9254
|
Fri Oct 18 15:18:49 2013 |
Steve | Update | PEM | particle count peak or ... | Sunday evening fireworks. Manasa heard
it. |
 |
9952
|
Wed May 14 10:04:06 2014 |
Steve | Summary | SUS | oplev laser and temperature | ETMX oplev qpd gain has to be increased.
|
|
6323
|
Mon Feb 27 14:35:22 2012 |
steve | Update | SUS | oplev YAW transfer functions | The BS and the PRM have 3.3 Hz resonant
gain filters that kill the phase margins.
|
|
6309
|
Thu Feb 23 10:53:54 2012 |
steve | Update | SUS | oplev PIT transfer functions | Oplev transfer functions PIT UGF
were optimized to be at 2-3 Hz with 60 degree
minimum phase margin by adjuting oplev gains. |
|
974
|
Fri Sep 19 11:48:14 2008 |
steve | Update | Computers | old hubs can make one happy | Joseph finds a XIX century bottle neck hub:
CentreCOM 3624TR 10Base-T
and happily replaces it with Netgear GS724T |
|
3422
|
Fri Aug 13 18:32:48 2010 |
steve | Update | PEM | new legs attached to optical table | Koji, Rana and Steve
The floor preparation continued today. |
   |
8822
|
Wed Jul 10 14:49:00 2013 |
Steve | Update | Green Locking | more fiber protective tubing layed |
|
|
3505
|
Wed Sep 1 10:54:15 2010 |
steve | Update | PEM | more crane balancing | Crane balancing at the south end is continuing
today. |
|
3288
|
Mon Jul 26 08:51:31 2010 |
steve | Update | PEM | lowering AC setpoint by 2F makes PSL happy |
|
|
3745
|
Wed Oct 20 16:41:41 2010 |
steve | Omnistructure | General | laser chiller leaving for MIT | |
|
12227
|
Wed Jun 29 14:32:22 2016 |
Steve | Update | SUS | how to remove epoxy from optics |
Hi Steve -
|
|
12231
|
Thu Jun 30 10:03:16 2016 |
Steve | Update | SUS | how to remove epoxy from optics | Proposed Acetone soak dish for SOS epoxy
softening.
It has good acces through 5" |
 |
12241
|
Tue Jul 5 09:25:31 2016 |
Steve | Update | SUS | how to remove epoxy from optics | Glass soaking dish with teflon guides.
|
 |
9643
|
Tue Feb 18 10:10:07 2014 |
Steve | Update | PEM | floor cleaning under racks |
|
|
9689
|
Tue Mar 4 17:07:27 2014 |
Steve | Update | PEM | floor cleaning under racks |
|
|
9623
|
Tue Feb 11 16:49:36 2014 |
Steve | Update | PEM | floor cleaning | Keven, Steve
The floor was cleaned under the east |
|
7999
|
Tue Feb 5 09:08:11 2013 |
Steve | Update | PEM | exterier doors to be painted |
|
|
12930
|
Thu Apr 6 15:35:44 2017 |
Steve | Update | PEM | envioirmental noise | Building:
Central Engineering Services
|
|
3591
|
Mon Sep 20 17:10:10 2010 |
steve | Configuration | PSL | enclosure beam guides to IFO are installed | The PSL out 2" OD beam guide
tube was cut 1.5" shorter to 13.5"
The 10" OD 0.25" |
|
14294
|
Wed Nov 14 14:35:38 2018 |
Steve | Update | ALARM | emergency calling list for 40m Lab | It is posted at the 40m
wiki with Gautam' help. Printed copies
posted around doors also. |
|
9098
|
Tue Sep 3 14:23:21 2013 |
Steve | Update | PEM | earthquakes | ~Vancuver, Canada earthquakes: magnitude
6, 5 and more shaking
|
|
11932
|
Thu Jan 14 13:44:05 2016 |
Steve | Update | SUS | earthquake 3.6M | No obvious sign of damage.
|
 |
11975
|
Thu Feb 4 10:14:52 2016 |
Steve | Update | SUS | earthquake 3.5M |
|
|
3404
|
Thu Aug 12 10:56:31 2010 |
steve | Update | Environment | dusty floor work in progres | I powered down 1Y1 and 1Y2 instrument racks
of MC and RF-systems this morning.
Both racks, SP table, clean tools-parts |
|
12656
|
Fri Dec 2 10:57:08 2016 |
steve | Update | PEM | door seal replaced | The south end door leaky weather seals
replaced.
The aim is here to get some overpressure |
|
12020
|
Fri Mar 4 11:07:10 2016 |
Steve | Update | safety | crane inspection completes 2016 safey audit | All 3 cranes inspected by professional
and load tested with 450 lbs at max reach.
|
|
13630
|
Mon Feb 12 14:56:00 2018 |
Steve | Update | safety | crane inspection 2018 | Our 3 cranes passed professional
inspection. Fred Goodbar of Konacrane with
450 lbs load at full extension. |
  |
12868
|
Mon Mar 6 09:12:59 2017 |
Steve | Update | safety | crane inspection 2017 | All 3 cranes inspected by professional
Fred Goodbar of Konecranes and load tested
with 450 lbs at max reach on Friday, March |
|
5307
|
Fri Aug 26 10:45:17 2011 |
steve | Update | General | crane at ETMY is fixed |
|
 |
10023
|
Wed Jun 11 08:57:49 2014 |
Steve | Update | PEM | air cond maintenance tomorrow morning |
|
|
12572
|
Wed Oct 19 17:02:34 2016 |
rana | Update | General | Viewports & coating of 2016 | These old specs are not so bad. But we
now want to get replacements for the TRX
and TRY and PSL viewports that are R <0.1% |
|
12570
|
Wed Oct 19 14:43:15 2016 |
Steve | Update | General | Viewports & coating of 2001 | Tilted viewports installed in horizontal
position. Atm2 |
 |
14106
|
Thu Jul 26 15:11:18 2018 |
Steve | Update | General | Viewports & coating of 2001 | New optical quality BK-7 windows in 2001
[4 substrates ] AR coated R<0.75 % for
630-1064nm " |
|
12848
|
Thu Feb 23 14:50:26 2017 |
Steve | Update | General | USB microscope returned | The microscope shipped back to the vendor
for credit yesterday.
|
|
12813
|
Thu Feb 9 08:03:08 2017 |
Steve | Update | General | USB microscope ordered | http://www.amscope.com/3-5x-180x-boom-stand-trinocular-zoom-stereo-microscope-with-144-led-ring-light-and-10mp-camera.html
will be ordered today. |
|
12788
|
Thu Feb 2 12:17:48 2017 |
Steve | Update | General | USB microscope | This
AmScope microscope would have 3.5x-180x
magnification, calibratable measurement function, |
|
8432
|
Tue Apr 9 21:27:48 2013 |
Jenne | Update | 40m Upgrading | TRY temporarily in place |
|
|
12952
|
Thu Apr 27 16:41:13 2017 |
Eric Gustafson | Update | LSC | Status of the 40 m PD Frequency Response Fiber System | There two reports in the DCC describing
the state of the system as of October 2014
including: (1) Alex Cole’s “T1300618 |
|
12043
|
Wed Mar 23 11:55:47 2016 |
Steve | Update | General | Smart UPS 2200 Battery Replaced | Batteries replaced in control room UPS
after 3 years from replaceUPSbattery.com
|
|
8686
|
Thu Jun 6 15:46:10 2013 |
Max Horton | Summary | General | Smart UPS 2200 Batteries Replaced | Replaced the batteries successfully in
the control room. We just had to switch
the clips from the old batteries to the new |
|
352
|
Mon Mar 3 13:58:10 2008 |
steve | Update | Computers | RFM Network are down | The CODAQ_RFNETWORK are down, except C1SUSVME
& AWG |
|
353
|
Mon Mar 3 19:34:40 2008 |
rana | Update | Computers | RFM Network are down | [quote]The CODAQ_RFNETWORK are down, except
C1SUSVME & AWG[/quote]
All of the FE machines were found to be down |
|
7566
|
Wed Oct 17 08:30:49 2012 |
Steve | Update | SUS | PTICH damping needed |
|
|
13538
|
Fri Jan 12 10:26:24 2018 |
Steve | Update | PSL | PSL shelf work schedule | Measurements for good fit were made. The
new shelf will be installed on next Tuesday
at 2pm |
|
13549
|
Tue Jan 16 11:05:51 2018 |
gautam | Update | PSL | PSL shelf - AOM power connection interrupted | While moving the RefCav to facilitate the
PSL shelf install, I
bumped the power cable to the AOM driver. |
|
13551
|
Tue Jan 16 21:46:02 2018 |
gautam | Update | PSL | PSL shelf - AOM power connection interrupted | Johannes informed me that he touched up
the PMC REFL camera alignment. I am holding
off on re-soldering the AOM driver power |
|
12844
|
Wed Feb 22 08:54:17 2017 |
steve | Update | PEM | PSL enclousure particle count | ETMX sus damping recovered. PSL enclousure
is dusty at 20V rotation speed. Rainy days
as outside condition. |
|
7568
|
Wed Oct 17 11:15:05 2012 |
Den | Update | SUS | PITCH damping needed |
|
|
7571
|
Thu Oct 18 02:42:38 2012 |
Den | Update | SUS | PITCH damping needed |
|
7x |
7583
|
Fri Oct 19 18:30:07 2012 |
Den | Update | SUS | PITCH damping needed |
|
 |