Mon Jan 31 16:12:11 2011, steve, Update, VAC, Vertex crane upgrade shorth coming 
|
Fri Feb 11 09:27:03 2011, steve, Configuration, VAC, RGA scan 
|
Wed Mar 9 17:29:11 2011, steve, Summary, VAC, single O-ring protection 
|
Fri May 6 15:59:40 2011, steve, Update, VAC, TP3 fore pump replaced
|
Fri Jul 22 10:13:41 2011, steve, Update, VAC, RGA scan at day 213
|
Fri Jul 22 10:24:34 2011, steve, Update, VAC, pressure plot at day 213
|
Wed Jul 27 15:38:01 2011, steve, Update, VAC, beam traps for vacuum
|
Mon Aug 1 08:52:37 2011, steve, Update, VAC, preparation to vent  
|
Wed Aug 3 09:40:13 2011, steve, Update, VAC, vent
|
Wed Aug 3 11:34:59 2011, kiwamu, Update, VAC, Re: vent
|
Wed Aug 3 16:18:30 2011, steve, Update, VAC, vent is almost finished
|
Mon Aug 8 15:52:39 2011, steve, Update, VAC, back ground rga scan 
|
Tue Aug 9 16:54:47 2011, steve, Update, VAC, scratch on vac door
|
Wed Aug 10 22:47:22 2011, rana, Summary, VAC, Vacuum Workstation (linux3) re-activated
|
Mon Aug 22 11:40:08 2011, steve, Update, VAC, cranes checked
|
Tue Aug 23 16:23:33 2011, Jenne, Update, VAC, Access connector in place
|
Thu Aug 25 17:14:49 2011, steve, Update, VAC, clean room fashion changes 
|
Thu Sep 1 11:03:22 2011, steve, Update, VAC, back ground rga scan 
|
Wed Sep 7 00:47:51 2011, Jenne, Update, VAC, PUMP is a GO!
|
Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started
|
Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight
|
Wed Sep 7 21:45:16 2011, kiwamu, Update, VAC, pump stopped. Pressure is at 450 mtorr
|
Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted 
|
Wed Sep 21 11:35:07 2011, steve, Update, VAC, RGA scan
|
Fri Sep 23 16:25:01 2011, steve, Update, VAC, vac rack UPS battery replaced 
|
Fri Sep 30 18:35:42 2011, steve, kiwamu, Update, VAC, vacuum set for poweroutage
|
Mon Oct 3 08:38:21 2011, steve, Summary, VAC, Recovery from the power shutdown is completed
|
Thu Oct 13 21:40:59 2011, rana, Summary, VAC, Recovery from the power shutdown is completed
|
Fri Oct 28 18:33:59 2011, steve, Update, VAC, leaking nitrogen line fixed
|
Mon Oct 31 08:55:19 2011, steve, Update, VAC, pressure plot at day 53
|
Mon Nov 14 15:46:14 2011, steve, Update, VAC, TP2's forepump changed
|
Fri Nov 18 16:37:14 2011, steve, Update, VAC, preparing for ac power interruption
|
Sun Nov 20 13:51:54 2011, steve, Update, VAC, vacuum is back up after ac interruption
|
Fri Jun 8 15:24:08 2012, steve, Update, VAC, RGA scan at day 276 and pressure plots  
|
Fri Jun 29 11:02:00 2012, steve, Update, VAC, the vent is at 500 torr 
|
Fri Jun 29 13:11:31 2012, steve, Update, VAC, 40m IFO at atm 
|
Fri Jun 29 22:56:35 2012, Jamie, Update, VAC, input telescope beam clipping on Faraday
|
Tue Jul 3 17:23:50 2012, steve, Update, VAC, pumpdown completed  
|
Fri Jul 6 09:27:40 2012, steve, Update, VAC, 4 days at atm
|
Fri Jul 6 09:52:35 2012, steve, Update, VAC, pump down hick up 
|
Thu Jul 12 16:27:04 2012, steve, Update, VAC, drypump changed
|
Fri Jul 27 14:28:36 2012, steve, Update, VAC, cold cathode gauges
|
Mon Jul 30 15:49:16 2012, steve, Update, VAC, cc1 switched
|
Tue Jul 31 08:01:22 2012, steve, Update, VAC, cc1 switched
|
Mon Aug 6 10:53:32 2012, steve, Update, VAC, status: vauum normal
|
Fri Aug 24 16:03:39 2012, Steve, Update, VAC, Vacuum related work at atm  
|
Sun Aug 26 20:58:21 2012, Jenne, Update, VAC, Don't vent!!!!
|
Tue Aug 28 09:37:33 2012, Steve, Update, VAC, RGA scan at day 56 
|
Tue Aug 28 17:59:03 2012, Jenne, Update, VAC, VENT: GO!
|
Wed Aug 29 11:47:21 2012, ericq, Update, VAC, Venting
|
|