Tue Feb 19 02:23:40 2013, yuta, Bureaucracy, General, action items for PRFPMI
|
Tue Feb 19 08:06:02 2013, yuta, Update, Electronics, POP path set up but AS55 is broken
|
Tue Feb 19 19:55:52 2013, yuta, Update, IOO, MC yaw input tuned
|
Wed Feb 20 03:13:10 2013, yuta, Update, Alignment, clipping centering checklist
|
Wed Feb 20 10:13:41 2013, yuta, Update, Alignment, PRC flashing brighter than last week
|
Wed Feb 20 19:48:16 2013, yuta, Update, Alignment, BS table oplev re-arranged
|
Wed Feb 20 20:15:29 2013, yuta, Update, Alignment, SRM oplev status
|
Wed Feb 20 20:58:37 2013, yuta, Update, Alignment, clipping centering checklist
|
Wed Feb 20 21:56:08 2013, yuta, Update, Alignment, clipping centering checklist
|
Thu Feb 21 15:21:07 2013, yuta, Update, VAC, all heavy doors on, started pumping down annulus
|
Sat Feb 23 00:34:28 2013, yuta, Update, Computers, crontab in op340m deleted and restored (maybe)
|
Sat Feb 23 07:14:58 2013, yuta, Update, LSC, can't lock Y arm
|
Sat Feb 23 15:26:26 2013, yuta, Update, Computers, crontab in op340m updated
|
Sat Feb 23 17:14:59 2013, yuta, Update, LSC, can't lock Y arm
|
Mon Feb 25 15:30:29 2013, yuta, Update, Alignment, Y arm locked, both colors
|
Mon Feb 25 21:25:14 2013, yuta, Update, Alignment, both arms locked in IR
|
Mon Feb 25 22:42:32 2013, yuta, Summary, Alignment, current IFO situation
|
Wed Feb 27 01:09:53 2013, yuta, Update, Locking, PRMI sideband/carrier locked 6x
|
Wed Feb 27 11:22:54 2013, yuta, Update, Computers, backup crontab
|
Wed Feb 27 11:59:43 2013, yuta, Update, SUS, PRM/BS coil re-balanced 
|
Thu Feb 28 02:43:49 2013, yuta, Update, LSC, some qualitative evidence of PRMI sideband lock
|
Thu Feb 28 03:25:27 2013, yuta, Update, LSC, PR gain ~ 25 from PRMI carrier lock
|
Thu Feb 28 05:54:54 2013, yuta, Update, RF System, phase tracker: calibration 
|
Thu Feb 28 06:51:17 2013, yuta, Update, RF System, phase tracker: noise level
|
Fri Mar 1 16:58:37 2013, yuta, Update, LSC, Xarm oscillation stopped
|
Sat Mar 2 05:53:15 2013, yuta, Update, LSC, stable lock of PRMI  
|
Sat Mar 2 20:09:12 2013, yuta, Update, RF System, phase tracker: DAQ noise limited
|
Mon Mar 4 16:46:31 2013, yuta, Update, SUS, oplev calibration for PRM 
|
Mon Mar 4 17:32:26 2013, yuta, Bureaucracy, General, flowchart for PRMI g-factor measurement
|
Tue Mar 5 06:27:14 2013, yuta, Update, LSC, intra-cavity power dependence on mirror misalignment   
|
Tue Mar 5 17:09:30 2013, yuta, Update, SUS, oplev calibration for ITMY 
|
Tue Mar 5 23:00:08 2013, yuta, Update, LSC, Yarm and PRC g-factor from misalignment measurement  
|
Tue Mar 5 23:37:11 2013, yuta, Update, SUS, PRM angular motion spectra
|
Thu Mar 7 01:43:35 2013, yuta, Update, LSC, calibrated MI differential length spectra 
|
Thu Mar 7 18:12:03 2013, yuta, Update, Alignment, Input beam drift ~ 0.1 mrad/h in pitch
|
Thu Mar 7 18:48:43 2013, yuta, Update, Computer Scripts / Programs, releasing my secret scripts
|
Fri Mar 8 02:17:04 2013, yuta, Update, LSC, calibration of PRM actuator  
|
Fri Mar 8 03:07:19 2013, yuta, Update, LSC, calibrated PRM-ITMY length spectra 
|
Fri Mar 8 15:27:42 2013, yuta, Update, Green Locking, PSL green shutter installed
|
Fri Mar 8 16:05:56 2013, yuta, Bureaucracy, General, action items for PRMI / ALS-FPMI
|
Wed Mar 13 08:34:33 2013, yuta, Update, Locking, TWO arms TWO colors
|
Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
|
Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation
|
Mon May 16 13:22:59 2022, yuta, Update, BHD, REFL and AS paths aligned at AP table 
|
Thu May 19 18:56:08 2022, yuta, Update, BHD, Current OSEM sensor values with all the suspensions aligned
|
Wed May 25 16:38:27 2022, yuta, Update, SUS, Suspensions quick health check 
|
Wed May 25 17:34:47 2022, yuta, Configuration, BHD, IFO recovery - IFO alignment
|
Thu May 26 19:55:43 2022, yuta, Configuration, BHD, Oplevs centered, BHD DCPDs are now online    
|
Fri May 27 17:45:53 2022, yuta, Configuration, BHD, BHD camera installed, GRY aligned
|
Wed Jun 1 11:56:28 2022, yuta, Update, ALS, Shutter driver for GRY replaced
|
|