40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 336 of 349  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authorup Type Category Subject Text Attachments
  7056   Tue Jul 31 08:01:22 2012 steveUpdateVACcc1 switched

    

       
            
 cc1h1d.png 
  7071   Wed Aug 1 16:38:46 2012 steveUpdateSUSspare SRMU 03 optic movedSOS optics prepared to be hanged are moved
from the South Flow Bench to S15 Clean Cabinet.
SRMU 03 (1-25-2010) specification
 IMG_1464.JPGIMG_1465.JPGIMG_1466.JPG 
  7087   Mon Aug 6 07:59:33 2012 steveUpdateSUSPRM oplevs servo is still bad

    

       
            
 PRMeq.png 
  7088   Mon Aug 6 09:46:31 2012 steveUpdateIOOpoweroutage turns laser off
. Power
  
  7089   Mon Aug 6 10:53:32 2012 steveUpdateVACstatus: vauum normal 
 The power outage did not have
any effect on the vacuum system.  I
 CCgauges.png 
  7091   Mon Aug 6 16:48:43 2012 steveUpdateSUSSRM oplev is clippingThe SRM oplev beam is clipping.   
  7106   Tue Aug 7 16:11:23 2012 steveUpdateSUSoptical table box wall proposal Sanwiched wall as shown: 1"
clear acrylic, 2 layers of 0.004" thick
"window tint", 1 layer of 
 IMG_1479.JPGIMG_1478.JPG 
  7154   Sun Aug 12 01:21:26 2012 steveUpdateSAFETYexit door left unlockedCaltech security called me at 1am Sunday.
 Control room emergency
  
  7160   Mon Aug 13 15:31:09 2012 steveUpdateGenerallarger optical tables at the endsI'm proposing larger
optical tables at the ends to avoid the
existing overcrowding. This would allow the
 ETMYtable.jpgETMY4X3.jpg 
  7194   Wed Aug 15 16:01:47 2012 steveUpdateGenerallarger optical tables at the ends ?The drawing of the 4' x 2'  table
cover can be seen at entry  #6190
The new proposed wall #7106 
 bottleneck.jpg 
  7248   Wed Aug 22 11:41:20 2012 steveUpdateGeneralgrout plate for optical table at the endsReinforced concrete grout plate for existing
carbon steel stands at the ends.
 
 IMG_1561.JPG08231201.PDF 
  7458   Mon Oct 1 17:03:01 2012 steveUpdateSUSETMY oplev relayed

    

       
            
 IMG_1673oplevETMY.jpg 
  7538   Fri Oct 12 16:59:26 2012 steveUpdateSUSTT PITCH damping

    

       
            
  
  7544   Mon Oct 15 08:08:33 2012 steveUpdateSUSPRM damping restored

    

       
            
  
  7652   Thu Nov 1 08:48:42 2012 steveUpdateAlignmentprogress, then setback - trend of BS table shift

    

       
            
 alignmentstrugle2d.pngalignmentstrugle2da.pngbefpd09252012.png 
  7831   Fri Dec 14 09:05:04 2012 steveUpdatePEMTT after eq 6.1 
 SRM, ITMY and MC3 moved some
what, but how are the TT? It may worth looking
 eq6.1.png 
  8240   Wed Mar 6 11:33:09 2013 steveUpdateSAFETYsafety audit 2013 
         
           
 IMG_0010.JPG 
  8287   Wed Mar 13 16:04:24 2013 steveUpdateSAFETYlaser safety glasses checked All safety glasses were cleaned in
soapy water by Bob. I measured their transmission
at 1064 nm, 150 mW,  beam diameter 1.5
 safetyglasseschecked.jpg 
  8309   Tue Mar 19 10:30:00 2013 steveUpdateSAFETYcrane inspection 2013 
Professional crane inspector: Fred
Goodbar found two small leaks at the Vertex
 sippingOIL.jpg03191301.PDF 
  8661   Fri May 31 10:25:17 2013 steveUpdatesafetyfirst aid kits refilled

    

       
            
 refilledFAidK.jpg 
  8687   Thu Jun 6 16:33:19 2013 steveUpdatesafetyupdated laser inventory Updated laser inventory and operator
list. They are posted in the 40m wiki and
entry doors of the 40m IFO room.
 ELSOconnected.jpg 
  9090   Fri Aug 30 08:08:29 2013 steveUpdatesafetyfire horns-flashers tested OK 
 We had fire alarm tests
 and evacuation drills at 1:30pm yesterday.
  
  9653   Wed Feb 19 08:07:01 2014 steveUpdatesafetyannual laser safety glasses check  
 All 40m laser safety glasses
are cleaned and measured this morning. 
 AA2014checked.jpg2014check.jpg 
  9672   Tue Feb 25 16:54:57 2014 steveUpdatesafetysafety audit 2014 
 We had our annual safety inspection
today.  
  
  9681   Thu Feb 27 13:11:13 2014 steveUpdatesafetysafety audit correction

    

       
            
 noDaisyChaining.jpgZbThumbnail.info 
  9699   Thu Mar 6 11:43:17 2014 steveUpdateGeneralGuralp control unitCMG-40T handheld controller unit is missing
its power supply. In order to zero the instrument
one has to apply plus and minus DC voltage.
 GuralpCU.jpgBAH.jpg 
  9704   Fri Mar 7 16:56:17 2014 steveUpdateIOOIOO qpds centered

    

       
            
 IOOqpdCentered.png 
  9705   Mon Mar 10 09:28:48 2014 steveUpdateIOOIOO pointing 2 days Morning seconds without adjustment.
 
 IOOpointing2d.pngmorningseconds.png 
  9725   Thu Mar 13 16:05:48 2014 steveUpdatesafetysafety audit 2014

    

       
            
 T1400198-v1-CIT-LIGO_Labs_Annual_Safety_Audit_2014.pdf 
  9730   Mon Mar 17 10:50:58 2014 steveUpdatesafety2014 annual crane certification

    

       
            
 2014craneCert.jpg 
  9743   Fri Mar 21 14:59:44 2014 steveUpdatePEMcontroling dustPlease take a look at the table top with
the flashlight before
 IMG_0044.JPG 
  9748   Mon Mar 24 22:13:37 2014 steveUpdateGeneralPower Failure

    

       
            
 poweroutage.png 
  9749   Tue Mar 25 14:52:57 2014 steveUpdateVACvacuum is recovered Out
gassing plus leak rate   0.15 
 17hrsNoPumping.png 
  9757   Fri Mar 28 16:26:20 2014 steveUpdateVACRGA scan after power failure

    

       
            
 afterPowerFailure.png 
  9802   Fri Apr 11 14:57:53 2014 steveUpdateLSCcongratulation 
 
 whenSheisHappy3h.pngmc4hArms3hrs.png 
  9870   Mon Apr 28 17:27:29 2014 steveUpdatesafetysafety audit 2014

    

       
            
  
  9873   Tue Apr 29 00:11:03 2014 steveUpdatesafetysafety audit 2014Be aware that
this may affect POP QPD and POP RF Thorlabs
  
  9895   Thu May 1 17:14:36 2014 steveUpdatePSLthin window AR measuredCVI broadband AR coating was measured at
the PSL-enclosure table around 9-10am today.
The 2W Innolight first PBS  S polarization
  
  9900   Fri May 2 08:15:54 2014 steveUpdatesafetysafety audit 2014 
 Late adition: CHECK all viewport covers.
 solidCoverRequired.jpg 
  9902   Fri May 2 10:38:29 2014 steveUpdatePSLthin window AR measured

    

       
            
  
  9914   Tue May 6 09:46:50 2014 steveUpdatePEMcleaning day Keven and Steve,
We cleaned around the Vertex chambers,
PSL and MC2 floor areas.
 120d.png 
  9915   Tue May 6 10:22:28 2014 steveUpdateCDSc1ioo dolphin fiber

    

       
            
 dolphin1x2.png 
  9918   Tue May 6 18:32:14 2014 steveUpdateLSCTRY 60Hz noise huntThis
is an effort to get rid of our ground loops
 ETMY-ISCT_EISOL.jpg 
  9921   Wed May 7 14:01:36 2014 steveUpdateLSCTRY 60Hz noise hunt

    

       
            
  
  9933   Thu May 8 17:25:17 2014 steveUpdateLSCTRY 60Hz noise hunt I
worked at the ETMY-ISCT this morning and
  
  9937   Fri May 9 11:23:11 2014 steveUpdateGreen Lockingdecreased X green light power Green light power decreased from 3 mW to
1 mW at the ETMX-ISCT shutter. More later.
  
  9941   Mon May 12 14:42:25 2014 steveUpdateendtable upgradeoptical table enclosure wall proposal and table at ETMY

    

       
            
 Hilite70.jpgETMY-ISCT.jpgRoscoThermashield.pdf 
  9965   Fri May 16 16:08:12 2014 steveUpdateLSCIsolating base plates Electronic components should be ISOLATED
as they are installed on the optical tables.
This is essential to avoid ground
 ISObaseplates.jpg 
  10007   Mon Jun 9 09:41:06 2014 steveUpdatesafetysafety training2014 surf students Nichin and Akhil received
40m specific basic safety training last week.
 2014surfs.jpg 
  10069   Thu Jun 19 10:39:22 2014 steveUpdatesafetysurf safety training 
 Andres Medina and Andrew "Harry"
Hall received 40m specific safety training.
 2014surfsAA.jpg 
ELOG V3.1.3-