40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 335 of 357  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  16328   Tue Sep 14 17:14:46 2021 KojiUpdateSUSSOS Tower HardwareYup this is OK. No problem.

 
  
  16330   Tue Sep 14 17:22:21 2021 AnchalUpdateCDSAdded temp sensor channels to DAQ list[Tega, Paco, Anchal]

We attempted to reboot fb1 daqd
today to get the new temperature sensor channels
  
  16332   Wed Sep 15 11:27:50 2021 YehonathanUpdateCDSc1auxey assembly{Yehonathan, Paco}

We turned off the ETMX watchdogs
and OpLevs. We went to the X end and shut
 c1auxex_Grounding_OSEM_comparison1.pdfc1auxex_Grounding_OSEM_comparison2.pdf 
  16333   Wed Sep 15 23:38:32 2021 KojiUpdateALSALS ASX PZT HV was off -> restoredIt was known that the Y end ALS PZTs are
not working. But Anchal reported in the meeting
that the X end PZTs are not working too.
 P_20210915_151333.jpg 
  16335   Thu Sep 16 00:00:20 2021 KojiUpdateGeneralRIO Planex 1064 Lasers in the south cabinetRIO Planex 1064 Lasers in the south cabinet

Property Number C30684/C30685/C30686/C30687
 P_20210915_232426.jpg 
  16336   Thu Sep 16 01:16:48 2021 KojiUpdateGeneralFrozen 2It happened again. Defrosting required.  P_20210916_003406_1.jpg 
  16337   Thu Sep 16 10:07:25 2021 AnchalUpdateGeneralMelting 2Put outside.




 PXL_20210916_170602832.jpg 
  16338   Thu Sep 16 12:06:17 2021 TegaUpdateComputer Scripts / ProgramsTemperature sensors added to the summary pagesWe can now view the minute trend of the
temperature sensors under the PEM tab
of the summary pages. See attachment 1 for
 TempPlot_2021-09-16_12.04.19PM.png 
  16340   Thu Sep 16 20:18:13 2021 AnchalUpdateGeneralResetFridge brought back inside.




 PXL_20210917_031633702.jpg 
  16341   Fri Sep 17 00:56:49 2021 KojiUpdateGeneralAwesomeThe
Incredible Melting Man!

 
  
  16342   Fri Sep 17 20:22:55 2021 KojiUpdateSUSEQ M4.3 Long beachEQ  M4.3 @longbeach
2021-09-18 02:58:34 (UTC) / 07:58:34
(PDT)
  
  16344   Mon Sep 20 14:11:40 2021 KojiUpdateBHDEnd DAC Adapter Unit D2100647I've uploaded the schematic and PCB
PDF for End DAC Adapter Unit D2100647.

Please review the design.
 D2100647_End_DAC_Adapter.pdf 
  16346   Mon Sep 20 15:23:08 2021 YehonathanUpdateComputersWifi internet fixedOver the weekend and today, the wifi was
acting bad with frequent disconnections and
no internet access. I tried to log into the
  
  16349   Mon Sep 20 20:43:38 2021 TegaUpdateElectronicsSat Amp modificationsRunning update of Sat Amp modification
work, which involves the following procedure (x8)
per unit:
 IMG_20210920_203456226.jpg 
  16350   Mon Sep 20 21:56:07 2021 KojiUpdateComputersWifi internet fixedUg, factory resets... Caltech IMSS announced
that there was an intermittent network service
due to maintenance between Sept 19 and 20.
  
  16356   Wed Sep 22 17:22:59 2021 TegaUpdateElectronicsSat Amp modifications[Koji, Tega]

 

Decided to do a quick check of
  
  16357   Thu Sep 23 14:17:44 2021 TegaUpdateElectronicsSat Amp modifications debugging updateDebugging complete.

All units now have the correct
TP4 voltage reading needed to drive a
  
  16359   Thu Sep 23 18:18:07 2021 YehonathanUpdateBHDSOS assemblyI have noticed that the dumbells coming
back from C&B had glue residues on them.
An example is shown in attachment 1: it can
 dumbell_before.pngdumbell_after.png 
  16364   Wed Sep 29 09:36:26 2021 JordanUpdateSUS2" Adapter Ring Parts for SOS Arrived 9/28/21The remaining machined parts for the SOS
adapter ring have arrived. I will inspect
these today and get them ready for C&B.
 20210929_092418.jpg 
  16368   Thu Sep 30 14:13:18 2021 AnchalUpdateLSCHV supply to Xend Green laser injection mirrors M1 and M2 PZT restoredLate elog, original date Sep 15th

We found that the power switch
of HV supply that powers the PZT drivers
  
  16370   Fri Oct 1 12:12:54 2021 StephenUpdateBHDITMY (3002) CAD layout pushed to BoxKoji requested current state of BHD 3D
model. I pushed this to Box after adding
the additional SOSs and creating an EASM
 3002_20211001_ITMY_BHD_for_Koji_presentation_images.easm40m_upgrade_layout_20200611-ITMY_Beam_Dim.pdf 
  16373   Mon Oct 4 15:50:31 2021 HangUpdateCalibrationFisher matrix estimation on XARM parameters[Anchal, Hang]

What: Anchal and I measured the
XARM OLTF last Thursday.
 tf_meas.pdffisher_est_vs_data.pdfPxx_evol.pdffisher_evol.pdf 
  16377   Mon Oct 4 18:35:12 2021 PacoUpdateElectronicsSatellite amp box adapters[Paco]

I have finished assembling the
1U adapters from 8 to 5 DB9 conn. for the
 pcb_no_flush.jpg1U_assembly.jpgfourunits.jpg 
  16378   Mon Oct 4 20:46:08 2021 KojiUpdateElectronicsSatellite amp box adaptersThanks. You should be able to find the
chassis-related hardware on the left side
of the benchtop drawers at the middle workbench.
  
  16379   Mon Oct 4 21:58:17 2021 TegaUpdateElectronicsSat Amp modificationsTrying to finish 2 more Sat Amp units so
that we have the 7 units needed for the X-arm
install. 
  
  16380   Tue Oct 5 17:01:20 2021 KojiUpdateElectronicsSat Amp modificationsMake sure the inputs for the PD amps are
open. This is the current amplifier and we
want to leave the input pins open for the
  
  16384   Wed Oct 6 15:04:36 2021 HangUpdateSUSPRM L2P TF measurement & Fisher matrix analysis[Paco, Hang]

Yesterday afternoon Paco and I
measured the PRM L2P transfer function.
 prm_l2p_tf_meas.pdfprm_l2p_fisher_vs_data.pdfprm_l2p_Pxx_evol.pdfprm_l2p_fisher_evol.pdf 
  16386   Wed Oct 6 16:31:02 2021 TegaUpdateElectronicsSat Amp modifications[Tega, Koji]

(S2100737) - Debugging showed
that the opamp, AD822ARZ, for PD2 circuit
  
  16387   Thu Oct 7 02:04:19 2021 KojiUpdateElectronicsSatellite amp adapter chassisThe 4 units of Satellite Amp Adapter were
done:
- The ears were fixed with the screws
 P_20211006_205044.jpg 
  16388   Fri Oct 8 17:33:13 2021 HangUpdateSUSMore PRM L2P measurements[Raj, Hang]

We did some more measurements on
the PRM L2P TF. 
 Screenshot_2021-10-08_17-30-52.png 
  16389   Mon Oct 11 11:13:04 2021 ranaUpdateSUSMore PRM L2P measurementsFor the oplev, there are DQ channels you
can use so that its possible to look back
in the past for long measurements. They have
  
  16390   Mon Oct 11 13:59:47 2021 HangUpdateSUSMore PRM L2P measurementsWe report here the analysis results for
the measurements done in elog:16388. 
 prm_l2p_tf_meas_white.pdfprm_l2p_tf_meas_opt.pdfprm_l2p_fisher_vs_data_white_vs_opt.pdfprm_l2p_Pxx_evol_v2.pdf 
  16399   Wed Oct 13 15:36:38 2021 HangUpdateCalibrationXARM OLTFWe did a few quick XARM oltf measurements.
We excited C1:LSC-ETMX_EXC with a broadband
white noise upto 4 kHz. The timestamps for
 Screenshot_2021-10-13_15-32-16.png 
  16400   Thu Oct 14 09:28:46 2021 YehonathanUpdatePSLPMC unlockedPMC has been unlocked since ~ 2:30 AM.
Seems like the PZT got saturated. I moved
the DC output adjuster and the PMC locked
  
  16401   Thu Oct 14 11:25:49 2021 YehonathanUpdatePSLPMC unlocked{Yehonathan, Anchal}

I went to get a sandwich around
10:20 AM and when I came back BS was moving
 BS_OSEM_Sensor_PSD.pdfBS_OSEM_Sensor_PSD_AfterReconnectingCables.pdf 
  16403   Thu Oct 14 16:38:26 2021 Ian MacMillanUpdateGeneralKicking optics in freeSwing measurment[Ian, Anchal]

We are going to kick the optics
tonight at 2am.
  
  16405   Thu Oct 14 20:16:22 2021 YehonathanUpdateGeneralPRMI free swinging{Yehonathan, Raj}

We aligned the IFO in the PRMI
state and let it swing freely.
  
  16406   Fri Oct 15 12:14:27 2021 Ian MacMillanUpdateGeneralKicking optics in freeSwing measurment[Ian, Anchal]

we ran the free swinging test last
night and the results match up with in 1/10th
 20211015_Kicktest_plot.pdf 
  16410   Mon Oct 18 10:02:17 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Anchal, Koji]

- Checked the main volume is isolated.
- TP1 and TP2 were made isolated from
 Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png 
  16411   Mon Oct 18 16:48:32 2021 TegaUpdateElectronicsSat Amp modifications[S2100738, S2100745, S2100751] Completed
three more Sat Amp units modification with
seven remaining.
 IMG_20211018_162918574.jpg 
  16412   Tue Oct 19 10:59:09 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Yehonathan, Anchal,
Koji]

North door of the BS chamber opened
  
  16413   Tue Oct 19 11:30:39 2021 KojiUpdateVACHow to vent TP1I learned that TP1 was vented through the
RGA room in the past. This can be done by
opening VM2 and a manual valve ("needle
 Screen_Shot_2021-10-18_at_14.52.34.png 
  16418   Wed Oct 20 15:58:27 2021 KojiUpdateVACHow to vent TP1Probably the hard disk of c0rga is dead.
I'll follow up in this elog later today.

Looking at the log in /opt/rtcds/caltech/c1/scripts/RGA/logs
  
  16419   Thu Oct 21 11:38:43 2021 JordanUpdateSUSStandoffs for Side Magnet on 3" Adapter Ring SOS AssemblyI had 8 standoffs made at the Caltech chemistry
machine shop to be used as spacers for the
side magnets on the 3" Ring assembly.
 Magnet_Standoffs.jpg 
  16426   Tue Oct 26 10:17:14 2021 YehonathanUpdateBHDSOS assemblyThings that I need to start suspending
optics:

1. Winch adapter plate (D970314).
  
  16428   Tue Oct 26 14:53:24 2021 KojiUpdateElectronicsRack1. We have a rack at the 40m storage. We
are free to take it to the lab. If there
is a tag, tell the info to Liz. Let's
 P_20211026_143814.jpg 
  16439   Thu Oct 28 23:13:19 2021 YehonathanUpdateBHDSOS assembly{Tega, Yehonathan, Koji}

Suspension
 OpLev_Setup.jpgsuspended_optic.png20211029_113011.jpg20211029_113052.jpg 
  16442   Mon Nov 1 14:51:34 2021 KojiUpdateGeneralChecking the vent planThe vent team described
a detailed vent plan (and reports where the
actions have been performed)
  
  16443   Tue Nov 2 15:02:03 2021 YehonathanUpdateBHDSOS assembly{Yehonathan, Tega}

We took the free-swinging spectra
of the OpLev in the X and Y direction.
 FreeSwingingSpectra.pdf 
  16445   Tue Nov 2 18:54:41 2021 Anchal, PacoUpdateBHDOptical fibres laid for BHD upgradeWe successfully laid down all required
optical fibre fiber cables from 1X4-1X7
region to 1Y1-1Y3 region today. This includes
  
ELOG V3.1.3-