4094
|
Thu Dec 23 13:30:09 2010 |
steve | Configuration | VAC | slow pumpdown complete |
The pump down continued this morning by the removal of the butterfly valve. Two roughing pumps were used to reach 500 mTorr
The Maglev monitoring MEDM screen "Rotating" indicator is not working. It is on all times. Please look at Maglev controller monitor for real information.
Pump down is completed.
Configuration: vacuum normal after 86 days at atm CC1 = 1e-5 Torr
IFO is hungry for light (and maybe some goulash with a little paprikash too) |
4133
|
Tue Jan 11 11:39:45 2011 |
steve | Update | VAC | RGA is turned on |
Joe updated the rga procedure in the wiki and we turned on the filament. It will take a few days to reach thermal equilibrium.
TP2 dry fore pump was replaced at 910mTorr |
4233
|
Mon Jan 31 16:12:11 2011 |
steve | Update | VAC | Vertex crane upgrade shorth coming |
The upgrade is almost finished. I found that the passive latch lock is not closing down all the way. It has about a 3/8" gap. See Atm. 1 & 2
The service man was here this morning and agreed to fix it. They will be back next week. The latch needs an other spring to push it into full lock.
We tested all possible sequences of operation of the new upgrade. It performed to specification.
Quote:
|
|
|
4273
|
Fri Feb 11 09:27:03 2011 |
steve | Configuration | VAC | RGA scan |
The RGA scan is normal at day 52 of this pump down.
Light power BS 1064nm ~25mW, ETMX 532nm ~5mW |
4391
|
Wed Mar 9 17:29:11 2011 |
steve | Summary | VAC | single O-ring protection |
We have one single O-ring on the 40m vacuum envelope. It is on the OOC west side, facing the AP table. This O-ring has to be protected from the force of this
door. There should be 3 shims ~120 degrees apart to carry the full load, so it is not the O-ring that is getting squashed.
This morning I found only one of these shims in place. |
4654
|
Fri May 6 15:59:40 2011 |
steve | Update | VAC | TP3 fore pump replaced |
Dry fore pump of TP3 replaced by brand new Varian SH-110 at 1.1 Torr_75,208 hrs
The annuloses were closed off for 25 minutes. We are back to VACUUM NORMAL mode.
The TP3 fore line pressure dropped to 44 mTorr at 25 minutes in operation.......9.4mTorr at day 2 with full annulos load |
5016
|
Fri Jul 22 10:13:41 2011 |
steve | Update | VAC | RGA scan at day 213 |
|
5017
|
Fri Jul 22 10:24:34 2011 |
steve | Update | VAC | pressure plot at day 213 |
Dec 21, 2010 we pumped down the MARK4 rebuilt 40m-IFO and the malev has been pumping on it since than |
5047
|
Wed Jul 27 15:38:01 2011 |
steve | Update | VAC | beam traps for vacuum |
We have cleaned, baked, rga scaned traps for vacuum. Thorlabs LB1 on 1" OD ss posts and forks. The effective surface area is 43 x 18 mm of stacked razors.
Seven pieces are mounted on New Focus #9962 1" OD SS vented- pedestrals to 5.5" center height and 5 pieces to 4.875" |
5080
|
Mon Aug 1 08:52:37 2011 |
steve | Update | VAC | preparation to vent |
Both arms locked easely around 1V transmited. We should recenter oplevs. |
5104
|
Wed Aug 3 09:40:13 2011 |
steve | Update | VAC | vent |
The vacuum system is coming up to atm. The vent was started with slow N2 flow. The PSL output is blocked 2 places on the table. |
5105
|
Wed Aug 3 11:34:59 2011 |
kiwamu | Update | VAC | Re: vent |
An important rule during the in-vac work :
Do not change the incident axis of the X and Y green beams.
Because of the air flows and unusual pressure in the chambers, the DC alignment of the suspensions become less reliable in terms of the beam pointing reference.
The green beams will be considered as references during the vent.
Quote: |
The vacuum system is coming up to atm. The vent was started with slow N2 flow.
|
|
5111
|
Wed Aug 3 16:18:30 2011 |
steve | Update | VAC | vent is almost finished |
P1 at 750 Torr, Vent valve VV1 is left open to atm. It will reach equilibrium in an hour. The PSL power is not turned down yet. The beam path is blocked at two places inside the enclosure.
The low power 20 mW input MC can be locked tonight.
Next day's - Thursday notes:
We reached 760 Torr of atm in 8 hrs at 1.7 Torr/ min with 5 cylinders of instrument grade air.
Used 500 PSI of nitrogen to get to 20 Torr at first. This flow and the first cylinder of N2 has to be slower next time.
We did the following:
1, oplevs were centered on locked caveties 2 days ago
2, just before vent we rechecked arms pointing, they wre still locking
3,eloged strain gages and turned HVs off at PZT-steering at 1Y3 rack and OMC-PZT ps at 1X2 aux rack. They were actually off.
4,,checked jam nuts 6 places x 3
5, turned oplev servos off
6, eloged SUS summery page
7, checked particle counts at ITMY: 1 micron 300, 0.5 micron 3K, 0.3 micron 30K particles / cft-min. All three cranes were wiped 2 days ago.
8, blocked laser into IFO: main 1064 in 1.25W were blocked by manual 2 blocks on PSL table. The PSL output shutter was left open to be triggered by interlock at P1 3 mTorr. It did!
Aux NPRO-AP and green light input at both ends were blocked. |
5142
|
Mon Aug 8 15:52:39 2011 |
steve | Update | VAC | back ground rga scan |
The RGA region is beeing monitored during the vent. This will tell us how clean the RGA itself is.
|
5159
|
Tue Aug 9 16:54:47 2011 |
steve | Update | VAC | scratch on vac door |
Jenne found a big scratch on the north vac door of ITMY. Fortunately it does not reach the inner annulos 0 -ring seal.
This is precisely what we have to avoid to preserve our vacuum system!
|
5180
|
Wed Aug 10 22:47:22 2011 |
rana | Summary | VAC | Vacuum Workstation (linux3) re-activated |
For some reason the workstation at the vac rack was off and unplugged. Nicole and I plugged its power back in to the EX rack.
I turned it on and it booted up fine; its not dead. To get it on to the network I just made the conversion from 131.215 to 192.168 that Joe had done on all the other computers several months ago.
Now it is showing the Vacuum overview screen correctly again and so Steve no longer has to monopolize one of the Martian laptops over there. |
5276
|
Mon Aug 22 11:40:08 2011 |
steve | Update | VAC | cranes checked |
Cranes are checked and they are ready for lifting. At the east end will use the manual Genei-lift to put door on. |
5289
|
Tue Aug 23 16:23:33 2011 |
Jenne | Update | VAC | Access connector in place |
[Steve, Bob, Jamie, Kiwamu, Valera, Jenne]
The access connector is now in place, in preparation for pump-down. Tomorrow (hopefully) we will do all the other doors.
|
5303
|
Thu Aug 25 17:14:49 2011 |
steve | Update | VAC | clean room fashion changes |
Jamie is modeling our next generation in-vac & clean room bonny suit that Jenne and myself already tested.
It is quite bearable with our traditional cleanroom beret-bouffant cap. Please use these in the future.
This will help to avoid the farther degradation of somewhat dusty 40m vac envelope.
It is the required dress code to enter the clean assembly room in the 40m.
We have small, med, large and x-large in stock. I'm getting larger sizes.
It will not allow certain people to climb inside the vacuum chamber in dirty pants. |
5331
|
Thu Sep 1 11:03:22 2011 |
steve | Update | VAC | back ground rga scan |
The RGA back ground at day 29 of this vent. |
5354
|
Wed Sep 7 00:47:51 2011 |
Jenne | Update | VAC | PUMP is a GO! |
Steve and Jamie: After Jamie checks the ITM free swingings, please put on the ITM heavy doors and start the pump! For real this time!!! Yeah! |
5357
|
Wed Sep 7 12:03:49 2011 |
steve | Update | VAC | Pump down has started |
Jamie and Steve
We closed ITMX and ITMY chambers and started pumping around 11am
What we did before:
1, turned off AC power to PZT Jena HV ps
2, checked jam nut positions
3, cheched single o-ring shims
4, closed psl out shutter |
5361
|
Wed Sep 7 18:19:37 2011 |
steve | HowTo | VAC | stop pump down for overnight |
Quote: |
Jamie and Steve
We closed ITMX and ITMY chambers and started pumping around 11am
What we did before:
1, turned off AC power to PZT Jena HV ps
2, checked jam nut positions
3, cheched single o-ring shims
4, closed psl out shutter
|
We are at 30 Torr of 7 hours of pumping with 2 roughing pumps.
Kiwamu will take over the rest of the roughing today. He will keep an eye on the pumping speed to be ~1-2 Torr/min and open up the manual RV1 valve if needed.
The present status is #3023 of "chamber open to vacuum open" mode and waiting the P1 pressure to drop to 500 mTorr
He will do the following to stop pumping at P1 = 500 mTorr
1, close V3
2, close RV1 with torque wheel
3, turn off PR1 & 3
4, disconnect metal hose between RV1 and PR3
I will start the Maglev tomorrow morning. |
5363
|
Wed Sep 7 21:45:16 2011 |
kiwamu | Update | VAC | pump stopped. Pressure is at 450 mtorr |
I stopped puming at 9:30 PM and the pressure in P1 is at 450 mtorr.
I followed exactly he procedure that Steve noted on his elog entry.
Here is a plot of the histroy of our pumping today.

Quote from #5361 |
1, close V3
2, close RV1 with torque wheel
3, turn off PR1 & 3
4, disconnect metal hose between RV1 and PR3
I will start the Maglev tomorrow morning.
|
|
5365
|
Thu Sep 8 10:50:44 2011 |
steve | Update | VAC | pumpdown #71 comleted |
Vacuum status: " vacuum normal" CC1 pressure 5e-5 Torr
Slow roughing through butterfly valve took 11 hours at 1-2 Torr/min speed. We had a leak at the metal hose connecting o-ring that became visible at 200 Torr.
The vacuum envelope pressure rose to 500 mTorr from 450 mTorr This is 50 mTorr leak plus outgassing over 11 hrs over night stop = 5 mTorr / hr
Atm2, Maglev pumpdown details. P2 and P3 are in the foreline of the Maglev. The pressure peaks at 4 Torr beacause the 3 drypumps have little pumpimg speed at this range.
External fan is turned on during this one hour period to prevent Maglev turbo from overheating.
Same things are happenning with the two small TP2 and TP3 pumps under load. Their foreline pressure peak at 1 Torr. They slow down to 45 K RPM from 50K RPM and warm up to 36-39 C
Precondition: 36 days at atm |
5497
|
Wed Sep 21 11:35:07 2011 |
steve | Update | VAC | RGA scan |
RGA scan with maglev pumping speed at day 14 of the pump down.
The larger inserted box contains the tuning parameters of the SRS 200 amu RGA |
5529
|
Fri Sep 23 16:25:01 2011 |
steve | Update | VAC | vac rack UPS battery replaced |
APC Smart -UPS 2200 model: SUA2200RM2U batteries were replaced by compatible RBC43, 8x 12V5A |
5590
|
Fri Sep 30 18:35:42 2011 |
steve, kiwamu | Update | VAC | vacuum set for poweroutage |
We did the following:
1, closed V1, VM1, annuloses: VASE, VASV, VABS, VAEV, VAEE and VA6
2, stop rotation of Maglev-TP1, waited to decellerate and turned off power to it
3, closed V4, stoped rotation of TP2, waited to decellerate and turned power off
4, opened VM3 to RGA that is still running
I will come in tomorrow 9-10am to restart pumping. |
5599
|
Mon Oct 3 08:38:21 2011 |
steve | Summary | VAC | Recovery from the power shutdown is completed |
I failed to start Rana's favorit anciant desktop computer at the vac rack. He has to baby this old beast just a little bit more.
Vacuum status: Vac Normal was reached through Farfalla: Rga was switched back to IFO and and Annuloses are beeing pumped now.
V1 was closed for about a day and the pressure reached ~2.8 mTorr in the IFO. This leakrate plus outgassing is normal
The ref cavity 5000V was turned on.
The only thing that has to be done is to restart the RGA. I forgat to turn it off on Friday.
|
5662
|
Thu Oct 13 21:40:59 2011 |
rana | Summary | VAC | Recovery from the power shutdown is completed |
As it turns out Steve is not crazy in this particular instance: the vacuum computer, linux3 , has some issues. I can login just fine, but trying to open a terminal makes the CPU rail and the RAM max out and eventually the machine freezes.
Under KDE, I can open a terminal OK as root, but if I then try a 'su controls', the same issue happens. Let's wait for Jamie to fix this. |
5759
|
Fri Oct 28 18:33:59 2011 |
steve | Update | VAC | leaking nitrogen line fixed |
I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply line to atm. Fixed leak.
This was done fast so the pumps did not have to be shut down. Pressurized supply line and open valves to
"Vac Normal" condition in the right sequence. |
5767
|
Mon Oct 31 08:55:19 2011 |
steve | Update | VAC | pressure plot at day 53 |
Quote: |
I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply line to atm. Fixed leak.
This was done fast so the pumps did not have to be shut down. Pressurized supply line and open valves to
"Vac Normal" condition in the right sequence.
|
|
5887
|
Mon Nov 14 15:46:14 2011 |
steve | Update | VAC | TP2's forepump changed |
The foreline pressure of TP2 was 1.4 Torr this morning. This drypump worked well for ten months.
Recently rebuilt drypump with new seal was swapped in.
This is how you do it: close V1, V4 and turn off TP2. Replace drypump and start up TP2
Set pump speed to 50 K rpm and open V4 to TP1 Note that the Maglev was not turned off because V4 was closed off only 5-10 minutes.
Open V1 the status is Vac Normal.
TP2 is rotating at 50K rpm, current pick up 0.2A, the temp is 26C and its foreline pressure 33 mTorr |
5950
|
Fri Nov 18 16:37:14 2011 |
steve | Update | VAC | preparing for ac power interruption |
The vacuum is ready for no AC power for 1 hr on Sunday morning at 10am
I did the follwing:
Closed V1, stopped the rotation of TP-1 maglev, waited till it reached 0 Hz_ rpm and turned it's controller off.
Closed V4 and stopped TP-2 rotating
Closed all annuloses and VA6
Closed VM1 and opened VM3 This means the RGA is being pumped by TP3. RGA is running in background mode. V5 will close instantly as the AC will be turned off.
VAC STATUS: IFO envelope and annulosses are not pumped. P1 pressure will reach 5-6 mTorr by Sunday morning.
The PSL output shutter will be closed by the interlock at 3 mTorr
Kiwamu will turn off Piezo Jena PZT power supplies and computers Saturday.
I will be here around 1pm Sunday to star pumping. I will need EPICs MEDM running by than. |
5962
|
Sun Nov 20 13:51:54 2011 |
steve | Update | VAC | vacuum is back up after ac interruption |
State condition: Vac Normal, CC1 ~8e-6 Torr
The IFO pressure peaked at 8.3 mTorr after 2days of not pumping. |
6790
|
Fri Jun 8 15:24:08 2012 |
steve | Update | VAC | RGA scan at day 276 and pressure plots |
Quote: |
We tried not to open chambers above 10,000 particles of 0.5 micron cf/min
New items going in: 2 rasor beam traps, 5 badly oxidized old silver plated setscrew with spring loaded tips......to be replaced in the future, viton tips for eq screws....some are lose, gold plated allen wrench installed at ITMX bottom, reglued magnet on ITMX
Bad hardware things found: nylon ball "locking elements" on OSEM locking set screws with screwdriver slot, lose 1064 nm filter on OSEM pd
|
40m - pumpdown 71- maglev pumping speed - at day 276........all normal |
6894
|
Fri Jun 29 11:02:00 2012 |
steve | Update | VAC | the vent is at 500 torr |
Steve, Yuta and Jamie
Jam nuts were checked and oplev servos were turned off. Sus summery is below with strain gauge values. Are the strain gauge values have any meaning when the PZT contorrels are off?????????????????? |
6895
|
Fri Jun 29 13:11:31 2012 |
steve | Update | VAC | 40m IFO at atm |
The 4 hrs vent plot at 3 torr/min rate.
Nitrogen was used from 1e-6 torr to 35 torr at intake pressure 14 PSI
The rest was filled with 5 cylinders of Instrument Grade Air at intake pressure 14 PSI
We can start opening chamber at 3 pm today
|
6897
|
Fri Jun 29 22:56:35 2012 |
Jamie | Update | VAC | input telescope beam clipping on Faraday |
[Yuta, Koji, Jamie]
We went into ITMX chamber to inspect the situation there. We looked for clipping and flipping at PR2, and found none, although we noticed that the beam at PR2 looks a little clipped.
We then went back into the BS chamber and took a closer look at the beam incident on PRM, and the situation with PR3. The PRM incident beam looked a little clipped, which we expected from the PR2 observation. But the beam looks well centered on PRM and PR3. As best I could tell the beam is reflecting off the front surface of PR3, as expected.
Looking at the beam around MMT1 and PJ2 (the second PZT on BS), we could tell that the beam incident and reflected off of MMT1 looked round, where as the beam incident on PJ2 looked clipped. Using my tallness super power I was able to reach into the IMC chamber and confirm that the beam going from MMT1 to MMT2 clips fairly badly on the edge of the Faraday. Koji speculates that this is the result of a misalignment of the PSL output beam into the MC. In any event, it's not clear how this would be the cause of our PRC woes.
We decided to close up for the night, and let Yuta work on aligning PRMI. We need to figure out what the heck to do now.
We've been watching the input power reduce, from 18 mW initially when we first went in, to about 5mW now. It seems to be leveling out now. It's unclear what would have been causing it. Drift of the input polarization? |
6906
|
Tue Jul 3 17:23:50 2012 |
steve | Update | VAC | pumpdown completed |
Vacuum Normal State is reached in 9 hours. CC1 = 2e-5 Torr
Aux dry pump #3 is still running. The RGA is not pumped yet. |
6929
|
Fri Jul 6 09:27:40 2012 |
steve | Update | VAC | 4 days at atm |
I'm looking for some movement indicators of the vent-pump down events.
|
6930
|
Fri Jul 6 09:52:35 2012 |
steve | Update | VAC | pump down hick up |
I can not understand what really happened here with CC1 gauge or there was really a pressure glitch.
attachment 1, pump down day 3 with 4th of July fireworks in the lab
attachment 2, before and after vent in 9 days
|
6970
|
Thu Jul 12 16:27:04 2012 |
steve | Update | VAC | drypump changed |
TP2 dry_pump was changed at intake pressure 982 mTorr at 84,889 hrs This seal hold up for one year.
The rebuilt pump seal performing well at 28 mTorr |
7044
|
Fri Jul 27 14:28:36 2012 |
steve | Update | VAC | cold cathode gauges |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
7051
|
Mon Jul 30 15:49:16 2012 |
steve | Update | VAC | cc1 switched |
Quote: |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
We have two CC1 gauges at the pump spool. One is in vertical position and the spare is in horizontal. Today I switched the cable from vertical to horizontal CC1
This one is reading higher pressure. It is an old dirty gauge. It may trigger the RGA protection when it's reading goes above 1e-5 torr
The real pressure is 2e-6 torr |
7056
|
Tue Jul 31 08:01:22 2012 |
steve | Update | VAC | cc1 switched |
Quote: |
Quote: |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
We have two CC1 gauges at the pump spool. One is in vertical position and the spare is in horizontal. Today I switched the cable from vertical to horizontal CC1
This one is reading higher pressure. It is an old dirty gauge. It may trigger the RGA protection when it's reading goes above 1e-5 torr
The real pressure is 2e-6 torr
|
cc1h spikes closed VM1 last night. VM1 is opened. |
7089
|
Mon Aug 6 10:53:32 2012 |
steve | Update | VAC | status: vauum normal |
The power outage did not have any effect on the vacuum system. I had to open VM1 to the RGA because of flaky CC1 cold cathode gauge fluctuations.
We are running on the vertically positioned CC1 again.
Note: rga scans with closed VM1 are back ground scans. |
7272
|
Fri Aug 24 16:03:39 2012 |
Steve | Update | VAC | Vacuum related work at atm |
Vacuum related work at atmosphere:
Atm1, Check all chamber dog clamps tightness with torque wrench,
Atm2, Replace old, black molibdenum disulfite bolts -nut with new silicon bronze nuts and clean SS bolts.
Atm3, Replace CC1 cold cathode gauges: horizontal and vertical. |
7278
|
Sun Aug 26 20:58:21 2012 |
Jenne | Update | VAC | Don't vent!!!! |
[Koji, Jenne]
Steve, do not vent tomorrow morning! We are still not prepared, and will not finish the preparation tonight. Hopefully we can finish the prep tomorrow, and then vent Tues.
Things we need to do before the vent:
MC spots centered [Jenne, tonight]
Use PZT2, BS to hit ~center of ETMs.
Realign arms, measure spot positions.
Make sure BS, ITMs are good - we want a good AS spot since we'll likely have to adjust some AS optics while we're inside
Insert attenuation optics, recover MC trans by rotating PBS cube to translate beam slightly |
7293
|
Tue Aug 28 09:37:33 2012 |
Steve | Update | VAC | RGA scan at day 56 |
RGA scan, Maglev pumping speed at day 56
CC1 is dying. CC4 is real.
|