  9681   Thu Feb 27 13:11:13 2014 steveUpdatesafetysafety audit correction

Quote:

 

 We had our annual safety inspection today.  Our SOPs are outdated. The full list of needed correction will be posted tomorrow.

 

The most useful found was that the ITMX-ISCT ac power is coming  from 1Y1 rack. This should actually go to 1Y2 LSC rack ?

 Please test this so we do not create more ground loops.

 Linus-1, Nodus and others  ac cords can be moved over to new blank yellow extension cord with multiple recepticals.

 Remove two red extension cords going to Smart UPS

  9699   Thu Mar 6 11:43:17 2014 steveUpdateGeneralGuralp control unit

CMG-40T handheld controller unit is missing its power supply. In order to zero the instrument one has to apply plus and minus DC voltage.

The wiring on this 10 pin Amphenol PT02E-12-10P is shown.

  9704   Fri Mar 7 16:56:17 2014 steveUpdateIOOIOO qpds centered

Quote:

Quote:

The IMC has not been behaving well since this morning and totally not happy when Q was finishing his measurements. The WFS servo had large offsets in pitch. Looking back at the trend and using ezcaservo to restore the suspensions did not help.

I realigned the IMC and brought TRANS SUM to ~18000 and MCREFL to < 0.5. The spot positions are not very good; nearly 2 mm off in pitch on MC1 and MC3. But after the alignment of MC, the WFS servo offsets were below +/-20.

The MC has been locked stably with WFS servo ON for the last few hours.

P.S. I did not touch the WFS pointing or reset the WFS offsets.

MC remained locked with WFS enabled all through last night and this morning. Koji dropped by and looked at the MC. The MC WFS servo, though stable, was at the edge of becoming unstable. This was because I did not touch the WFS pointing on the QPDs yesterday after realigning. So I recentered the WFS, reset the WFS filterbank offsets and reenabled the servo.

I measured the spot positions on MC mirrors for reference.

Spot positions in mm (MC1,2,3 pit MC1,2,3 yaw): [1.405767579680834, 0.79369009503571208, 1.3220430681427462, -1.2937873599406551, -1.1704264340968924, -1.2518046122798692]

 

  9705   Mon Mar 10 09:28:48 2014 steveUpdateIOOIOO pointing 2 days

 Morning seconds without adjustment.

 

  9725   Thu Mar 13 16:05:48 2014 steveUpdatesafetysafety audit 2014

Quote:

 

 We had our annual safety inspection today.  Our SOPs are outdated. The full list of needed correction will be posted tomorrow.

 

The most useful found was that the ITMX-ISCT ac power is coming  from 1Y1 rack. This should actually go to 1Y2 LSC rack ?

 Please test this so we do not create more ground loops.

 Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014

 

The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1

  9730   Mon Mar 17 10:50:58 2014 steveUpdatesafety2014 annual crane certification

Quote:

Quote:

 

 We had our annual safety inspection today.  Our SOPs are outdated. The full list of needed correction will be posted tomorrow.

 

The most useful found was that the ITMX-ISCT ac power is coming  from 1Y1 rack. This should actually go to 1Y2 LSC rack ?

 Please test this so we do not create more ground loops.

 Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014

 

The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1

 KroneCrane Fred inspected and certified the 3 40m cranes for 2014. The vertex crane crane was load tested at fully extended position.

  9743   Fri Mar 21 14:59:44 2014 steveUpdatePEMcontroling dust

Please take a look at the table top with the flashlight before removing it. If it is dusty, wipe it down with dry lint free cloth in the box.

There is one box with flash light and wiper at AP, ETMY & ETMX  optical tables.

  9748   Mon Mar 24 22:13:37 2014 steveUpdateGeneralPower Failure

Quote:

I'm checking the status from home.

P1 is 8e-4 torr

nodus did not feel the power outage (is it APS supported?)

linux1 booted automatically

c1ioo booted automatically.

c1sus, c1lsc, c1iscex, c1iscey need manual power button push.

 9:11pm closed PSL shutter, turned Innolight 2W laser on,

         turned 3 IFO air cond on,

        CC1 5.1e-5 torr, V1 is closed, Maglev has failed, valve configuration is " Vacuum Normal "  with V1 & VM1 closed, RGA not running,   c1vac1 and c1vac2   were saved by UPS,

        (Maglev is not connected to the UPS because it is running on 220V)

        reset & started Maglev.........I can not open V1 without the 40mars running...........

        Rossa is the only computer running in the control room,

        Nodus and Linux1 was saved by UPS,

        turned on IR lasers at the ends, green shutters are closed

It is safe to leave the lab as is.

     

  9749   Tue Mar 25 14:52:57 2014 steveUpdateVACvacuum is recovered

 Out gassing plus leak rate   0.15  mTorr / hour

 The pressure rose to 2.5 mTorr in 17 hours

 V1 was opened at 1:56pm

 VM2 opened at 2:10 so the RGA region is back to 1e-5 torr

 

  9757   Fri Mar 28 16:26:20 2014 steveUpdateVACRGA scan after power failure

Quote:

 Out gassing plus leak rate   0.15  mTorr / hour

 The pressure rose to 2.5 mTorr in 17 hours

 V1 was opened at 1:56pm

 VM2 opened at 2:10 so the RGA region is back to 1e-5 torr

 

 

  9802   Fri Apr 11 14:57:53 2014 steveUpdateLSCcongratulation

 

 

  9870   Mon Apr 28 17:27:29 2014 steveUpdatesafetysafety audit 2014

Quote:

Quote:

 

 We had our annual safety inspection today.  Our SOPs are outdated. The full list of needed correction will be posted tomorrow.

 

The most useful found was that the ITMX-ISCT ac power is coming  from 1Y1 rack. This should actually go to 1Y2 LSC rack ?

 Please test this so we do not create more ground loops.

 Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014

 

The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1

 Last long extension cord removed from 1Y1 to ITMX-ISCT

The AC power strip at ITMX-ISCT is coming from wall L#26

  9873   Tue Apr 29 00:11:03 2014 steveUpdatesafetysafety audit 2014

Be aware that this may affect POP QPD and POP RF Thorlabs PD

Quote:

 Last long extension cord removed from 1Y1 to ITMX-ISCT

The AC power strip at ITMX-ISCT is coming from wall L#26

 

  9895   Thu May 1 17:14:36 2014 steveUpdatePSLthin window AR measured

CVI broadband AR coating was measured at the PSL-enclosure table around 9-10am today. The 2W Innolight first PBS  S polarization beam was used with an other 1/2 wave plate and PBS.

W2-PW1-1004-C-633-1064-0   This 0.045" thick window has 0.7- 0.8 % reflected beam on each sides at 5 degrees of incidence, P polarization.

The specification is  R avg <0.5 % per surface at 0 degree

Rana wants The device would be useless with such a high R, but R 0.1% is OK so I will get V coating.

  9900   Fri May 2 08:15:54 2014 steveUpdatesafetysafety audit 2014

 

 Late adition: CHECK all viewport covers.

A, transparent Lexan sheet is protecting glass windows in a horizontal position

B, metal housing protection is required on each viewport except signal ports

C, signal ports should be shielded by optical table enclosure

 

We have to cover this window-camera with implosion proof cover or just remove it and blank it.

Question number 2: Do our vertically positioned windows with flip able covers require protective lexan ? NO 5-5-2014

  9902   Fri May 2 10:38:29 2014 steveUpdatePSLthin window AR measured

Quote:

CVI broadband AR coating was measured at the PSL-enclosure table around 9-10am today. The 2W Innolight first PBS  S polarization beam was used with an other 1/2 wave plate and PBS.

W2-PW1-1004-C-633-1064-0   This 0.045" thick window has 0.7- 0.8 % reflected beam on each sides at 5 degrees of incidence, P polarization.

The specification is  R avg <0.5 % per surface at 0 degree

Rana wants The device would be useless with such a high R, but R 0.1% is OK so I will get V coating.

 CVI V-AR coating at 1064 nm, 0 degree,  catalog item is R< 0.25% on each sides,

 R <0.1 % is custom at much higher prices.

This custom order should go with other  orders that has similar need.

From CVI: 5-6-2014

I checked the trace info on the W2-PW1-1004-C-633-1064-0, BBAR coated window that you received.  It is side 1, 0.42%R & side 2, 0.53%R @ 1064nm.  And with the shift, I’m not too surprised you ended up with 0.7%.  A V coat would start with <0.25% (and more typically coming in at ~0.1%) per surface.  As far as stock options, I have a 1”dia x 4mmT, fused silica window that is recorded as side 1, R=0.09 and Side 2, R=0.08% @ 1064.  Is this too think or will it work for you?

 

 

  9914   Tue May 6 09:46:50 2014 steveUpdatePEMcleaning day

 Keven and Steve,

We cleaned around the Vertex chambers, PSL and MC2 floor areas.

 

  9915   Tue May 6 10:22:28 2014 steveUpdateCDSc1ioo dolphin fiber

Quote:

Steve and I nicely routed the dolphin fiber from c1ioo in the 1X2 rack to the dolphin switch in the 1X4 rack.  I shutdown c1ioo before removing the fiber, but still all the dolphin connected models crashed.  After the fiber was run, I brought back c1ioo and restarted all wedged models.  Everything is green again:

green.png

 I put label  at the dolphin fiber end at 1X2 today.   After this I had to reset it, but it failed.

  9918   Tue May 6 18:32:14 2014 steveUpdateLSCTRY 60Hz noise hunt

This is an effort to get rid of our ground loops  by isolating the electronic components from the optical table.

Aluminum mounting base plates of Thorlabs BA2 and Newport B-2 were replaced by plates or post made out of delrin material.

This is an insulator. DELRIN base plates were installed 6 places. The oplev-qpd has Nylon base plate.

The NPRO and HE/NE lasers are not isolated from the table. S8 and S9

I'm not sure about the doubling oven S10 

The optical table is grounded at G11  through  ~1 Mohms to the ETMY chamber.

Alignment touch up needed   at all D-marked component!

 

  9921   Wed May 7 14:01:36 2014 steveUpdateLSCTRY 60Hz noise hunt

Quote:

This is an effort to get rid of our ground loops  by isolating the electronic components from the optical table.

Aluminum mounting base plates of Thorlabs BA2 and Newport B-2 were replaced by plates or post made out of delrin material.

This is an insulator. DELRIN base plates were installed 6 places. The oplev-qpd has Nylon base plate.

The NPRO and HE/NE lasers are not isolated from the table. S8 and S9

I'm not sure about the doubling oven S10 

The optical table is grounded at G11  through  ~1 Mohms to the ETMY chamber.

Alignment touch up needed   at all D-marked component!

 

 Attachment appendix:

 

D: component delrin isolated

N: component nylon isolated ( or Delrin )

S: component shell is shorting to optical table (except oven)

G:  optical table ground

 

I failed to maximize TRY the pds.

  9933   Thu May 8 17:25:17 2014 steveUpdateLSCTRY 60Hz noise hunt

 I worked at the ETMY-ISCT this morning and late afternoon.  I will continue the 60 Hz noise hunt tomorrow. 

  9937   Fri May 9 11:23:11 2014 steveUpdateGreen Lockingdecreased X green light power

Green light power decreased from 3 mW to 1 mW at the ETMX-ISCT shutter. More later.

  9941   Mon May 12 14:42:25 2014 steveUpdateendtable upgradeoptical table enclosure wall proposal and table at ETMY

Quote:

 Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of  0.007" thermashield  and  0.125" yellow acrylic

Visibility: 70 %,    Transmission of 1064 nm  2-3 % at 0-50 degrees incident,   power density  ~ 0.7 W/mm2

Max power 100 mW

        

More details about this east end  " acrylic + "   enclosure ( optical table cover ) can be found elog entry 6210, 7194 and  7106

 

Window tinted layer transmission plot is below.

 

We have a film which may meet your requirements and the values are shown below:

         

               Wavelength (nm)              Transmission                     Reflectance(front)            Reflectance (back)

 

                        1060                               .0772                               .604                                     .759

 

                        1070                               .0723                               .615                                     .772

 

These values are taken from the LBNL Optics 6 program and if you have access to that program, the NFRC ID for the film is 202.   If you do not have access to the program, I have a captured the graph which may be of some help.  I apologize for the appearance of the graph but someone at LBNL decided it would look better with a dark gray background – the yellow is the transmission curve, the blue is the reflectance (front) and the green is the reflectance (back).

 

 

The film is referred to as “Hilite 70” and has a 72% visible light transmission.  These results were obtained with the film mounted on 1/8” clear glass.

 

I

 

 

 

 

 

Saint-Gobain Performance Plastics

www.solargard.com

 

Please consider your environmental responsibility before printing this email.

 

 

 

  9965   Fri May 16 16:08:12 2014 steveUpdateLSCIsolating base plates

 Electronic components should be ISOLATED as they are installed on the optical tables.

This is essential to avoid ground loops, 60 Hz and harmonic peaks in the spectrum. We have just got some made.

Please only use it for this reason. Earlier black delrin base plates were used up in not needed places.

 

The anodized Aluminum base plates with magenets certainly will conduct.

 

  10007   Mon Jun 9 09:41:06 2014 steveUpdatesafetysafety training

2014 surf students Nichin and Akhil received 40m specific basic safety training last week.

  10069   Thu Jun 19 10:39:22 2014 steveUpdatesafetysurf safety training

 

 Andres Medina and Andrew "Harry" Hall received 40m specific safety training. They did general safety already and their laser safety training will be this after noon.

  10071   Thu Jun 19 14:12:45 2014 steveUpdatesafetyoptical table scans

 

 PSL, AP, ETMY and ETMX optical tables were scanned for stay beam.

  10075   Thu Jun 19 17:11:52 2014 steveUpdatePEMit is warmer today

 The PSL HEPA was running at 30VAC-variac. It is 1 degree C warmer than usual. The HEPA fan motor turned up to 60 V

  10081   Fri Jun 20 14:42:57 2014 steveUpdateSUSvac illuminators turned off
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework
  10350   Fri Aug 8 11:22:35 2014 steveSummarySUSoplev laser summary

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

  10362   Mon Aug 11 10:23:39 2014 steveSummarySUSoplev laser summary updated

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

  10518   Thu Sep 18 10:08:07 2014 steveSummarySUSoplev laser summary updated

 

Quote:

 

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

     

  10523   Mon Sep 22 10:18:58 2014 steveUpdatePEMlab temperatures

 

 

  10560   Thu Oct 2 14:36:52 2014 steveUpdatePEMoil drops on vertex crane

Quote:

 

 KroneCrane Fred inspected and certified the 3 40m cranes for 2014. The vertex crane crane was load tested at fully extended position.

 Small oil drops were found during prevent inspection of the vertex crane. They were wiped off. It took 231 days to grow this size.

  10665   Tue Nov 4 10:40:46 2014 steveUpdatePEMlab temperatures and particle counts

 

 

  10761   Mon Dec 8 09:03:49 2014 steveUpdatePEMair cond maintenance tomorrow morning

 

 AC maintenance is scheduled from 8am till 11am tomorrow morning.

  10773   Wed Dec 10 14:26:13 2014 steveUpdatePEMair cond maintenance and particle plot

Quote:

 

 AC maintenance is scheduled from 8am till 11am tomorrow morning.

 IFO air condition maintenance will continue tomorrow morning and it should be finished by 11:30AM

 We have new guys taking over this job: Sal and Chris so it takes longer. The units will be shut down for a bit.

They will not enter the IFO lab. The CES housed units will be worked on.

  11083   Fri Feb 27 10:25:24 2015 steveUpdateCamerasquad picture problem

MUX input 7 to ITMXF camera cable was replaced by temporary cable labeled as 888

The problem remains to be the same black stripe at the bottom of the image The single picture is OK.

  11148   Thu Mar 19 17:11:32 2015 steveSummarySUSoplev laser summary updated

           March  19, 2015   2  new  JDSU 1103P, sn P919645 & P919639 received from Thailand through Edmond Optics. Mfg date 12/2014............as spares

  11178   Fri Mar 27 10:38:40 2015 steveUpdateVACvac rack UPS battery replaced

Batteries replaced after 3.5 years with Amstron AP-1250F2,  8x 12V 6Ah

Quote:

APC Smart -UPS 2200   model: SUA2200RM2U   batteries were replaced by compatible RBC43, 8x  12V5A

 

  11227   Mon Apr 20 16:42:48 2015 steveUpdateSUSPRM and BS oplev laser replaced

The laser below is dead. JDSU 1103P, SN P845655 lived for 3.5 years.

Quote:

 

JDSU 1103P died after 4 years of service. It was replaced with new identical head of 2.9 mW output. The power supply was also changed.

The return spots of 0.04 mW  2.5 mm diameter on qpds are BS  3,700 counts and PRM 4,250 counts.

 

It was replaced by JDSU P/N 22037130,( It has a new name for 1103P Uniphase ) sn P919639 of mfg date 12-2014

Beam shape at 5 m nicely round. Output power 2.8 mW of 633 nm

BS spot size on qpd ~1 mm &  60 micro W

PRM spot size on qpd ~1 mm & 50 micro W

  11792   Fri Nov 20 09:45:39 2015 steveSummarySUSoplev laser summary

 

Quote:

 

Quote:

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

 

  12014   Tue Mar 1 09:37:15 2016 steveUpdateVACvac rack UPS batteries replaced

Amstron batteries replaced after 11 months with SP-12-5.5HR,  2 years warranty from replaceUPSbattery.com

Quote:

Batteries replaced after 3.5 years with Amstron AP-1250F2,  8x 12V 6Ah

Quote:

APC Smart -UPS 2200   model: SUA2200RM2U   batteries were replaced by compatible RBC43, 8x  12V5A

 

Note: the replace battery LED did not go out ( well pasted 24 hrs ) till the self test bottom was hold down for 2-3 sec

  12054   Wed Mar 30 11:35:24 2016 steveUpdatesafetyBS visitor's viewport is protected with lexan

Quote:
The four horizontal viewports of arms are protected
by 3/8" thick, 8.5" OD Lexan disk of MR10 Polycarbonate.

ITMX, ETMX, ITMY and ETMY ccd cameras are not focused now.


BS visitor's viewport glass is now covered with Lexan MR10

Note:
this Lexan cover is in vertical orientation so becomes lose when the black anodized cover is removed.
It needs to be held in place

while it's housing is taken off.
  12125   Mon May 23 10:55:49 2016 steveSummarySUSITMX oplev laser replaced

 

      May 23, 2016             ITMX dead He/Ne laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output  2.6 mW, nicely round beam quality at 15 meters.

                                                                                                                                                    Power just before viewport 1 mW,  returning light on qpd 154 microW =  7,500 counts

 

  12126   Mon May 23 15:51:32 2016 steveSummarySUSoplev laser summary updated

 

Quote:

 

Quote:

 

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

     

           May 23, 2016             ITMX dead laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output output  2.6 mW, nicely round beam quality at 15 meters.

  12341   Wed Jul 27 11:40:48 2016 steveSummarySUSoplev laser summary updated

 

Quote:

 

Quote:

 

Quote:

 

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

     

           May 23, 2016             ITMX dead laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output output  2.6 mW, nicely round beam quality at 15 meters.

               July 27, 2016             2  new 1103P from Edmonds in: P947034 & P947039, manf. date April 2016,

  12498   Fri Sep 16 14:15:28 2016 steveUpdatePEMpartical counts

South end flow bench and both clean room assembly flow benches measured zero counts for 0.3 and 0.5 micron size particales.

The counting efficiency of 0.5 micron is 100%

 

  location

 

 

        0.3 micron particles / cf min

 

 

      0.5 micron particles / cf min

 

 

 counter

 MET

 ONE

 

       effect
 ITMY table  35,000  3,000   #3  
 ETMY table  35,000  3,000   #3  
 ITMX table  24,000  2,400   #3  PSL HEPA at 50V
 ITMX wall mounted  -  2,500   #1  
 ETMX work bench    5,000     600   #3   flow bench on  

 

The PSL HEPA performance was measured at the center of the table with MET ONE #3

 Voltage Variac particles /cf min   particles /cf min
 particle size  0.3 micron  0.5 micron
 60  0  0
 50  10  0
 40  1,400  110
 20  1,400  100
  12553   Wed Oct 12 15:01:22 2016 steveUpdateSUSSOS ITM baffles plates are ready

The two 40 mm apeture baffles at the ends were replaced by 50 mm one. ITM baffles with 50 mm apeture are baked ready for installation.

Quote:

 Green welding glass 7" x 9"   shade #14 with 40 mm hole and mounting fixtures are ready to reduce scatter light on SOS

PEEK 450CA shims and U-shaped clips  will keep these plates damped.

 

 

ELOG V3.1.3-