40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 341  Not logged in ELOG logo
Entry  Wed Dec 16 10:22:14 2015, Steve, Update, IOO, this morning PMClocked.png
c1sus and c1ioo were restarted. PMC locked.
 
Entry  Wed Apr 30 11:16:41 2014, Steve, Update, IOO, this typical morning 40days.png
c1sus and c1iscey were reset. The PMC needed to be locked. MC locked instantly.
The FSS ion pump power supply was turned on.
 
    Reply  Fri May 2 08:38:07 2014, Steve, Update, IOO, this typical morning 2dTrend.png
 
 c1sus needed reset.
Entry  Thu Aug 13 11:20:43 2009, janosch, HowTo, PEM, three-channel self-noise estimation 
There are two new Matlab files on the svn in /mDV/extra/C1. 'mycsd.m' is to calculate the cross-spectral density between two channels, 'csd_40T_40T_SS1.m'
calls this function with the available seismic channels and derives a self-noise spectrum for the vertical axis using all three seismometers. The method
requires that there are no correlations between two instruments only which is a bad idealization for certain frequencies if you have seismometers of totally
    Reply  Mon Nov 10 19:39:40 2008, steve, Update, PEM, thump noise from particle counter partcfm.jpg
The particle counter is back on the IOOC location on a piece of  FOAM 
It needs this isolation, so when the pump is running, it's not shaking things.
The counter was counting for 6 sec and it was on holding for 20 mins.
    Reply  Tue Nov 12 23:05:06 2013, rana, Update, PEM, thump noise from particle counter 
[quote]The particle counter is back on the IOOC location on a piece of  FOAM 
It needs this isolation, so when the pump is running, it's not shaking things.
The counter was counting for 6 sec and it was on holding for 20 mins.
Entry  Fri Feb 27 13:49:19 2009, rob, Update, Locking, thurs night 
Could not get past arm power of ~11 or so.  I was suspicious of the transmon high-gain/low-gain PD handover, so I ran the matchTransMon scripts,
but that did not help.  I also removed the line in the cm_step script that increased the CM gain by 18dB at an arm power of 4.  The gain of the
CM servo will increase naturally as the power in the IFO builds up, so it may not be good to crank it right away.  I tried several other CM gains,
    Reply  Thu Aug 12 16:18:46 2010, steve, Update, Environment, tiles and adhesive removed P1060604.JPGP1060606.JPGP1060603.JPGP1060610.JPGDSC_2388.JPG


    
        
            Quote:
        
        
            
            I powered down 1Y1 and 1Y2 instrument racks of MC and RF-systems this morning.
    Reply  Thu Aug 2 16:30:08 2018, Steve, Update, Treasure, time capsule location time_capsule.JPG
I 've just found this time capsule note from Nov. 26, 2000 by Kip Thorne:  LIGO will discover gravitational waves by Dec.31, 2007




Quote:



  
Entry  Fri Jul 6 08:38:04 2012, steve, Update, Computers, time out timingblanks.png
Why do we have these timing blanks?
Entry  Thu Mar 11 14:27:56 2021, gautam, Update, CDS, timesync issue? timesync.pngc1lscMods.png
I have recently been running into hitting the 4MB/s data rate limit on testpoints - basically, I can't run DTT TF and spectrum measurements that
I was able to while locking the interferometer, which I certainly was able to this time last year. AFAIK, the major modification made was the addition
of 4 DQ channels for the in-air BHD experiment - assuming the data is transmitted as double precision numbers, i estimate the additional load due to this
Entry  Tue Nov 23 10:53:20 2010, josephb, Update, CDS, timing issues 
Problem:
Front ends seem to be experiencing a timing issue. 
I can visibly see a difference in the GPS time ticks between models running on c1ioo and c1sus. 
 In addition, the fb is reporting a 0x2bad to all front ends.  The 0x2000 means a mismatch in config files,
    Reply  Mon Nov 25 12:57:54 2013, Jamie, Update, CDS, timing problem at c1iscex IO chassis 
There is definitely a timing distribution malfunction at the c1iscex IO chassis.  There is no timing link between the "Master Timer Sequencer
D050239" at the 1X6 and the c1iscex IO chassis.  Link lights at both ends are dead.  No timing, no running models.
It does not appear to be a problem with the Master Timer Sequencer.  I moved the c1iscey link to the J15 port on the sequencer and it worked
    Reply  Mon Nov 25 17:28:33 2013, Jenne, Update, CDS, timing problem at c1iscex IO chassis 


    
        
            Quote:
        
        
            

           There is definitely a timing distribution malfunction at the c1iscex IO chassis.  There is no timing link between the "Master Timer
    Reply  Wed Nov 27 14:45:49 2013, Jenne, Update, CDS, timing problem at c1iscex IO chassis 
 [Koji, Jenne]
The new fiber arrived today, and we tried it out.  No luck.  We think it is the timing
card, so we'll need to get one, since we can't find a spare.
Entry  Wed Jul 4 17:33:04 2012, Jamie, Update, CDS, timing, possibly leap second, brought down CDS 
I got a call from Koji and Yuta that something was wrong with the CDS system.  I somehow had an immediate suspicion that it had something to do
with the recent leap second.
It took a while for nodus to respond, and once he finally let me in I found a bunch of the following in his dmesg, repeated and filling the buffer:
    Reply  Mon Aug 21 09:08:54 2017, Steve, Update, SUS, tiny glitches glitches.png
They are synchronised tiny glitches. They are not mechanical.
 
Entry  Tue Jan 22 09:18:50 2013, Steve, Update, Tip - Tilt, tip tilt bases ordered TTbc.PDF
The corrected drawing base for tip tilt with coils are going to the shop. The will be back by the end of the week.
Entry  Thu Oct 25 22:52:07 2012, janosch, Update, General, tip-tilt phase maps 6x
Now that I read Koji's last elog about phase maps, I am not sure if these are still required, but here they are (the tilt-removed phase maps of the Laser
Optik mirrors), first 1, 2, 3:
    Reply  Thu Oct 25 23:00:44 2012, Manasa, Update, General, tip-tilt phase maps 
Are these maps drawn from the data we extracted using Image SXM??
    Reply  Thu Oct 25 23:14:42 2012, janosch, Update, General, tip-tilt phase maps 


    
        
            Quote:

       
        
            
            Are these maps drawn from
    Reply  Mon Oct 29 11:27:42 2012, Manasa, Update, General, tip-tilt phase maps 6x
 [Jan, Manasa]
Below are phasemaps for the tip-tilts with both tilt and RoC removed. We have not used Koji's code; but tweaked the earlier code to remove curvature.
The RoC values matched approximately to that quoted by Gari Lynn ~700m.
    Reply  Mon Oct 29 14:57:41 2012, janosch, Update, General, tip-tilt phase maps 


    
        
            Quote:

       
        
            
             [Jan, Manasa]
Entry  Fri Feb 25 13:28:14 2011, kiwamu, Summary, General, to do list 
 Because it maybe useful to share this kind of information among us, I just put a to-do-list which has
been continuously noted in my laptop.
 I guess those items can be applied for the coming
two months (i.e. March and April). Anything else ?
-- Alignment
     - C1ASS
     
    Reply  Fri Feb 25 14:50:16 2011, Koji, Summary, General, to do list 
- Put priority on the list
- Put names on the items
- Where is the CDS TO DO ==> Joe
    Reply  Mon Feb 28 11:22:40 2011, josephb, Summary, General, to do list 

    
        
            Quote:
        
        
            
            - Where is the CDS TO DO ==> Joe
    Reply  Fri Feb 18 00:35:21 2011, kiwamu, Summary, General, to do list for Feb. 18th 
DAYTIME
  - 
more precise F2P measurement and modify lockin simlink model (Kiwamu)
Entry  Thu Feb 17 00:43:13 2011, kiwamu, Summary, General, to do list for tomorrow 
Let's share our tasks ! 
Entry  Sat Dec 26 10:34:43 2015, Steve, Update, General, today 1d.png
PMC locked manually and PRM sus damping restored.
Entry  Fri Aug 12 15:16:56 2011, jamie, Update, SUS, today's SUS overview SRM.pngITMY.pngBS.png
Here's an update of the suspensions, after yesterdays in-vacuum work and OSEM tweaking:

    PRM and ETMY are completely messed up.  The spectra are so bad that I'm not going to bother posting anything.   ETMY
has extreme sensor voltages that indicate that it's maybe stuck to one of the OSEMS.  PRM voltages look nominal, so I have no idea what's going on
Entry  Mon Sep 19 01:38:00 2011, kiwamu, Update, LSC, today's locking activity 
[Anamaria / Kiwamu]
 The incident beam pointing was improved by using PZT1 and PZT2. 
Entry  Tue Feb 15 11:53:02 2011, kiwamu, Summary, General, today's missions 
I think this week is going to be an "alignment week".
The goal is to get a good alignment on X arm for both the green and the IR beam in order to reduce a2l
couplings.
    Reply  Mon May 31 17:47:34 2010, kiwamu, Update, IOO, today's plan : MC alignment 
[Alberto, Kiwamu]
0. have a coffee and then dress up the clean coat.
1. level the MC table
Entry  Wed Apr 20 20:42:55 2011, kiwamu, Update, VIDEO, today's video session DSC_2931_ss.jpgDSC_2938_ss.jpg
[Steve / Suresh / Kiwamu]
90 % of unused video cables have been removed.
Still a couple of video cables are floating around the video MUX. They will be removed in the next week's session.
Entry  Tue Aug 16 04:28:09 2011, kiwamu, Update, General, today's work to do 
The main goal of today is to extract the pick-off beams 
Today's menu :
    Reply  Tue Aug 16 11:49:17 2011, jamie, jenne, Update, General, today's work to do 
>If necessary steer ETMs and ITMs to make the X and Y green beam flashing.
Green is now flashing in both X and Y arms
>Open the IOO and OMC chamber and lock MC.
    Reply  Tue Aug 16 17:09:55 2011, Jenne, Update, General, today's work to do 


    
        
            Quote:
        
        
            
              + Rotate the SRM tower to get the SRMI fringes on the AS CCD camera.
Entry  Tue Aug 31 14:47:53 2010, steve, Configuration, PEM, toilet upgrade toil-n.JPG
Our toilets were replaced by a green Gerber 1.6 gpf ( 6 lpf ) last week.
Entry  Wed Aug 29 14:51:05 2018, Steve, Update, General, tomorrow morning 
Electrician is coming to fix one of the fluorenent light fixture holder in the east arm tomorrow morning at 8am. He will be out by 9am.

The job did not get done. There was no scaffolding or ladder to reach troubled areas. 
Entry  Tue Sep 27 04:13:22 2011, kiwamu, Update, LSC, tonight's locking activity PRMI.png
The lock of PRMI wasn't so robust although it could stay locked for more than 10 minutes.
There have been 2-3Hz spikes in everywhere. It needs
Entry  Mon May 2 21:14:55 2011, kiwamu, Update, Electronics, too loose Heliax connectors on 1Y2 rack DSC_2982_ss.jpgDSC_2984_ss.jpg
I found that all the Heliax cables landing on the bottom of 1Y2 were too loose.
Due to this loose connection the RF power at 55 MHz varies from -34 dBm
    Reply  Mon May 2 23:29:57 2011, Suresh, Update, Electronics, too loose Heliax connectors on 1Y2 rack 
The countersink gives rise to another problem when we mount the N-type-to-SMA bulkhead adaptor.  As we are making
a circular hole in the plastic strip (instead of a hole with two flat sections)  the adaptor is free to turn when we tighten it with a wrench. 
We currently hold the smooth circular part on the other side with a gripping pliers and while tightening.  If that part disappears into the countersink
    Reply  Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp 
New Wiha 28504 torque
wrench for SOS wire clamping. It's range 7.5  - 20 in-lb in 0.5 steps [ 0.9 - 2.2 Nm ] Audible and perceptible click when the pre-set torque has
been attained at ±6% accuracy.  
Entry  Thu Apr 23 15:40:41 2015, Steve, Update, General, torque for 1/4-20 snapon.jpgQJR117E.jpg
 

Few 1/4 -20 socket cap head screw with washers were tested for optimum torque.

QJR 117E Snap On  torque wrench was used. I found that 40 lb in was enough.
    Reply  Fri Apr 24 18:13:36 2015, rana, Update, General, torque for 1/4-20 
For 1/4-20 bolts made of 18-8 Stainless Steel, the recommended torque varies from 65-100 inch-pounds, depending upon the application,
the lubrication, how loose the bolt is, if there's a washer, etc.

For our case, where we are going into a tapped, ferromagnetic stainless table, its less clear, but it will certainly by in the 60-80 range. This
Entry  Sat Mar 28 03:21:49 2015, den, Update, LSC, towards angular ff 
Tonight I measured seismic noise coupling to beam spot on PR2. There is coherence of 0.9 from X to PIT and Y to YAW around the stack resonances. TF was
fited using vectfit and put into static matrix of oaf in the elements T240X -> PRM PIT, T240Y -> PRM YAW. I think we should actuate on the error
point of the PRM OL but I decided not to go for a model change tonight. Data from seismometers and POP QPD was obtained during the UTC time 04:06:00 -
Entry  Fri Mar 21 09:02:03 2008, steve, Update, VAC, tp 2 failed 
Small turbo #2 is the forepump of the maglev.
It failed last night, shut down the  maglev and interlock closed V1
Ifo pressure is 20 mTorr now. The Yarm was still locked at 8am this morning.
    Reply  Fri Mar 21 11:54:38 2008, rob, Update, VAC, tp 2 failed 
[quote]Small turbo #2 is the forepump of the maglev.
It failed last night, shut down the  maglev and interlock closed V1
Ifo pressure is 20 mTorr now. The Yarm was still locked at 8am this morning.
Entry  Thu Mar 20 15:28:20 2008, steve, Update, VAC, tp2 's drypump replaced 
The fore pump of tp2 was replaced at fore line pressure 998m Torr
Entry  Fri Jan 9 16:52:18 2009, steve, Update, VAC, tp3 forline pump replaced 
Alberto took 40m vacuum 101 class as we replaced the drypump at the annulus pump line.

He is still not authorized to use the monster 2 3/8" open end wrench that is 36" long.
ELOG V3.1.3-