8240
|
Wed Mar 6 11:33:09 2013 |
steve | Update | SAFETY | safety audit 2013 |
Recommended correction list:
1, refill- upgrade first aid boxes
2, maintain 18" ceiling to bookshelf clearance so the ceiling fire sprinklers are not blocked: room 101
3, label chilled water supply & return valves in IFO room
4, calibrate bake room hoods annually
5, update safety sign at fenced storage
40m still to do list:
1, clean and measure all safety glasses
2, annual crane inspection is scheduled for 8am March 19, 1013
3, make PSL encloser shelf earthquake proof
Do you see something that is not safe? Add it to this list please.
|
8287
|
Wed Mar 13 16:04:24 2013 |
steve | Update | SAFETY | laser safety glasses checked | All safety glasses were cleaned in soapy water by Bob. I measured their transmission at 1064 nm, 150 mW, beam diameter 1.5 mm They are in working order, no transmission.
Inventory:
10 pieces of KG-5, fit over, from Laser Safety
4 pieces of KG-5, std size, from Drever Lab, best visibility
1 piece of KG-5 coated for visible, std size, from Kentek
15 pieces of green-plastic LOTG-YAG, fit over, from UVEX
7 pieces of green-plastic B-D+S 137, std areo fit, from Sperian
3 pieces of green-plastic, old Thorlab, fit over
2 pieces of green-plastic, fit over, from Laservision
8 pieces of braun- plastic, fit over, for green & IR protection, from UVEX & Thorlabs |
8309
|
Tue Mar 19 10:30:00 2013 |
steve | Update | SAFETY | crane inspection 2013 |
Professional crane inspector: Fred Goodbar found two small leaks at the Vertex trolley as he was conducting the annual inspection of the 40m cranes. Otherwise the cranes are in safe condition. |
8661
|
Fri May 31 10:25:17 2013 |
steve | Update | safety | first aid kits refilled |
Quote: |
Recommended correction list:
1, refill- upgrade first aid boxes
2, maintain 18" ceiling to bookshelf clearance so the ceiling fire sprinklers are not blocked: room 101
3, label chilled water supply & return valves in IFO room
4, calibrate bake room hoods annually
5, update safety sign at fenced storage
40m still to do list:
1, clean and measure all safety glasses
2, annual crane inspection is scheduled for 8am March 19, 1013
3, make PSL encloser shelf earthquake proof
Do you see something that is not safe? Add it to this list please.
|
Restocked First Aid Kits Location:
Main entrance, room 100
Drill press - above N2 cylinders, room 103
Control room, next to fire extinguisher, room 102
Vertex-north wall, IFO room 104
ETMY - right on ends light switches, IFO room 104_ east end
ETMX - on vertical I-beam of crane, IFO room 104_south end
Behind 1X3 Rack, on south wall - under instrument breakers panel PC-1, IFO room 104
Last thing remaining to be fixed from 2013 Safety Audit:
replace book shelf with 83" height
|
8687
|
Thu Jun 6 16:33:19 2013 |
steve | Update | safety | updated laser inventory | Updated laser inventory and operator list. They are posted in the 40m wiki and entry doors of the 40m IFO room.
Let me know if this list needs correction.
Lightwave M126N-1064-700 NPRO sn 337 in the PSL enclosure got connected to local emergency shut off switch. This is a LIGO operational safety requirement.
|
9090
|
Fri Aug 30 08:08:29 2013 |
steve | Update | safety | fire horns-flashers tested OK |
We had fire alarm tests and evacuation drills at 1:30pm yesterday. All flashers and horns are functioning unbearably loud and bright including clean assembly room. |
9653
|
Wed Feb 19 08:07:01 2014 |
steve | Update | safety | annual laser safety glasses check |
All 40m laser safety glasses are cleaned and measured this morning. Bring your own safety glasses if you have to enter the 40m IFO room.
Glasses were washed in 1% Liquinox water solution and their transmission measured at 165 mW, 2 mm OD beam of 1064 nm |
9672
|
Tue Feb 25 16:54:57 2014 |
steve | Update | safety | safety audit 2014 |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops. |
9681
|
Thu Feb 27 13:11:13 2014 |
steve | Update | safety | safety audit correction |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Linus-1, Nodus and others ac cords can be moved over to new blank yellow extension cord with multiple recepticals.
Remove two red extension cords going to Smart UPS |
9699
|
Thu Mar 6 11:43:17 2014 |
steve | Update | General | Guralp control unit | CMG-40T handheld controller unit is missing its power supply. In order to zero the instrument one has to apply plus and minus DC voltage.
The wiring on this 10 pin Amphenol PT02E-12-10P is shown. |
9704
|
Fri Mar 7 16:56:17 2014 |
steve | Update | IOO | IOO qpds centered |
Quote: |
Quote: |
The IMC has not been behaving well since this morning and totally not happy when Q was finishing his measurements. The WFS servo had large offsets in pitch. Looking back at the trend and using ezcaservo to restore the suspensions did not help.
I realigned the IMC and brought TRANS SUM to ~18000 and MCREFL to < 0.5. The spot positions are not very good; nearly 2 mm off in pitch on MC1 and MC3. But after the alignment of MC, the WFS servo offsets were below +/-20.
The MC has been locked stably with WFS servo ON for the last few hours.
P.S. I did not touch the WFS pointing or reset the WFS offsets.
|
MC remained locked with WFS enabled all through last night and this morning. Koji dropped by and looked at the MC. The MC WFS servo, though stable, was at the edge of becoming unstable. This was because I did not touch the WFS pointing on the QPDs yesterday after realigning. So I recentered the WFS, reset the WFS filterbank offsets and reenabled the servo.
I measured the spot positions on MC mirrors for reference.
Spot positions in mm (MC1,2,3 pit MC1,2,3 yaw): [1.405767579680834, 0.79369009503571208, 1.3220430681427462, -1.2937873599406551, -1.1704264340968924, -1.2518046122798692]
|
|
9705
|
Mon Mar 10 09:28:48 2014 |
steve | Update | IOO | IOO pointing 2 days | Morning seconds without adjustment.
|
9725
|
Thu Mar 13 16:05:48 2014 |
steve | Update | safety | safety audit 2014 |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1 |
9730
|
Mon Mar 17 10:50:58 2014 |
steve | Update | safety | 2014 annual crane certification |
Quote: |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1
|
KroneCrane Fred inspected and certified the 3 40m cranes for 2014. The vertex crane crane was load tested at fully extended position. |
9743
|
Fri Mar 21 14:59:44 2014 |
steve | Update | PEM | controling dust | Please take a look at the table top with the flashlight before removing it. If it is dusty, wipe it down with dry lint free cloth in the box.
There is one box with flash light and wiper at AP, ETMY & ETMX optical tables. |
9748
|
Mon Mar 24 22:13:37 2014 |
steve | Update | General | Power Failure |
Quote: |
I'm checking the status from home.
P1 is 8e-4 torr
nodus did not feel the power outage (is it APS supported?)
linux1 booted automatically
c1ioo booted automatically.
c1sus, c1lsc, c1iscex, c1iscey need manual power button push.
|
9:11pm closed PSL shutter, turned Innolight 2W laser on,
turned 3 IFO air cond on,
CC1 5.1e-5 torr, V1 is closed, Maglev has failed, valve configuration is " Vacuum Normal " with V1 & VM1 closed, RGA not running, c1vac1 and c1vac2 were saved by UPS,
(Maglev is not connected to the UPS because it is running on 220V)
reset & started Maglev.........I can not open V1 without the 40mars running...........
Rossa is the only computer running in the control room,
Nodus and Linux1 was saved by UPS,
turned on IR lasers at the ends, green shutters are closed
It is safe to leave the lab as is.
|
9749
|
Tue Mar 25 14:52:57 2014 |
steve | Update | VAC | vacuum is recovered | Out gassing plus leak rate 0.15 mTorr / hour
The pressure rose to 2.5 mTorr in 17 hours
V1 was opened at 1:56pm
VM2 opened at 2:10 so the RGA region is back to 1e-5 torr
|
9757
|
Fri Mar 28 16:26:20 2014 |
steve | Update | VAC | RGA scan after power failure |
Quote: |
Out gassing plus leak rate 0.15 mTorr / hour
The pressure rose to 2.5 mTorr in 17 hours
V1 was opened at 1:56pm
VM2 opened at 2:10 so the RGA region is back to 1e-5 torr
|
|
9802
|
Fri Apr 11 14:57:53 2014 |
steve | Update | LSC | congratulation |
|
9870
|
Mon Apr 28 17:27:29 2014 |
steve | Update | safety | safety audit 2014 |
Quote: |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1
|
Last long extension cord removed from 1Y1 to ITMX-ISCT
The AC power strip at ITMX-ISCT is coming from wall L#26 |
9873
|
Tue Apr 29 00:11:03 2014 |
steve | Update | safety | safety audit 2014 | Be aware that this may affect POP QPD and POP RF Thorlabs PD
Quote: |
Last long extension cord removed from 1Y1 to ITMX-ISCT
The AC power strip at ITMX-ISCT is coming from wall L#26
|
|
9895
|
Thu May 1 17:14:36 2014 |
steve | Update | PSL | thin window AR measured | CVI broadband AR coating was measured at the PSL-enclosure table around 9-10am today. The 2W Innolight first PBS S polarization beam was used with an other 1/2 wave plate and PBS.
W2-PW1-1004-C-633-1064-0 This 0.045" thick window has 0.7- 0.8 % reflected beam on each sides at 5 degrees of incidence, P polarization.
The specification is R avg <0.5 % per surface at 0 degree
Rana wants The device would be useless with such a high R, but R 0.1% is OK so I will get V coating.
|
9900
|
Fri May 2 08:15:54 2014 |
steve | Update | safety | safety audit 2014 |
Late adition: CHECK all viewport covers.
A, transparent Lexan sheet is protecting glass windows in a horizontal position
B, metal housing protection is required on each viewport except signal ports
C, signal ports should be shielded by optical table enclosure
We have to cover this window-camera with implosion proof cover or just remove it and blank it.
Question number 2: Do our vertically positioned windows with flip able covers require protective lexan ? NO 5-5-2014 |
9902
|
Fri May 2 10:38:29 2014 |
steve | Update | PSL | thin window AR measured |
Quote: |
CVI broadband AR coating was measured at the PSL-enclosure table around 9-10am today. The 2W Innolight first PBS S polarization beam was used with an other 1/2 wave plate and PBS.
W2-PW1-1004-C-633-1064-0 This 0.045" thick window has 0.7- 0.8 % reflected beam on each sides at 5 degrees of incidence, P polarization.
The specification is R avg <0.5 % per surface at 0 degree
Rana wants The device would be useless with such a high R, but R 0.1% is OK so I will get V coating.
|
CVI V-AR coating at 1064 nm, 0 degree, catalog item is R< 0.25% on each sides,
R <0.1 % is custom at much higher prices.
This custom order should go with other orders that has similar need.
From CVI: 5-6-2014
I checked the trace info on the W2-PW1-1004-C-633-1064-0, BBAR coated window that you received. It is side 1, 0.42%R & side 2, 0.53%R @ 1064nm. And with the shift, I’m not too surprised you ended up with 0.7%. A V coat would start with <0.25% (and more typically coming in at ~0.1%) per surface. As far as stock options, I have a 1”dia x 4mmT, fused silica window that is recorded as side 1, R=0.09 and Side 2, R=0.08% @ 1064. Is this too think or will it work for you?
|
9914
|
Tue May 6 09:46:50 2014 |
steve | Update | PEM | cleaning day | Keven and Steve,
We cleaned around the Vertex chambers, PSL and MC2 floor areas.
|
9915
|
Tue May 6 10:22:28 2014 |
steve | Update | CDS | c1ioo dolphin fiber |
Quote: |
Steve and I nicely routed the dolphin fiber from c1ioo in the 1X2 rack to the dolphin switch in the 1X4 rack. I shutdown c1ioo before removing the fiber, but still all the dolphin connected models crashed. After the fiber was run, I brought back c1ioo and restarted all wedged models. Everything is green again:

|
I put label at the dolphin fiber end at 1X2 today. After this I had to reset it, but it failed. |
9918
|
Tue May 6 18:32:14 2014 |
steve | Update | LSC | TRY 60Hz noise hunt | This is an effort to get rid of our ground loops by isolating the electronic components from the optical table.
Aluminum mounting base plates of Thorlabs BA2 and Newport B-2 were replaced by plates or post made out of delrin material.
This is an insulator. DELRIN base plates were installed 6 places. The oplev-qpd has Nylon base plate.
The NPRO and HE/NE lasers are not isolated from the table. S8 and S9
I'm not sure about the doubling oven S10 
The optical table is grounded at G11 through ~1 Mohms to the ETMY chamber.
Alignment touch up needed at all D-marked component!
|
9921
|
Wed May 7 14:01:36 2014 |
steve | Update | LSC | TRY 60Hz noise hunt |
Quote: |
This is an effort to get rid of our ground loops by isolating the electronic components from the optical table.
Aluminum mounting base plates of Thorlabs BA2 and Newport B-2 were replaced by plates or post made out of delrin material.
This is an insulator. DELRIN base plates were installed 6 places. The oplev-qpd has Nylon base plate.
The NPRO and HE/NE lasers are not isolated from the table. S8 and S9
I'm not sure about the doubling oven S10 
The optical table is grounded at G11 through ~1 Mohms to the ETMY chamber.
Alignment touch up needed at all D-marked component!
|
Attachment appendix:
D: component delrin isolated
N: component nylon isolated ( or Delrin )
S: component shell is shorting to optical table (except oven)
G: optical table ground
I failed to maximize TRY the pds. |
9933
|
Thu May 8 17:25:17 2014 |
steve | Update | LSC | TRY 60Hz noise hunt | I worked at the ETMY-ISCT this morning and late afternoon. I will continue the 60 Hz noise hunt tomorrow. |
9937
|
Fri May 9 11:23:11 2014 |
steve | Update | Green Locking | decreased X green light power | Green light power decreased from 3 mW to 1 mW at the ETMX-ISCT shutter. More later. |
9941
|
Mon May 12 14:42:25 2014 |
steve | Update | endtable upgrade | optical table enclosure wall proposal and table at ETMY |
Quote: |
Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of 0.007" thermashield and 0.125" yellow acrylic
Visibility: 70 %, Transmission of 1064 nm 2-3 % at 0-50 degrees incident, power density ~ 0.7 W/mm2
Max power 100 mW
|
More details about this east end " acrylic + " enclosure ( optical table cover ) can be found elog entry 6210, 7194 and 7106
Window tinted layer transmission plot is below.
We have a film which may meet your requirements and the values are shown below:
Wavelength (nm) Transmission Reflectance(front) Reflectance (back)
1060 .0772 .604 .759
1070 .0723 .615 .772
These values are taken from the LBNL Optics 6 program and if you have access to that program, the NFRC ID for the film is 202. If you do not have access to the program, I have a captured the graph which may be of some help. I apologize for the appearance of the graph but someone at LBNL decided it would look better with a dark gray background – the yellow is the transmission curve, the blue is the reflectance (front) and the green is the reflectance (back).

The film is referred to as “Hilite 70” and has a 72% visible light transmission. These results were obtained with the film mounted on 1/8” clear glass.
I
Saint-Gobain Performance Plastics
www.solargard.com
Please consider your environmental responsibility before printing this email.
|
|
|
|
9965
|
Fri May 16 16:08:12 2014 |
steve | Update | LSC | Isolating base plates | Electronic components should be ISOLATED as they are installed on the optical tables.
This is essential to avoid ground loops, 60 Hz and harmonic peaks in the spectrum. We have just got some made.
Please only use it for this reason. Earlier black delrin base plates were used up in not needed places.
The anodized Aluminum base plates with magenets certainly will conduct.
|
10007
|
Mon Jun 9 09:41:06 2014 |
steve | Update | safety | safety training | 2014 surf students Nichin and Akhil received 40m specific basic safety training last week. |
10069
|
Thu Jun 19 10:39:22 2014 |
steve | Update | safety | surf safety training |
Andres Medina and Andrew "Harry" Hall received 40m specific safety training. They did general safety already and their laser safety training will be this after noon. |
10071
|
Thu Jun 19 14:12:45 2014 |
steve | Update | safety | optical table scans |
PSL, AP, ETMY and ETMX optical tables were scanned for stay beam. |
10075
|
Thu Jun 19 17:11:52 2014 |
steve | Update | PEM | it is warmer today | The PSL HEPA was running at 30VAC-variac. It is 1 degree C warmer than usual. The HEPA fan motor turned up to 60 V |
10081
|
Fri Jun 20 14:42:57 2014 |
steve | Update | SUS | vac illuminators turned off | |
10131
|
Mon Jul 7 08:13:41 2014 |
steve | Update | General | yes,there was firework | |
10350
|
Fri Aug 8 11:22:35 2014 |
steve | Summary | SUS | oplev laser summary |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
10362
|
Mon Aug 11 10:23:39 2014 |
steve | Summary | SUS | oplev laser summary updated |
Quote: |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
May 13, 2014 ETMX, .............laser in place 90 d
May 22, 2012 ETMY,
Oct. 7, 2013 ETMY, LT 503 d or 1.4 y............bad beam quality ?
Aug. 8, 2014 ETMY, .............laser in place 425 days or 1.2 y
|
10518
|
Thu Sep 18 10:08:07 2014 |
steve | Summary | SUS | oplev laser summary updated |
Quote: |
Quote: |
2005 ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW
Sep. 28, 2006 optical lever noise budget with DC readout in 40m, LIGO- T060234-00-R, Reinecke & Rana
May 22, 2007 BS, SRM & PRM He Ne 1103P takes over from diode
May 29, 2007 low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007
Nov 30, 2007 Uniphase 1103P divergence measured
Nov. 30, 2007 ETMX old Uniphase 1103P from 2002 dies: .............., running time not known......~3-5 years?
May 19, 2008 ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~ ?
Oct. 2, 2008 ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier
JDSU 1103P were replaced as follows:
May 11, 2011 ETMX replaced, life time 1,258 days or 3.4 years
May 13, 2014 ETMX , LT 1,098 days or 3 y
May 22, 2012 ETMY, LT 1,464 days or 4 y
Oct. 5, 2011 BS & PRM, LT 4 years, laser in place at 1,037 days or 2.8 y
Sep. 13, 2011 ITMY old 1103P & SRM diode laser replaced by 1125P ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y
June 26, 2013 ITMX 622 days or 1.7 y note: we changed because of beam quality.........................laser in place 420 days or 1.2 y
Sep. 27, 2013 purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )
|
May 13, 2014 ETMX, .............laser in place 90 d
May 22, 2012 ETMY,
Oct. 7, 2013 ETMY, LT 503 d or 1.4 y............bad beam quality ?
Aug. 8, 2014 ETMY, .............laser in place 425 days or 1.2 y
|
Sept. 5, 2014 new 1103P, sn P893516 installed at SP table for aLIGO oplev use qualification
|
10523
|
Mon Sep 22 10:18:58 2014 |
steve | Update | PEM | lab temperatures |
|
10560
|
Thu Oct 2 14:36:52 2014 |
steve | Update | PEM | oil drops on vertex crane |
Quote: |
KroneCrane Fred inspected and certified the 3 40m cranes for 2014. The vertex crane crane was load tested at fully extended position.
|
Small oil drops were found during prevent inspection of the vertex crane. They were wiped off. It took 231 days to grow this size. |
10665
|
Tue Nov 4 10:40:46 2014 |
steve | Update | PEM | lab temperatures and particle counts |
|
10761
|
Mon Dec 8 09:03:49 2014 |
steve | Update | PEM | air cond maintenance tomorrow morning |
AC maintenance is scheduled from 8am till 11am tomorrow morning. |
10773
|
Wed Dec 10 14:26:13 2014 |
steve | Update | PEM | air cond maintenance and particle plot |
Quote: |
AC maintenance is scheduled from 8am till 11am tomorrow morning.
|
IFO air condition maintenance will continue tomorrow morning and it should be finished by 11:30AM
We have new guys taking over this job: Sal and Chris so it takes longer. The units will be shut down for a bit.
They will not enter the IFO lab. The CES housed units will be worked on. |
11083
|
Fri Feb 27 10:25:24 2015 |
steve | Update | Cameras | quad picture problem | MUX input 7 to ITMXF camera cable was replaced by temporary cable labeled as 888
The problem remains to be the same black stripe at the bottom of the image The single picture is OK. |
11148
|
Thu Mar 19 17:11:32 2015 |
steve | Summary | SUS | oplev laser summary updated | March 19, 2015 2 new JDSU 1103P, sn P919645 & P919639 received from Thailand through Edmond Optics. Mfg date 12/2014............as spares |
11178
|
Fri Mar 27 10:38:40 2015 |
steve | Update | VAC | vac rack UPS battery replaced | Batteries replaced after 3.5 years with Amstron AP-1250F2, 8x 12V 6Ah
Quote: |
APC Smart -UPS 2200 model: SUA2200RM2U batteries were replaced by compatible RBC43, 8x 12V5A
|
|
11227
|
Mon Apr 20 16:42:48 2015 |
steve | Update | SUS | PRM and BS oplev laser replaced | The laser below is dead. JDSU 1103P, SN P845655 lived for 3.5 years.
Quote: |
JDSU 1103P died after 4 years of service. It was replaced with new identical head of 2.9 mW output. The power supply was also changed.
The return spots of 0.04 mW 2.5 mm diameter on qpds are BS 3,700 counts and PRM 4,250 counts.
|
It was replaced by JDSU P/N 22037130,( It has a new name for 1103P Uniphase ) sn P919639 of mfg date 12-2014
Beam shape at 5 m nicely round. Output power 2.8 mW of 633 nm
BS spot size on qpd ~1 mm & 60 micro W
PRM spot size on qpd ~1 mm & 50 micro W |
|