  9681   Thu Feb 27 13:11:13 2014 steveUpdatesafetysafety audit correction

    

       
            
 noDaisyChaining.jpgZbThumbnail.info 
  9699   Thu Mar 6 11:43:17 2014 steveUpdateGeneralGuralp control unitCMG-40T handheld controller unit is missing
its power supply. In order to zero the instrument
one has to apply plus and minus DC voltage.
 GuralpCU.jpgBAH.jpg 
  9704   Fri Mar 7 16:56:17 2014 steveUpdateIOOIOO qpds centered

    

       
            
 IOOqpdCentered.png 
  9705   Mon Mar 10 09:28:48 2014 steveUpdateIOOIOO pointing 2 days Morning seconds without adjustment.
 
 IOOpointing2d.pngmorningseconds.png 
  9725   Thu Mar 13 16:05:48 2014 steveUpdatesafetysafety audit 2014

    

       
            
 T1400198-v1-CIT-LIGO_Labs_Annual_Safety_Audit_2014.pdf 
  9730   Mon Mar 17 10:50:58 2014 steveUpdatesafety2014 annual crane certification

    

       
            
 2014craneCert.jpg 
  9743   Fri Mar 21 14:59:44 2014 steveUpdatePEMcontroling dustPlease take a look at the table top with
the flashlight before
 IMG_0044.JPG 
  9748   Mon Mar 24 22:13:37 2014 steveUpdateGeneralPower Failure

    

       
            
 poweroutage.png 
  9749   Tue Mar 25 14:52:57 2014 steveUpdateVACvacuum is recovered Out
gassing plus leak rate   0.15 
 17hrsNoPumping.png 
  9757   Fri Mar 28 16:26:20 2014 steveUpdateVACRGA scan after power failure

    

       
            
 afterPowerFailure.png 
  9802   Fri Apr 11 14:57:53 2014 steveUpdateLSCcongratulation 
 
 whenSheisHappy3h.pngmc4hArms3hrs.png 
  9870   Mon Apr 28 17:27:29 2014 steveUpdatesafetysafety audit 2014

    

       
            
  
  9873   Tue Apr 29 00:11:03 2014 steveUpdatesafetysafety audit 2014Be aware that
this may affect POP QPD and POP RF Thorlabs
  
  9895   Thu May 1 17:14:36 2014 steveUpdatePSLthin window AR measuredCVI broadband AR coating was measured at
the PSL-enclosure table around 9-10am today.
The 2W Innolight first PBS  S polarization
  
  9900   Fri May 2 08:15:54 2014 steveUpdatesafetysafety audit 2014 
 Late adition: CHECK all viewport covers.
 solidCoverRequired.jpg 
  9902   Fri May 2 10:38:29 2014 steveUpdatePSLthin window AR measured

    

       
            
  
  9914   Tue May 6 09:46:50 2014 steveUpdatePEMcleaning day Keven and Steve,
We cleaned around the Vertex chambers,
PSL and MC2 floor areas.
 120d.png 
  9915   Tue May 6 10:22:28 2014 steveUpdateCDSc1ioo dolphin fiber

    

       
            
 dolphin1x2.png 
  9918   Tue May 6 18:32:14 2014 steveUpdateLSCTRY 60Hz noise huntThis
is an effort to get rid of our ground loops
 ETMY-ISCT_EISOL.jpg 
  9921   Wed May 7 14:01:36 2014 steveUpdateLSCTRY 60Hz noise hunt

    

       
            
  
  9933   Thu May 8 17:25:17 2014 steveUpdateLSCTRY 60Hz noise hunt I
worked at the ETMY-ISCT this morning and
  
  9937   Fri May 9 11:23:11 2014 steveUpdateGreen Lockingdecreased X green light power Green light power decreased from 3 mW to
1 mW at the ETMX-ISCT shutter. More later.
  
  9941   Mon May 12 14:42:25 2014 steveUpdateendtable upgradeoptical table enclosure wall proposal and table at ETMY

    

       
            
 Hilite70.jpgETMY-ISCT.jpgRoscoThermashield.pdf 
  9965   Fri May 16 16:08:12 2014 steveUpdateLSCIsolating base plates Electronic components should be ISOLATED
as they are installed on the optical tables.
This is essential to avoid ground
 ISObaseplates.jpg 
  10007   Mon Jun 9 09:41:06 2014 steveUpdatesafetysafety training2014 surf students Nichin and Akhil received
40m specific basic safety training last week.
 2014surfs.jpg 
  10069   Thu Jun 19 10:39:22 2014 steveUpdatesafetysurf safety training 
 Andres Medina and Andrew "Harry"
Hall received 40m specific safety training.
 2014surfsAA.jpg 
  10071   Thu Jun 19 14:12:45 2014 steveUpdatesafetyoptical table scans 
 PSL, AP, ETMY and ETMX optical
tables were scanned for stay beam.
  
  10075   Thu Jun 19 17:11:52 2014 steveUpdatePEMit is warmer today The PSL HEPA was running at 30VAC-variac.
It is 1 degree C warmer than usual. The HEPA
fan motor turned up to 60 V
 warmertoday.png 
  10081   Fri Jun 20 14:42:57 2014 steveUpdateSUSvac illuminators turned off    
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework   8days.png 
  10350   Fri Aug 8 11:22:35 2014 steveSummarySUSoplev laser summary 
         
        2005             
  
  10362   Mon Aug 11 10:23:39 2014 steveSummarySUSoplev laser summary updated

    

       
            
  
  10518   Thu Sep 18 10:08:07 2014 steveSummarySUSoplev laser summary updated 




  
  10523   Mon Sep 22 10:18:58 2014 steveUpdatePEMlab temperatures 
 
 summerheat.png 
  10560   Thu Oct 2 14:36:52 2014 steveUpdatePEMoil drops on vertex crane

    

       
            
 VertexOilDrops.jpg 
  10665   Tue Nov 4 10:40:46 2014 steveUpdatePEMlab temperatures and particle counts 
 
 PEM100d.png 
  10761   Mon Dec 8 09:03:49 2014 steveUpdatePEMair cond maintenance tomorrow morning 
 AC maintenance is scheduled
from 8am till 11am tomorrow morning.
  
  10773   Wed Dec 10 14:26:13 2014 steveUpdatePEMair cond maintenance and particle plot

    

       
            
 05.png 
  11083   Fri Feb 27 10:25:24 2015 steveUpdateCamerasquad picture problemMUX input 7 to ITMXF camera cable was replaced
by temporary cable labeled as 888

The problem remains to be the same
 quadMUX.jpg 
  11148   Thu Mar 19 17:11:32 2015 steveSummarySUSoplev laser summary updated          
March  19, 2015   2 
new  JDSU 1103P, sn P919645 & P919639
  
  11178   Fri Mar 27 10:38:40 2015 steveUpdateVACvac rack UPS battery replacedBatteries replaced after 3.5 years with
Amstron AP-1250F2,  8x 12V 6Ah

 UPSvac.jpg 
  11227   Mon Apr 20 16:42:48 2015 steveUpdateSUSPRM and BS oplev laser replacedThe laser below is dead. JDSU 1103P, SN
P845655 lived for 3.5 years.

 newOplevLaser.png 
  11792   Fri Nov 20 09:45:39 2015 steveSummarySUSoplev laser summary  




 oplev_summery.png 
  12014   Tue Mar 1 09:37:15 2016 steveUpdateVACvac rack UPS batteries replacedAmstron batteries replaced after 11 months
with SP-12-5.5HR,  2 years warranty
from replaceUPSbattery.com
 vacRackBat.jpg 
  12054   Wed Mar 30 11:35:24 2016 steveUpdatesafetyBS visitor's viewport is protected with lexan[quote]The four horizontal viewports of arms
are protected 
by 3/8" thick, 8.5" OD Lexan disk of MR10
  
  12125   Mon May 23 10:55:49 2016 steveSummarySUSITMX oplev laser replaced 

     
May 23, 2016            
 ITMXoplev.png 
  12126   Mon May 23 15:51:32 2016 steveSummarySUSoplev laser summary updated 




 oplSum.png 
  12341   Wed Jul 27 11:40:48 2016 steveSummarySUSoplev laser summary updated 




  
  12498   Fri Sep 16 14:15:28 2016 steveUpdatePEMpartical countsSouth end flow bench and both clean room
assembly flow benches measured zero counts
for 0.3 and 0.5 micron size particales.
 80days.png 
  12553   Wed Oct 12 15:01:22 2016 steveUpdateSUSSOS ITM baffles plates are readyThe two 40 mm apeture baffles at the ends
were replaced by 50 mm one. ITM baffles with
50 mm apeture are baked ready for installation.
 baffle7x9_1.5.jpgbaffle_holder.jpgbaffle_top_view.jpg 