table already, or
    Reply  Wed Apr 27 15:04:47 2016, Steve, Update, endtable upgrade, Cleaning ETMX vacuum dirty window 1cETMX-Tcmp.jpg
It looks very promising.

 
    Reply  Thu Apr 28 00:41:08 2016, gautam, Update, endtable upgrade, more progress - Transmon PD installed 
The IR Transmon system is almost completely laid out, only the QPD remains to be installed. Some notes:


The "problem" with excessive green power reflected from the harmonic separator has been resolved. It is just very sensitive
to the angle of incidence. In the present configuration, there is ~10uW of green power reflected from either side, which shouldn't be too worrisome.
    Reply  Fri Apr 29 00:55:46 2016, gautam, Update, endtable upgrade, green PDH locked to Xarm 
Using the modulation frequency suggested here, I hooked up the PDH setup at the X-end and
succeeded in locking the green to the X arm. I then rotated the HWP after the green Faraday to maximize TRX output, which after a cursory alignment optimization
is ~0.2 (I believe we were used to seeing ~0.3 before the end laser went wonky). Obviously much optimization/characterization remains to be done. But for
    Reply  Fri Apr 29 16:05:23 2016, gautam, Update, endtable upgrade, Cleaning ETMX vacuum dirty window IMG_0755.JPG
After a second round of F.C. application, I think the window is clean enough and there are no residual F.C. pieces anywhere near the central parts of
the window (indeed I think we got most of it off). So I am going to go ahead and install the Oplev. 




    Reply  Mon May 2 19:14:18 2016, gautam, Update, endtable upgrade, Optical layout almost complete ETMX_wedge.pdf
With Steve's help, I installed the Oplev earlier today. I adjusted the positions of the two lenses until I deemed the spot size on the QPD satisfactory
by eye. As a quick check, I verified using the DTT template that the UGF is ~5Hz for both pitch and yaw. There is ~300uW of power incident on the QPD (out
of ~2mW from the HeNe). In terms of ADC counts, this is ~13,000 counts which is about what we had prior to taking the endtable apart. There are a couple
    Reply  Thu May 5 03:05:37 2016, gautam, Update, endtable upgrade, ALS status update ALS_noiseSpec_5May2016_2.pdfCoherence_5May2016.pdfimage.jpeg
[ericQ, gautam]

Today we spent some time looking into the PDH situation at the X end. A summary of our findings.


There is something that I don't understand with regards to the modulation signal being sent to the laser PZT via the sum+HPF pomona
    Reply  Thu May 5 14:05:01 2016, rana, Update, endtable upgrade, ALS status update 
All seems very fishy. Its not good to put attenuators and filters in nilly-willy.


Once the post-PD bandpass has been designed and constructed, you should be able to use whatever PD gain setting gives you the best SNR.
There's no need to use more PD gain than necessary; it just reduces the PD bandwidth. What is the input referred current noise of the PD at the different
    Reply  Thu May 5 21:28:44 2016, gautam, Update, endtable upgrade, Innolight PZT capacitance 
I suggested in an earlier elog that after the repair of the NPRO, the PZT capacitance
may have changed dramatically. This seems unlikely - I measured the PZT capacitance with the BK Precision LCR meter and found it to be 2.62
nF, which is in excellent agreement with the numbers from elogs 
    Reply  Thu May 19 16:29:20 2016, Steve, Update, endtable upgrade, Optical layout almost complete ETMX_4x3_closed.jpgsealedETMXenclosure.jpg
 

 
    Reply  Fri Sep 30 19:53:07 2016, gautam, Update, endtable upgrade, X end IR pickoff fiber coupled 
[johannes, gautam]

Today we re-installed the fiber coupler on the X-endtable to couple some of the PSL light into a fiber that runs to the PSL table, where it is
combined with a similar PSL pickoff to make an IR beat between the EX AUX laser and the PSL. The main motivation behind this was to make the process of