40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 335 of 350  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  12086   Thu Apr 21 15:12:38 2016 SteveUpdateVACRGA is not working 




  
  12115   Wed May 11 16:39:01 2016 ericqUpdateVACc0rga alive, output wonky


  
  12116   Thu May 12 14:29:58 2016 gautamUpdateVACRGA back up and runningIt looks like the hardware reset did the
trick. Previously, I had just tried ssh-ing
into c0rga and rebooting it. At the time,
 RGAscan_12May2016.png 
  12117   Sun May 15 19:48:08 2016 SteveUpdateVACrun out of N23-4 hrs ago we run out of nitrogen. We
are back to Vacuum Normal

 
 noN2.png 
  12119   Tue May 17 14:46:51 2016 SteveUpdateVACRGA scan at day 595We have good RGA scan now. There was no
scan for 3 months.
 RGAscan595d.pngpd78-560Hz-d600.png 
  12174   Tue Jun 14 10:13:34 2016 SteveUpdateVACtemporary N2 supply lineThe drill room floor will be retiled Thursday,
June 16. Temporary nitrogen line set up will
allow emptying the hole area.
 afterN2work.png 
  12195   Fri Jun 17 15:22:31 2016 gautamUpdateVACN2 supply line restored after retiling


 c0vac_06172016.png 
  12237   Fri Jul 1 09:20:44 2016 SteveUpdateVACvent 78  VENT
OBJECTIVES:

1, Fix ETMX sus "jump issue"
 vent78.pngvent78at250T.png 
  12238   Fri Jul 1 15:48:10 2016 SteveUpdateVACvent 78 at 710 TorrI just disconnected the 6th instrument
grade air cylinder from the vacuum envelope
at 720 Torr. Now it will reach equilibrium
 pd78at710T.png 
  12248   Wed Jul 6 08:34:00 2016 SteveUpdateVACRGA scan at day 639The last RGA scan of this pumpdown 78

Pressure plot of 640 days long
pd 78
 RGAscan639d.pngpd78d640.png 
  12250   Wed Jul 6 10:58:07 2016 SteveUpdateVACvent 78 valve configurationVacuum Status: Chamber Open

All chamber annuloses are vented. 
Vac Monitor screen is not communicating with
 CamberOpen.png 
  12293   Tue Jul 12 18:13:19 2016 KojiUpdateVACN2 bottle replacedGautam, Koji

We replaced the right N2 bottle
as it was empty.
  
  12314   Wed Jul 20 11:39:07 2016 SteveUpdateVACvent 78 day 20RGA background scan




 vent78-d20.png 
  12337   Tue Jul 26 14:24:38 2016 KojiSummaryVACPurge compressed air system at LHOI've visited the purge clean
air system at LHO Yarm mid-station with John
Worden.
 12x 
  12338   Tue Jul 26 16:01:32 2016 SteveSummaryVACPurge compressed air systemThanks for checking this out Koji

The builder in 1996 was Process
System International, Inc ( Westborough,
 cleanAirSupl.pdfmobileHEPA.jpg 
  12339   Tue Jul 26 17:41:59 2016 KojiSummaryVACPurge compressed air systemWe have no number for the CFM without calculation.
We can't assume a random number like
10-15
  
  12483   Mon Sep 12 17:54:24 2016 SteveUpdateVACpumpdown 79 We are pumping down. The annuloses
are below 10 mTorr

The vacuum gauges are not communicating
  
  12487   Tue Sep 13 16:16:28 2016 ChrisOmnistructureVACvacuum interlock bypassed(Steve, Chris)

The pumpdown had stalled because
of some ancient vacuum interlock code that
  
  12488   Tue Sep 13 17:47:04 2016 SteveUpdateVACpumpdown 79 completedP1 IFO pressure is 1 mTorr, valve configuration: vacuum normal,
annulosses are pumped, RGA is off, not pumped.
  
  12492   Wed Sep 14 09:44:09 2016 SteveUpdateVACpumpdown 79 completedThe pumpdown started at
9-12-2016

The IFO is at 5e-5 Torr vacuum
 pd79.pngpd79d2.jpgCCcg.jpg 
  12496   Thu Sep 15 10:36:32 2016 SteveUpdateVACpumpdown 79 day 3IFO pressure 3.7e-5 Torr at new cold cathode
InstruTech - Hornet

New
 vent78for73d.png 
  12525   Fri Sep 30 10:37:57 2016 SteveUpdateVACvacuum VME machines rebooted[ Gautam and Steve ]

c1vac1 and c1vac2 were rebooted
and the gauges are communicating now. V1,
 rebooted.png 
  12530   Tue Oct 4 11:02:31 2016 SteveUpdateVACRGA is out of orderThe last good rga scan at vent 78 
day 38

 lastBGscan.png 
  12537   Fri Oct 7 10:29:57 2016 SteveUpdateVACRGA removedThe RGA is removed for repaire. It's
volume at atmophere and sealed.. P4 reading
of 38 Torr is not correct.
 RGAremoved.png 
  12556   Thu Oct 13 00:23:54 2016 ericqUpdateVACPre-vent prepI have completed the following non-Steve
portions of the pre-vent checklist [wiki-40m.ligo.caltech.edu]


Center all oplevs, transom
  
  12559   Thu Oct 13 16:48:34 2016 SteveUpdateVACvent 79 is completedIFO is at atmosphere. The MC can be locked
in air now.

The doors will be coming off tomorrow
 vent_79.png 
  12574   Thu Oct 20 09:17:08 2016 SteveUpdateVACPumpdown 80 has startedPumping again after 7 days at atmosphere.

BS, ITMY and OMC chambers were
open only.
 readyPd80.pngbeforePd80.pngpd80at1h.png7d_atm.png 
  12575   Thu Oct 20 15:59:52 2016 SteveUpdateVACPumpdown 80 has completedIFO pressure 1.7E-4 Torr on new not logged
cold cathode gauge. P1 <7E-4 Torr

 7hPd80.png8hPd80.png9hPd80.png 
  12577   Fri Oct 21 09:28:21 2016 SteveUpdateVACVac Normal reachedDry pump of TP3 replaced after 9.5 months
of operation.[ 45 mTorr d3 ]

The annulosses are pumped.
 VacNormal.png 
  12589   Mon Oct 31 16:20:50 2016 SteveUpdateVACRGA is reinstalledQuad rods and  ionizer kit: consisting
of repeller cage, anode grid, focus plate
and  filament were replaced....... under
  
  12633   Tue Nov 22 11:31:52 2016 SteveUpdateVACRGA is running againThe Rga was turned on yesterday.




 RGAisBack33d.pngpd80-560Hz-d33.pngafterRepair1d.png 
  12636   Wed Nov 23 11:32:13 2016 SteveUpdateVACTP3 drypump replaced againTP3 drypump replaced at 655 mTorr, no load,
tp3 0.3A 

This seal lasted only for 33 days
  
  12642   Mon Nov 28 09:45:44 2016 SteveUpdateVACRGA scan at pumpdown day 40The vacuum envelope ~1 C warmer today than
7 days ago. Bad peaks are coming down as
normal.
 RGAscan_d40.pngd2_&_d7scan.pngRGAd2.png 
  12681   Thu Dec 22 09:37:20 2016 SteveUpdateVACRGA scan at day 63Valve configuration: vacuum normal

RGA head temp: 43.5 C

Vac envelope temp: 23 C
 pd80-d63.pngpd80-580Hz-d63.png 
  12698   Tue Jan 10 14:24:09 2017 SteveUpdateVACRGA scan at day 82Valve configuration: vacuum normal

Vacuum envelope: 23C

Rga head: 44C
 pd80VNd82.png 
  12774   Tue Jan 31 14:14:29 2017 ranaUpdateVACPressure watch scriptI think this cron job is running on NODUS
(our gateway) instead of our scripts machine:


p.p1 {margin:
  
  12853   Mon Feb 27 15:33:10 2017 SteveUpdateVACRGA scan at day 130Valve configuration: vacuum normal

Vacuum envelope: 23.5 C

RGA head: 46.6 C
 rgascan@130d.png 
  13047   Wed Jun 7 11:32:56 2017 SteveUpdateVACsmooth vac rebootGautam and Steve,

 

The medm monitor & vac control
 vac_reboot.png 
  13075   Tue Jun 20 16:28:23 2017 SteveUpdateVACRGA scan   RGAscan243d.pngRGAscan.png 
  13132   Sun Jul 23 15:00:28 2017 JamieOmnistructureVACstrange sound around X arm vacuum pumpsWhile walking down to the X end to reset
c1iscex I heard what I would call a "rythmic
squnching" sound coming from under the
  
  13134   Mon Jul 24 09:55:29 2017 SteveOmnistructureVACcontroller failerIfo pressure was 5.5 mTorr this Monday
morning. The PSL shutter was still open.
TP2 controller failed. Interlock closed V1,
 TP2controllerFails.png 
  13142   Tue Jul 25 08:48:57 2017 SteveUpdateVACRGA scan at d278The RGA did not shut down at the turbo
pump controller failing.

 RGA278d.png 
  13143   Tue Jul 25 14:04:06 2017 SteveUpdateVACturbo controller installed and we are running at vac normalGautam and Steve,

Spare Varian turbo-V 70 controller,
Model 969-9505, sn 21612 was swapped in.
 TP2@75Krpm.png 
  13171   Tue Aug 8 17:04:26 2017 SteveUpdateVACunintended pump downIFO pressure 2 Torr,    PSL 
shutter closed.  I'm pumping down
with 2 roughing pumps with ion pump gate
 pumping_down.png 
  13172   Tue Aug 8 17:44:11 2017 SteveUpdateVACunintended pump downPumpdown stopped for over night  at
~  1 Torr

The roughing line disconnected. 
 stopped_pumping.png 
  13175   Wed Aug 9 11:59:51 2017 SteveUpdateVACunintended pump down at vacuum normalpd80b has reached Vac Normal. IFO pressure
0.5 mTorr

We need our vauum channels back
 pdc.pngpd80b@vacnormal.png 
  13179   Wed Aug 9 16:34:46 2017 ranaUpdateVACVacuum Document recoveredSteve and I found the previous draft of
the 40m Vacuum Document. Someone in 2015
had browsed into the Docs history and then
  
  13186   Thu Aug 10 15:45:34 2017 SteveUpdateVACaccidental vent to 17 TorrFinally we got the cold cathode gauge working.
IFO pressure 7e-6 Torr-it, vacuum normal
valve configuration with all 4 ion pump gate
 Mag_UPS.jpgUPSbatteryPack.jpgclosing_V1.jpg 
  13233   Mon Aug 21 14:53:32 2017 gautamUpdateVACRGA reset[gautam, steve]

In the aftermath of the accidental
vent, it looks like the RGA was shutdown.
  
  13234   Mon Aug 21 16:35:48 2017 gautamUpdateVACUPS checkup[steve, gautam]

At Rolf/Rich Abbott's request,
we performed a check of the UPS today.
  
ELOG V3.1.3-