40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 335 of 357  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  899   Fri Aug 29 12:41:26 2008 josephb, EricConfigurationComputersMore front ends moved to new networkUsed Cat6 cables to finish moving all the
front ends in 1Y4 and 1Y5 over to the new
GigE network switches, specifically to the
  
  902   Fri Aug 29 16:35:18 2008 YoichiConfigurationPSLbeam block distorted[quote]There was a beam block after the Mach
Zender. Who or what put this there?
  
  903   Fri Aug 29 17:39:25 2008 ranaConfigurationPSLPMC: ADC ChannelsThe attached PNG shows the PMC error and controls
signals with no calibration.
 mcf.png 
  906   Sat Aug 30 13:28:01 2008 ranaConfigurationPSLPMC: List of changesThis is a list of changes made to the PMC
board while we had it out for modifying the
notch:
  
  908   Mon Sep 1 19:23:17 2008 YoichiConfigurationPSLFSS on an auxiliary loopSummary: The FSS is now temporarily disabled.
Naturally, the MC won't lock. I will fix
it tomorrow morning.
  
  910   Tue Sep 2 09:58:42 2008 YoichiConfigurationPSLFSS on an auxiliary loop[quote]Summary: The FSS is now temporarily
disabled. Naturally, the MC won't lock. I
will fix it tomorrow morning.
  
  913   Tue Sep 2 22:43:16 2008 YoichiConfigurationPSLUpdated FSS open loop TFSince the LO level of the FSS servo was too
low, I replaced the RF oscillator board with
a combination of
 OPLTF.png 
  915   Wed Sep 3 18:43:19 2008 YoichiConfigurationElectronicsTwo more active probesI found two active probes, an HP41800A and
a Tektronix P6201.
Thanks John for telling me you saw them before.
 Tektronix-P6201-active-probe.pdf 
  916   Wed Sep 3 18:45:01 2008 AlbertoConfiguration PD3 gainAlberto, Yoichi,

We found that the PD3 servo was unstable
  
  922   Thu Sep 4 11:33:25 2008 josephb, Eric, JenneConfigurationComputersAttempt to increase gain for C1:PSL-ISS_INMONPD_F via 110BWe were attempting to increase the gain on
the channel C1:PSL-ISS_INMONPD_F in preparation
to do a scan of the PMC at very low input
  
  925   Thu Sep 4 16:24:56 2008 ranaConfigurationComputersAttempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B[quote]We were attempting to increase the
gain on the channel C1:PSL-ISS_INMONPD_F
in preparation to do a scan of the PMC at
  
  930   Thu Sep 4 18:02:34 2008 rana, josephbConfigurationPEMAccelerometer gains increased by 10[COLOR=chocolate][SIZE=3]We increased the
Accelerometer gains by 10 by modifying the
C1ADCU_PEM.ini file.[/SIZE][/COLOR]
 acc.png 
  932   Fri Sep 5 09:56:14 2008 josephb, EricConfigurationComputersFunny channels, reboots, and ethernet connections1) Apparently the I00-ICS type channels had
gotten into a funny state last night, where
they were showing just noise, exactly when
  
  937   Mon Sep 8 15:38:57 2008 YoichiConfigurationPSLPOY RF amp is back to its original taskI temporarily fixed the busted ZHL-32A RF
amplifier's power connector by simply soldering
a cable to the internal circuit and pulling
  
  941   Thu Sep 11 11:29:14 2008 josephbConfigurationComputersFinal netgear switch in place in 1Y2I've placed the final (of 4) Netgear prosafe
24 port switch at the very top of 1Y2.  At
that location, there are no holes left to
  
  948   Mon Sep 15 14:00:52 2008 josephbConfigurationComputers1Y9 Hub and C1ascThe 1Y9 switch is now using a labeled Cat6
cable in cable trays to connect to the main
switch in the offices.  In addition, the
  
  949   Tue Sep 16 10:57:45 2008 YoichiConfigurationPEMParticle counter gainSummary:
Since we reduced the integration time of
the particle counter by a factor of 10, we
  
  950   Tue Sep 16 13:04:22 2008 YoichiConfigurationPEMC1:PSL-FSS_RMTEMP alarm level changedAt the request of Steve, I modified the HIGH
value of C1:PSL-FSS_RMTEMP from 21.27 to
23.0.
  
  951   Tue Sep 16 16:47:01 2008 peteConfigurationPSLPrototype FSS reference installedAfter verifying output, I installed the new
prototype 21.5 MHz FSS reference (Wenzel
crystal oscillator and ZHL-2 amp).  Yoichi
  
  952   Wed Sep 17 12:55:28 2008 robConfigurationIOOMC lengthI measured the mode cleaner length last night:

[code]
  
  954   Wed Sep 17 13:43:54 2008 YoichiConfigurationPSLRC sweep going onI'm doing a cavity sweep of the RC. Please
leave the IFO untouched until the meeting
is over.
  
  957   Wed Sep 17 15:22:31 2008 YoichiConfigurationPSLRC sweep going on[quote]I'm doing a cavity sweep of the RC.
Please leave the IFO untouched until the
meeting is over.[/quote]
  
  959   Wed Sep 17 17:58:35 2008 YoichiConfigurationPSLRC sweep going onThe cavity sweep is done. The IFO is free
now.
  
  965   Thu Sep 18 14:36:54 2008 josephbConfigurationComputersName server and EpicsThe problems Rob was experiencing last night
was due to part of the setup (or rather testing
of the setup) of the new nameserver running
  
  973   Fri Sep 19 11:21:45 2008 josephbConfigurationComputersNameserver and RosalbaI tried modifying the nsswitch.conf file to
include going to dns in addition to local
files for everything (services, network,
  
  980   Mon Sep 22 21:30:06 2008 ranaConfigurationPSLbad FSSThe MC refl power was going up and the FSS
PC drive was so large that I had to turn
up the FSS
 DAQ.png 
  982   Mon Sep 22 22:24:19 2008 ranaConfigurationPSLbad FSS[quote]The MC refl power was going up and
the FSS PC drive was so large that I had
to turn up the FSS...[/quote]
  
  986   Tue Sep 23 15:28:06 2008 peteConfigurationPSLnew 21.5 MHz FSS reference installedThe new 21.5 MHz FSS reference is now installed
in the rack with the 7 Sorensen PS.  Both
outputs give 18.7 dBm.  The MC seems happy.
 fss_ref_001.jpgfss_ref_013.jpg 
  988   Wed Sep 24 19:13:06 2008 ranaConfigurationComputer Scripts / Programsupdatedb & locate: megatron & rosalbaI ran [I]updatedb[/I] as root today on megatron
and rosalba just before the meeting. 
It finished at ~14:10 on both machines so
  
  992   Thu Sep 25 14:03:08 2008 josephbConfigurationComputers [quote]
We (Joe) need to buy a GigE card for linux1
and to also set up conlog and conlogger to
  
  994   Thu Sep 25 17:14:31 2008 ranaConfigurationGeneralnew sitemap   vegemite.png 
  997   Fri Sep 26 14:10:21 2008 YoichiConfigurationComputersLab laptops maintenanceThe linux laptops were unable to write to
the NFS mounted directories. 
That was because the UID of the controls
  
  1001   Fri Sep 26 19:08:43 2008 ranaConfigurationPSLRefcav Trans: PD + Camera + DumpsI went out to improve the Refcav trans path.

I removed all ND filters to get rid of the
  
  1006   Mon Sep 29 13:33:39 2008 josephbConfigurationComputersGigabit network finished and conlog available on NodusThe last 100 Mb unmounted hub has been removed
(or at least of the ones I could find). 
We should be on a fully gigabit network with
  
  1015   Wed Oct 1 12:05:58 2008 AlbertoConfigurationComputers"StochMon" added to the Alarm HandlerJohn, Alberto,

we added the four channels of the RF Amplitude
  
  1016   Wed Oct 1 12:09:25 2008 AlbertoConfigurationComputers"StochMon" added to the Alarm Handler[quote]John, Alberto,

we added the four channels of the RF Amplitude
  
  1018   Wed Oct 1 23:21:03 2008 YoichiConfigurationPSLReference cavity reflection cameraI re-centered the reference cavity reflection
camera, which has been mis-aligned for a
while.
  
  1022   Fri Oct 3 12:15:21 2008 AlbertoConfigurationIOOC1iool0 rebootedThis morning, in order to update the threshold
values of the alarm handler for the StochMon,
I rebooted the C1iool0 computer following
  
  1031   Tue Oct 7 12:17:57 2008 AlbertoConfigurationComputersTime reset on MEDMYoichi, Alberto

I noticed the MEDM screen time was about
  
  1033   Wed Oct 8 12:35:56 2008 josephbConfigurationComputersNew Network diagram for the 40mAttached is a pdf of the new network diagram
for the 40m after having removed all of the
old hubs.
 40m_network_10-07-08.pdf 
  1034   Wed Oct 8 19:17:55 2008 YoichiConfigurationPSLLaser power is slowly recoveringThis afternoon we (rich, steve, yoichi) shutdown
the laser for the DC-DC converter installation.
  
  1036   Wed Oct 8 22:23:43 2008 YoichiConfigurationElectronicsElectronics work bench cleanupYesterday, I cleaned up the electronics work
bench. I figured that keeping the work bench
in order has larger effect on the work efficiency
 Cleanup.jpg 
  1041   Fri Oct 10 20:03:35 2008 YoichiConfigurationComputersmedm, dataviewer, dtt on 64 bit linuxI compiled EPICS (base, medm and ezca) and
dataviewer for 64 bit linux.
These are installed in /cvs/cds/caltech/apps/linux64/.
  
  1043   Mon Oct 13 13:51:49 2008 peteConfigurationPSLattempt to measure FSS ref phaseOn Friday I began a measurement of the FSS
reference phase.  The setup involves the
following:
  
  1046   Tue Oct 14 14:19:36 2008 peteConfigurationPSLFSS ref phaseToday I made several measurements which should
yield the optimized phase for the FSS 21.5
MHz reference.  I made two sets of measurements,
  
  1048   Tue Oct 14 19:24:34 2008 YoichiConfigurationPSLFSS light power reducedRana, Yoichi

To change the gain distribution in the FSS,
  
  1050   Wed Oct 15 22:07:52 2008 peteConfigurationPSLFSS ref phase measurementsOptimizing the FSS LO/RF phase at 500 kHz,
above the servo band, proved to be noisy
and those measurements were useless.  Today
 phasedelay.png 
  1052   Thu Oct 16 09:47:49 2008 YoichiConfigurationPSLFSS ref phase measurements[quote] I fit the bottom (quadratic) portion
of this curve, and found an optimum delay
of 25.8 ns, which can be implemented as 25.81
  
  1053   Thu Oct 16 13:12:58 2008 peteConfigurationPSLphase between FSS reference outputsI verified the phase between the FSS reference
outputs (used for LO and RF) using matched
BNC cables.  I measured 0.95 degree (average
  
  1054   Thu Oct 16 16:26:26 2008 peteConfigurationPSLFSS phase matching cable installedRG 405 cable has a solid teflon dielectric,
and a velocity factor of 0.69.  To get the
8.2 degrees of additional phase on the LO
  
ELOG V3.1.3-