1671
|
Fri Jun 12 09:56:38 2009 |
steve | Configuration | VAC | new maglev installed | Joe and Steve
The retrofitted Osaka 390 was installed |
|
1672
|
Fri Jun 12 15:34:49 2009 |
steve | Configuration | VAC | maglev is running |
|
|
1673
|
Mon Jun 15 15:17:33 2009 |
josephb, Steve | Configuration | VAC | Vacuum control and monitor screens | We updated the vacuum control and monitor
screens (C0VAC_MONITOR.adl and C0VAC_CONTROL.adl).
We also updated the /cvs/cds/caltech/target/c1vac1/Vac.db |
|
1674
|
Mon Jun 15 16:31:36 2009 |
steve | Configuration | VAC | RGA is scanning new Maglev |
|
|
1677
|
Tue Jun 16 09:02:30 2009 |
steve | Configuration | VAC | new maglev RGA scan | The maglev fore line pressure is 3e-6 torr
at CC2 after 4 days of pumping. Varian turbo
V-70 is pumping on it through V4 and VM2 |
 |
1682
|
Wed Jun 17 01:07:50 2009 |
rob | Configuration | Computers | matapps on /cvs/cds | I checked out a copy of matapps into /cvs/cds/caltech/apps/lscsoft
so that I could find the matlab function
strassign.m, which is necessary for some |
|
1686
|
Fri Jun 19 13:38:42 2009 |
Alberto | Configuration | Computers | elog rebooted | Today I found the elog down, so I rebooted
it following the instructions in the wiki. |
|
1688
|
Fri Jun 19 14:30:47 2009 |
Alberto | Configuration | Computers | elog rebooted |
|
|
1689
|
Sun Jun 21 00:08:26 2009 |
rana | Configuration | Computers | elog rebooted |
nodus:log>dmesg
|
|
1691
|
Tue Jun 23 15:19:42 2009 |
steve | Configuration | VAC | V1 is open |
|
|
1692
|
Tue Jun 23 23:14:36 2009 |
Clara | Configuration | PEM | Accelerometers relocated | Both accelerometers have been moved in
an attempt to optimize their positions. The
MC1 accelerometer was moved from one green |
|
1693
|
Wed Jun 24 09:21:19 2009 |
steve | Configuration | VAC | IFO RGA scan with Maglev & Cryo |
|
 |
1743
|
Tue Jul 14 14:54:19 2009 |
steve | Configuration | Computers | fb40m2 in 1Y6 | Alex and Steve,
SunFire x4600 ( not MEGATRON
2 , it is fb40m2 ) and JetStor ( 16 x 1 TB |
|
1764
|
Mon Jul 20 12:35:21 2009 |
rob | Configuration | Locking | alignment biases funny | I found the alignment biases for the PRM
and the SRM in a funny state. It seemed
like they had been "saved" in badly |
|
1771
|
Tue Jul 21 18:46:47 2009 |
steve | Configuration | Computers | computers are down | All suspentions are kicked up. Sus dampings
and oplev servos turned off.
c1iscey and c1lsc are down. c1asc |
|
1772
|
Wed Jul 22 01:57:19 2009 |
Alberto | Configuration | Computers | computers are down |
|
|
1773
|
Wed Jul 22 09:04:10 2009 |
Alberto | Configuration | Computers | computers are down |
|
|
1776
|
Wed Jul 22 11:14:11 2009 |
Alberto | Configuration | Computers | computers are down |
|
|
1777
|
Wed Jul 22 11:18:49 2009 |
rob | Configuration | Computers | sticky sliders |
|
|
1785
|
Fri Jul 24 11:04:11 2009 |
Alberto | Configuration | Computers | elog restarted | This morning I found the elog down. I restarted
it using the procedure in the wiki. |
|
1809
|
Wed Jul 29 19:31:17 2009 |
rana | Configuration | Computers | elog restarted | Just now found it dead. Restarted it. Is
our elog backed up in the daily backups? |
|
1810
|
Wed Jul 29 19:41:58 2009 |
Chris | Configuration | General | EUCLID-setup configuration change | David and I were thinking about changing
the non-polarizing beam splitter in the EUCLID
setup from 50/50 to 33/66 (ref picture). |
|
1837
|
Wed Aug 5 15:57:05 2009 |
Alberto | Configuration | Computers | PMC MEDM screen changed | I added a clock to the PMC medm screen.
I made a backup of the original file
in the same directory and named it *.bk20090805 |
|
1838
|
Wed Aug 5 16:33:50 2009 |
steve | Configuration | PSL | new PSL output iris | I installed an improvised version of PSL
output beam iris at the output periscope
last week. |
|
1852
|
Fri Aug 7 09:50:57 2009 |
steve | Configuration | VAC | IFO pressure rose to 2.3 mTorr | IFO pressure was 2.3 mTorr this morning,
The Maglev's foreline valve
V4 was closed so P2 rose to 4 Torr. The Maglev |
|
1857
|
Fri Aug 7 16:11:11 2009 |
steve, rob | Configuration | VAC | IFO pressure rose to 2.3 mTorr |
|
|
1867
|
Sat Aug 8 15:08:14 2009 |
rana | Configuration | PSL | SMOO settings updated in psl.db and SVN updated | I have added/modified SMOO settings to
all of the records in psl.db appropriately.
Changes checked in to SVN. |
|
1877
|
Mon Aug 10 16:41:31 2009 |
Alberto | Configuration | PSL | PMC Visibility | Alberto, Rana
lately we've been trying to better
understand what's preventing the arm power |
|
1878
|
Mon Aug 10 17:27:47 2009 |
rob | Configuration | LSC | TRX, TRY gain |
These are the settings which determine
the transmon (eg, TRX) amplitude, and which |
|
1892
|
Wed Aug 12 13:35:03 2009 |
josephb, Alex | Configuration | Computers | Tested old Framebuilder 1.5 TB raid array on Linux1 | Yesterday, Alex attached the old frame
builder 1.5 TB raid array to linux1, and
tested to make sure it would work on linux1. |
|
1893
|
Wed Aug 12 15:02:33 2009 |
Alberto | Configuration | Computers | elog restarted | In the last hour or so the elog crashed.
I have restarted it. |
|
1899
|
Thu Aug 13 22:53:48 2009 |
Yoichi | Configuration | PSL | FSS nominal common gain changed, MC WFS centered | Koji, Yoichi
We found that the FSS PC feedback
easily goes crazy (saturated).
It |
|
1901
|
Fri Aug 14 10:39:50 2009 |
josephb | Configuration | Computers | Raid update to Framebuilder (specs) | The RAID array servicing the Frame builder
was finally switched over to JetStor Sata
16 Bay raid array. Each bay contains a 1 |
|
1939
|
Tue Aug 25 01:27:09 2009 |
rana | Configuration | Computers | Raid update to Framebuilder (not quite) |
|
|
1940
|
Tue Aug 25 02:37:53 2009 |
rana | Configuration | Computer Scripts / Programs | Firefox 3.5 installed for 64 bit linux in apps/ | |
|
1947
|
Tue Aug 25 23:16:09 2009 |
Alberto, rana | Configuration | Computers | elog moved in to the cvs path | In nodus, I moved the elog from /export
to /cvs/cds/caltech. So now it is in the
cvs path instead of a local directory on |
|
1950
|
Wed Aug 26 16:10:28 2009 |
Peter King | Configuration | PSL | PSL reference cavity temperature box modifications | The 40m Lab reference cavity temperature
box S/N BDL3002 was modified as per DCN D010238-00-C.
These were: |
|
1953
|
Wed Aug 26 16:35:03 2009 |
Alberto | Configuration | PSL | PSL reference cavity temperature box modifications | Basically, in addition to the replacement
of the resistors with metal film ones, Peter
replaced the chip that provides a voltage |
|
1961
|
Fri Aug 28 15:30:15 2009 |
steve | Configuration | General | POX rfpd removed | I removed POX rfpd to see how it is mounted
on its base. It is here on the work bench
just in case someone wants to use it the |
|
1963
|
Tue Sep 1 13:52:06 2009 |
steve | Configuration | General | POX rfpd is back & needs alignment |
|
|
1966
|
Thu Sep 3 23:41:32 2009 |
Alberto | Configuration | LSC | POX (PD3) aligned | Today I aligned the beam to PD3 (POX) since
Steve had moved it.
The DC power read 1.3mV when the |
|
1971
|
Mon Sep 7 23:51:48 2009 |
rana | Configuration | Computers | matlab installed: 64-bit linux | I have wiped out the 2008a install of 64-bit
linux matlab and installed 2009a in its place.
Enjoy. |
|
1973
|
Tue Sep 8 15:14:26 2009 |
rana, alex | Configuration | DAQ | RAID update to Framebuilder: directories added + lookback increased | Alex
logged in around 10:30 this morning and, |
|
1974
|
Tue Sep 8 16:01:52 2009 |
steve | Configuration | VAC | RGA was separeted from IFO | The RGA isolation valve VM1 was closed
since Aug 24, 2009 I installed the
new UPS that time. |
|
2005
|
Fri Sep 25 19:56:08 2009 |
rana | Configuration | Computers | NTPD restarted on c1dcuepics (to fix the MEDM screen times) | [SIZE=3][FONT=Tahoma]restarted ntp on op440m
using this syntax[/FONT][/SIZE]
|
|
2014
|
Mon Sep 28 23:13:14 2009 |
Jenne | Configuration | Electronics | Rob is breaking stuff.... | Koji and I were looking for an extender
card to aid with MZ board testing.
Rob went off on a quest to find one. |
|
2016
|
Tue Sep 29 01:50:10 2009 |
rob | Configuration | LSC | new modulation frequencies | Mode cleaner length measured tonight.
33196198 |
|
2019
|
Tue Sep 29 16:14:44 2009 |
rob | Configuration | Electronics | Rob is breaking stuff.... |
|
|
2072
|
Thu Oct 8 22:17:15 2009 |
rana | Configuration | DMF | input channels changed | I changed the input channels of the DMF
recently so that it now uses 3 Guralp channels
in addition to the 3 ACC and 1 Ranger. |
|
2073
|
Fri Oct 9 01:31:56 2009 |
rana | Configuration | DAQ | tpchn mystery | Does anyone know if this master
file is the real thing that's in use now? |
|